Electrical Switchgear & Distribution Modifications
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for Electrical Switchgear and Distribution Modifications involves performing critical electrical system upgrades for prime contractors at City of Fresno wastewater facility projects. The scope of work includes the installation of automatic transfer switches, modifications to existing switchgear, wiring for the Headworks electrical system, and various panel upgrades utilizing high-voltage cabling. The ultimate goal is to deliver a fully modified electrical distribution system featuring integrated transfer capabilities. To qualify for this project, the contractor must be a Licensed Electrical Contractor and ensure all work is performed in strict compliance with NFPA 70 standards. The work is located in Fresno, California, under NAICS code 238210, and is scheduled for posting in June 2026.
General Info
Agency
Place of Performance
Fresno, CA, 93706Set-Aside
Documents
This scope was carved out of TC00185-EP007.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Emergency Power Generator B Switchgear and Headworks, EP007
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
