Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY

Active
26/27-17State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Town of Manchester, Connecticut, is soliciting proposals for solicitation number 26/27-17 to furnish and install inserts for Siphons 1 and 3 at the Globe Hollow Water Treatment Facility. The scope of work includes the repair of the trough discharge point, including all necessary piping, fittings, supports, and seals to ensure a watertight and serviceable discharge consistent with previously repaired siphons. All materials used must be equal or superior to those used on Siphons 2 and 4 and must be NSF/ANSI 61-compliant for potable water service. The project requires a phased approach where Siphon 1 must be tested and operational for one week before work begins on Siphon 3. Proposals are due by November 17, 2026, via the OpenGov portal. The award will be based on a weighted evaluation of price (50%), project schedule (25%), and familiarity with the Globe Hollow Water Treatment Plant (25%). Bidders must provide a bid bond or cashier's check for 5% of the total bid and must be prepared to provide performance and labor and materials bonds equal to 100% of the contract price upon award. Compliance with Connecticut prevailing wage laws and OSHA 10-hour construction safety certification for all employees is mandatory. Required submission documents include a current W-9, SAM registration number, FEIN/EIN, a five-year project history, and a detailed project approach.

General Info

Manchester, CT seeks proposals to install inserts for siphons at Globe Hollow.

NAICS

N/A

Place of Performance

CT, USA

Set-Aside

NONE

Documents

23

20260316 General Arrangement

PDF, High priority: read this firstspecifications
High

20260316_Parking_stand_install.pdf

PDF, High priority: read this firstspecifications
High

Castor Assembly Specifications G.C.12392

PDF, High priority: read this firstspecifications
High

Connecticut Department of Labor Contractor's Wage Certification Form

PDF, High priority: read this first1 page · wage-determination
High

Connecticut Department of Labor Payroll Certification Form (WWS-CP1/CP2)

PDF, High priority: read this first3 pages · wage-determination
High

Connecticut Department of Labor Prevailing Wage Footnotes (July 1, 2025)

PDF, High priority: read this first2 pages · wage-determination
High

CTDOL Prevailing Wage Informational Bulletins

PDF, High priority: read this first9 pages · wage-determination
High

CTDOL Prevailing Wage Poster

PDF, High priority: read this first1 page · wage-determination
High

Distribution Systems Inc. Cable Assembly for Motor Control Specifications

PDF, High priority: read this firstspecifications
High

Drive Installation Technical Details

PDF, High priority: read this firstspecifications
High

Float Assembly 2 - Flowt Frame

PDF, High priority: read this firstspecifications
High

Floating Syphon Specifications

PDF, High priority: read this firstspecifications
High

Globe Hollow Water Treatment Facility - Prevailing Wage Rate Schedule

PDF, High priority: read this first9 pages · wage-determination
High

Idler Assembly - Far End Shale Specifications

PDF, High priority: read this firstspecifications
High

Notice to Mason Contractors - Prevailing Wage Forklift Operator Classifications

PDF, High priority: read this firstwage-determination
High

Prevailing Wage Payroll Certification Form Sample

PDF, High priority: read this first2 pages · wage-determination
High

Prevailing Wage Rates Information - July 1, 2025

PDF, High priority: read this first2 pages · wage-determination
High

RFP 26/2717: Furnish and Install Inserts for Siphons 1 & 3 - Globe Hollow WTP

PDF, High priority: read this first25 pages · rfp
High

Richards Oakgrove Inc. - Skid Plate Assembly Specifications

PDF, High priority: read this firstspecifications
High

Syphon Pipe Assembly 2

PDF, High priority: read this firstspecifications
High

Syphon Pipe Assembly - Platen Detached

PDF, High priority: read this firstspecifications
High

202603160_cone_valve_assembly.pdf

PDF, Low priorityother
Low

Town of Manchester 2026 Holiday Calendar

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConnecticut → Water and Sewer
Contacts2 people available
OfficeManchester, CT, 06040, USA
Organization / AgencyConnecticut → Water and Sewer
Office AddressManchester, CT, 06040, USA
Contacts
Gabriel D'AlatriProject Manager
Cora NarracciPurchasing Agent

Interested Companies (3)

TradeMark ContractorsBristol, CT
Leed ConstructionMiddlefield, CT
jhgfytretretr

Full Description

Show more
The Manchester Water and Sewer Department operates water and wastewater treatment facilities serving Manchester, Connecticut, and portions of Glastonbury and surrounding towns. The water system includes approximately 16,500 domestic service lines, 1,047 fire and irrigation services, and delivers an average of 5 million gallons of water daily. The water supply consists of seven reservoir impoundments and ten groundwater wells, with a total capacity of 9.8 million gallons per day. Globe Hollow Water Treatment Plant, located at 125 Spring Street, treats reservoir water and supplies multiple pressure zones. Original siphon piping at the plant dates to 1986. Material-specific drawings will be provided as part of the bid package. Siphon Nos. 2 and 4 have already been repaired. This solicitation covers Siphon Nos. 1 and 3 and the trough discharge point so that all four units are consistent

More opportunities from Connecticut → Water and Sewer

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS