Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Electrical Systems and Plant Control (SCADA)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Seguin involves the installation of electrical systems and plant controls for water treatment plant projects. The scope of work includes installing low-voltage cabling, raceways, switchboards, and wiring devices, as well as performing grounding, bonding, and programming for the Plant Control System Supplier integrated system. The primary objective is to deliver fully operational electrical power and SCADA systems. The opportunity is categorized under NAICS code 238210 and was posted on August 19, 2026. Interested parties must submit their responses by the deadline of September 29, 2026.

General Info

Electrical and SCADA installation for City of Seguin water treatment plant projects.

Agency

Texas → City of SeguinView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of AF-2026-64.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

WATER TREATMENT PLANT 94 FT UPFLOW CLARIFIER NO. 3 PUMP STATIONS IMPROVEMENTS

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City of Seguin
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → City of Seguin
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs electrical systems and plant controls for prime contractors on City of Seguin water treatment plant projects. Installs low-voltage cabling, raceways, switchboards, and wiring devices. Performs grounding, bonding, and programming of the Plant Control System Supplier (PCSS) integrated system. Delivers operational electrical power and SCADA systems.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves the comprehensive upgrade of the facility's lighting systems, including the installation of energy-efficient LED fixtures and occupancy sensors, as well as the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated value of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. The contractor is responsible for providing all engineering, labor, equipment, and materials, ensuring compliance with IES standards, the Davis-Bacon Act, ADA, OSHA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and final as-built drawings and warranty documentation at closeout. Additionally, the contractor must provide a minimum two-hour training session for facility maintenance personnel and supply 5 percent attic stock. Award will be based solely on the lowest total evaluated price. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238210
New
SLED
B4213 Replace Fire Alarm System
Solicitation # N400857504546
Solicitation N400857504546 is a task order under a Multiple Award Construction Contract for the replacement and upgrade of the fire alarm and mass notification system in Building 4213 at MCAS Cherry Point, North Carolina. The project involves the demolition of existing components and the installation of a new fully addressable fire detection and notification system, including VESDA panels and associated electrical modifications across both floors. The work must be performed while the building remains occupied and must adhere to NFPA 72, UFC, IBC, and Buy American standards. The estimated cost of the project is between 500,000 and 1,000,000 dollars, with a completion period of 270 calendar days. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 24, 2026. For proposals exceeding 150,000 dollars, a bid bond must be submitted with the proposal, and payment and performance bonds will be required upon award. Key administrative requirements include a partnering session within 45 days of award, compliance with the Davis-Bacon Act and Executive Order 13706 regarding paid sick leave, and strict adherence to cybersecurity and CUI documentation standards. Quality assurance is managed through a series of inspections, including a Contractor QC Plan, a pre-final punch list, and a final acceptance inspection.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC), requires the provision and installation of two 40-foot steel FLEXTAINER conex offices for forensic personnel at the HSI Facility in St. Thomas, US Virgin Islands. The project scope includes the construction of two 42 by 10 by 6-inch reinforced concrete slabs and the installation of units equipped with split-system air conditioning, R-11 insulation, vinyl flooring, LED lighting, and security features including steel doors with Cypher locks and security windows. The contractor is also responsible for connecting the units to the nearest electrical circuit using PVC or uPVC conduit and providing fire extinguishers. The estimated magnitude of the project is between 250,000 and 300,000 dollars, with a total period of performance of 364 calendar days from the Notice to Proceed. The award will be based on the lowest total evaluated price, though proposals will be evaluated on technical approach, safety and quality control plans, and price. Compliance with the Buy American Act and the Davis-Bacon Act for prevailing wage rates in the Virgin Islands is mandatory. Key administrative requirements include the submission of a project schedule within 15 days of the Notice to Proceed, electronic invoicing via the Invoice Processing Platform with certified payroll, and strict adherence to DHS security protocols, including the signing of non-disclosure agreements and PIV card requirements for personnel. All work must comply with NFPA 70 and International Building Code standards, and a mandatory site survey must be conducted prior to proposal submission.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # cbp-replacement-fiber-line
The Earle C. Clements Job Corps Center, operated by Management and Training Corporation for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to replace existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling. The project involves removing retired aerial fiber lines and splice boxes and installing new 12 strand single mode aerial fiber to provide network connectivity between the building 2436 network closet (MDF) and the building 2443 Maintenance office (IDF) in Morganfield, Kentucky. The contractor is responsible for providing all labor, equipment, and materials, including Belden FS3L0024NS fiber or an equivalent, fiber supports, enclosures, adapter panels, and lift rentals. Bids are due by October 5, 2026, and will be evaluated based on overall best value. Mandatory submission requirements include a completed bid sheet, a detailed cost breakout, proof of insurance, and a bid bond guarantee. A physical site visit and signature on the attendance roster are required prior to bidding. For awards equal to or greater than 25,000 dollars, performance and payment bonds from a surety company with at least an A- rating are required. The contract is set aside for various small business categories and requires compliance with the Davis-Bacon Act wage determinations for Kentucky, as well as federal regulations regarding the Buy American Act and the protection of sensitive government information.
Earle C. Clements Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 15 days
View Details
NAICS: 238210
New
Los Angeles Job Corps Egress Lighting
Solicitation # Emergency Egress Lighting
Management & Training Corporation (MTC) is seeking a small business electrical contractor under NAICS code 238210 to provide emergency egress lighting services for the Los Angeles Job Corps center. The project requires the furnishing and installation of four new dual-head emergency egress light fixtures at a warehouse facility located at 424-426 Towne Avenue, Los Angeles, California. The selected contractor must ensure all work complies with applicable building, fire, electrical, and life safety codes, and is responsible for the removal and disposal of all installation debris. This is a subcontracting opportunity where the award will be based on best value. Bidders must submit a lump sum fee that includes all labor, transportation, and supervision, along with a bid sheet, three references, proof of insurance, and a completed supplier packet containing a W-9 and self-certification form. Compliance with Service Contract Labor Standards is mandatory, specifically Wage Determination SCLS 2015-5613 Revision 31. Submissions are due via email to Procurement Specialist Frances McGraw by September 25, 2026. The contract includes strict requirements regarding the protection of sensitive government information and mandates adherence to various FAR clauses, including those related to combating trafficking in persons and the utilization of small business concerns.
MTC Los Angeles Job Corps

