Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

FURNISH AND INSTALL GENERATOR AT LOVE LANE

Open
26/27-20State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

CT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → Water and Sewer
Contacts2 people available
OfficeManchester, CT, 06040, USA
Organization / AgencyConnecticut → Water and Sewer
Office AddressManchester, CT, 06040, USA
Contacts
Gabriel D'AlatriProject Manager
Cora NarracciPurchasing Agent

Full Description

Show more
The Love Lane Pump Station (90 Love Lane, Manchester, CT 06040) is a critical sewage pump station serving the Town of Manchester. Continuous operation of the station is required to prevent backups and protect public health and the environment. During a utility power outage, the station must continue to pump peak flows and maintain monitoring and alarm functions. A September 2, 2026 load study established the electrical demands of the station, including the existing 3 HP pumps and miscellaneous loads. The study confirmed the need for a permanently installed standby diesel generator capable of starting and running the station loads within the voltage and frequency dip limits required by code, with automatic start and transfer in 10 seconds or less (NFPA 110 Level 1, Type 10). The generator, dual-wall sub-base fuel tank, and automatic transfer switch must be installed at or above the base flood elevation plus 2 feet (or the stricter applicable elevation). On-site fuel storage must support a minimum of 48 hours of operation at 100 percent of the generator's standby rating without refueling. Alarm contacts for generator run, fail-to-start, low fuel, high fuel, rupture basin, ATS position, and common alarm must be provided for connection to the existing station telemetry system. This project provides a complete turnkey solution—generator, sound-attenuated enclosure, tank, transfer switch, concrete pad, wiring, startup, testing, training, and initial fuel fill—to ensure reliable emergency power for the Love Lane Pump Station in accordance with NEIWPCC TR-16, NFPA standards, and Connecticut requirements.

More opportunities from Connecticut → Water and Sewer

Same awarding agency

NAICS: 237110
SLED
FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY
Solicitation # 26/27-17
The Town of Manchester, Connecticut, is soliciting proposals for solicitation number 26/27-17 to furnish and install inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The scope of work includes the repair of the trough discharge point, including all necessary piping, fittings, supports, and seals to ensure a watertight and serviceable discharge consistent with previously repaired siphons. All materials used must be equal or superior to those used on Siphons 2 and 4 and must be NSF/ANSI 61-compliant for potable water service. The project requires a phased approach where Siphon 1 must be tested and operational for one week before work begins on Siphon 3. Proposals are due by November 17, 2026, via the OpenGov portal. The award will be based on a weighted evaluation of price (50%), project schedule (25%), and familiarity with the Globe Hollow Water Treatment Plant (25%). Bidders must provide a bid bond or cashier's check for 5% of the total bid and must be prepared to provide performance and labor and materials bonds equal to 100% of the contract price upon award. Compliance with Connecticut prevailing wage laws and OSHA 10-hour construction safety certification for all employees is mandatory. Required submission documents include a current W-9, SAM registration number, FEIN/EIN, a five-year project history, and a detailed project approach.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS