Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Electrical Receptacle and Outlet Upgrades

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Housing AuthorityView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Los Angeles, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 231596.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Utility Room Upgrades

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Housing Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Housing Authority
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install new electrical outlets and GFCI receptacles in utility rooms to support upgraded equipment and meet current electrical code.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
MAIN GROUNDING ELECTRODE
Solicitation # WL-26-006
The Woodland Job Corps Center, operated by Adams and Associates for the U.S. Department of Labor, is soliciting proposals from licensed electrical contractors to inspect and repair main grounding electrode systems in Laurel, Maryland. The scope of work involves correcting improperly sized grounding electrode conductors in the Aspen Dorm, Vocational Building, Willow Hall, Holly Dorm, Maple Dorm, and Oak Dorm, as well as the full installation of a main grounding electrode in the Administration Building. All work must comply with NEC 2023, 250 standards and include specific deliverables such as #2/0 AWG conductors, 16x2 ground bars, and 8-foot ground rods. The project requires a sequenced construction schedule to be submitted within 10 days of the Notice to Proceed, with work commencing within 14 days of that notice. This is a small business set-aside opportunity with a proposal deadline of September 3, 2026, and a mandatory site visit on August 20, 2026. Award will be based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Qualified offerors must provide a lump sum cost proposal on company letterhead, a valid Maryland contractor's license, and proof of insurance, including automobile liability and workers' compensation. The contract includes a one-year workmanship guarantee and net 30 payment terms. Final acceptance is contingent upon a substantial completion walk-through, the submission of certified payroll records, and the release of liens from all subcontractors and suppliers.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 16 hours ago

DEADLINE

in about 4 hours
View Details
NAICS: 238210
New
PANELBOARDS
Solicitation # WL – 26 -0004
This subcontracting opportunity, managed by Adams and Associates for the Woodland Job Corps Center in Laurel, Maryland, requires the repair and labeling of electrical panelboards to ensure compliance with NEC 2023 standards. The scope of work includes providing complete, non-handwritten circuit directories for panelboards in the basement mechanical room, first-floor food preparation area, dishwasher room, and electrical room. Additionally, the contractor must install UL listed red mark labels on the fire alarm control panel power supply breakers and replace any missing panelboard covers. The project requires a one-year guarantee on workmanship and manufacturer products, with all work adhering to EPA and OSHA regulations. The award will be based on best value rather than the lowest price. Interested offerors must be licensed contractors in the state of Maryland and provide a single lump sum bid with a detailed cost breakdown for labor, materials, and equipment. Mandatory requirements include attendance at the pre-bid site visit and the submission of a 90-day bid guarantee, a timeline for substantial completion, and certification of compliance with Service Contract Labor Standards wage determinations. Selected contractors must provide proof of automobile liability and workers' compensation insurance, naming Adams and Associates, Inc. as an additional insured. Work must commence within 14 days of the Notice to Proceed, and payment is set at Net 30 terms.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 16 hours ago

DEADLINE

in about 4 hours
View Details
NAICS: 238210
New
SLED
Audio Visual Pool Refresh
Solicitation # university-of-washington-1255198
The University of Washington is seeking to establish one or more contracts through solicitation number university-of-washington-1255198 to secure suppliers for audio visual equipment, design, installation, rentals, event services, and maintenance. These services will support a variety of environments including classrooms, lecture halls, historic performance venues, stadiums, and other indoor and outdoor spaces. Eligible firms must be available for work in Washington State and submit all required documentation by the response deadline of October 23, 2026. An optional pre-bid meeting is scheduled for September 18, 2026. The contractual framework incorporates several critical compliance and technical requirements. This includes adherence to IT security terms, a data processing agreement for personal data, and a digital accessibility rider requiring compliance with WCAG 2.2 AA standards. Additionally, projects involving the built environment must comply with an IoT rider covering patch plans, commissioning, and cyber liability insurance. The standard agreement structure typically features a one-year base term with potential extensions up to ten years, utilizing Net 30 payment terms. Specific project components, such as the Alaska Airlines Arena LED Display Systems Modernization, require detailed bid forms covering technical specifications, installation, and extended warranty pricing.
University of Washington

POSTED

about 22 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → Housing Authority

Same awarding agency

NAICS: 236118
SLED
Utility Room Upgrades
Solicitation # 231596
The Housing Authority of the City of Los Angeles (HACLA) is soliciting quotes for comprehensive upgrades to nine utility rooms at its headquarters located at 2600 Wilshire Blvd., Los Angeles, California. This small purchase construction project, identified as QSP M22, requires a licensed B - General Building Contractor to provide all labor, materials, and equipment. The scope of work includes specific mechanical installations such as venting for under-sink water chillers and the use of designated materials, including Wilsonart Plastic Laminate and Caesarsstone Pure White countertops. The project has an estimated completion time of 60 days and is funded by non-federal sources, with a total procurement value not exceeding the small purchase threshold of 350,000 dollars. The contract will be awarded to the responsible contractor offering the lowest acceptable price, with evaluation based on a base bid and prioritized alternative items for C-Level IT and Mezzanine work. Applicants must submit a signed quote form, non-collusion declaration, subcontractor list, and Section 3 certifications in PDF format. Key requirements include compliance with California prevailing wage laws, DIR registration, and a 30 percent new hire benchmark for Section 3 workers. Additionally, contractors must provide a payment bond if the award exceeds 25,000 dollars and maintain workers compensation insurance of 1 million dollars. Payments are processed via automated deposit in arrears, with a 5 percent retention withheld until 60 days after project completion.
Residential Remodelers

POSTED

14 days ago

DEADLINE

in 11 days
View Details