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Texas → City of Seguin

Same awarding agency

NAICS: 237110
SLED
WATER TREATMENT PLANT 94 FT UPFLOW CLARIFIER NO. 3 PUMP STATIONS IMPROVEMENTS
Solicitation # AF-2026-64
The City of Seguin is soliciting a general contractor for the Water Treatment Plant 94 ft Upflow Clarifier No. 3 and Pump Stations Improvements project, identified as solicitation AF-2026-64. The scope of work includes the construction of a 94 ft diameter concrete upflow clarifier and comprehensive improvements to three pump stations: Raw Water Pump Station No. 2, High Service Pump Station No. 2, and the Industrial High Service Pump Station. Additional requirements involve modifications to 2.0 mgal and 3.0 mgal ground storage tanks, as well as the installation of piping, electrical systems, SCADA, and sitework. All equipment must be certified to NSF/ANSI Standards 61 and 372 and comply with the US Safe Drinking Water Act. The project must also adhere to federal, state, and local accessibility standards, including TDLR requirements. The contract is estimated at 17,500,000 dollars, with an award based on the lowest responsible bidder. Evaluation criteria include the offeror's experience, reputation, safety record, financial capability, and proposed personnel. The performance period is 540 consecutive calendar days for substantial completion, starting within ten days of the notice to proceed. Bidders must provide a bid bond of at least 5 percent of the total bid, and the successful contractor must provide performance and payment bonds for 100 percent of the contract price. Payment terms are set at 30 days following the receipt of an accurate invoice and acceptance of services. The Purchasing Manager serves as the primary point of contact for contract administration.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS