Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Santa Cruz Wharf South Landing Engineering Services

Open
RFQ No. Parks and Recreation -0335State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Cruz is soliciting engineering services for the construction of the Santa Cruz Wharf South Landing, located between Bents 148-169. This project, part of the 2014 Wharf Master Plan revised in 2024, involves immediate planning, environmental review, and permit applications, with a final construction deadline of 2034. The selected engineer will be responsible for critical deliverables, including a 100-year design wave analysis report, bid support, and the production of final as-built drawings. All project specifications must follow the Construction Specifications Institute division format, and the access ramp must adhere to ADA standards with a maximum 1:12 slope. The procurement process utilizes a qualifications-based selection where the top three engineers are ranked by qualification regardless of cost. The city then verifies that the highest-ranked engineer's fee does not exceed the project budget, with the right to negotiate pricing or move to lower-ranked candidates if necessary. Proposals must be submitted by December 15, 2026, consisting of one printed hard copy and one searchable PDF on a USB drive, with the fee proposal submitted in a separate sealed envelope. The resulting Professional Services Agreement is contingent upon sufficient funding from city, state, or federal sources, and requires compliance with California prevailing wage laws and equal employment opportunity regulations. Payments are issued monthly within 30 days based on itemized invoices detailing time worked and task completion percentages.

General Info

Santa Cruz seeks engineering services for the Santa Cruz Wharf South Landing project.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstrfq
High

Read the document

Due in 30 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 30 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Parks and Recreation
Contacts1 person available
OfficeSanta Cruz, CA, 95060, USA

Interested Companies (11)

CA Traffic SolutionSacramento, California
Cornerstone Earth GroupSunnyvale, CA
Far Western Anthropological Research GroupDavis, CA

See All 11 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The 2014 Santa Cruz Wharf Master Plan (WMP) as revised and approved in 2024 envisions the construction of the Santa Cruz Wharf South Landing (Project) located at the seaward end of the Santa Cruz Wharf between Bents 148-169. The City intends to immediately proceed with planning, environmental review, and permit application for the Project, and complete construction by no later than 2034.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFQ-RFP INFLOW AND INFILTRATION ENGINEERING SERVICES FOR WATER & SEWER
Solicitation # 26/27-19
The Town of Manchester Water and Sewer Department is seeking professional engineering services to conduct a comprehensive Inflow and Infiltration (I&I) investigation and Sanitary Sewer Evaluation Survey (SSES) for its sanitary sewer collection system. The project aims to address aging infrastructure and excessive wet-weather flows that increase the risk of sanitary sewer overflows and basement backups. The selected firm will be responsible for analyzing existing system data, performing field investigations—including smoke testing, dye testing, and CCTV inspections—and quantifying wet-weather peaking factors. The ultimate goal is to produce a prioritized, GIS-integrated rehabilitation roadmap that distinguishes between public-side defects and private-side contributions to ensure long-term regulatory compliance with Connecticut DEEP NPDES requirements. Proposals must be submitted electronically via the Town of Manchester OpenGov portal by December 3, 2026. The award will be based on the best suited and most advantageous proposal, with cost being only one of several evaluation factors. Required documentation includes a separate proposal, a completed IRS Form W-9, a SAM.GOV registration number, and a Living Wage Certification. Contractors must maintain professional liability and cyber risk insurance of at least $1,000,000 and adhere to the Manchester Living Wage Ordinance if the contract value exceeds $25,000 in a fiscal year.
Water and Sewer

POSTED

about 2 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
2708RFQ - Utilities Continuing Services
Solicitation # 2708RFQ
The City of Daytona Beach is soliciting proposals for professional engineering services to support the Utilities Department Capital Improvement Program through a continuing contract structure. The scope is divided into three primary categories: Information Technology, SCADA, and Telecommunications; Stormwater Management; and Water and Reuse Distribution/Wastewater Collection, as well as Water Supply and Treatment/Wastewater Treatment. Services will be performed on a work authorization basis and include planning, design, cybersecurity guidance, and construction engineering inspection. All work must adhere to the most recent City of Daytona Beach technical standards and Standard Details. Qualified firms must be registered with the State of Florida Board of Professional Engineers and submit separate proposal documents for each category they wish to be considered for via the OpenGov platform. Awards will be based on the best overall value rather than the lowest cost, with evaluation weights assigned to the ability of professional personnel (35%), firm experience (30%), and the ability of the project team (25%). Key compliance requirements include adherence to WCAG 2.0 AA for online services, Clean Air Act regulations for contracts exceeding 150,000 dollars, and specific lobbying certifications for offers exceeding 100,000 dollars. The response deadline is December 17, 2026.
Utilities Department

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Parks and Recreation

Same awarding agency

NAICS: 561730
New
SLED
Median Landscape & Hardscape Maintenance Program
Solicitation # PR-0333
The City of Santa Cruz Parks and Recreation Department is seeking proposals from qualified C-27 Landscaping Contractors to implement a median maintenance program covering approximately 13 miles of landscaped and hardscaped street medians and roundabouts. The scope of work includes weed control, litter and debris removal, mulch application, pruning, irrigation adjustments, hardscape cleaning, and seasonal planting. Services are divided into three priority tiers: weekly full service, standard service every six weeks, and limited service every six months. The project has a strict annual budget of $125,000.00, and any proposals exceeding this amount will be disqualified. Contractors must adhere to rigorous industry standards, including California Landscape Contractors Association norms, UC IPM Guidelines, and Cal/OSHA safety regulations. Specific requirements include the use of CA MUTCD for traffic control and strict compliance with the city's prohibition of gas-powered leaf blowers. The contractor must hold a Qualified Applicator's License from the California Department of Pesticide Regulation and follow detailed pesticide application and posting protocols. Award selection is based on a best-value ranking system, and the successful firm must comply with prevailing wage laws and provide performance and payment bonds for public works. Payments are issued monthly within 30 days based on itemized invoices.
Landscaping Services

POSTED

4 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS