Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Electronic Rack Integration and Fabrication Supplier

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity is for an Electronic Rack Integration and Fabrication Supplier to support prime contractors on Air Force projects for the Arnold Engineering Development Complex. The selected supplier will be responsible for the procurement, fabrication, and assembly of modular 19-inch test equipment racks equipped with casters. Key technical requirements include the integration of computers, simulators, and instruments according to specific electrical schematics, as well as the installation of power distribution units and cable management systems. The final deliverable is a fully assembled and wired 19-inch rack system. To be eligible for this contract, suppliers must maintain CMMC Level 2 certification. Responses to this solicitation are due by November 12, 2026, for work managed under the Department of Defense.

General Info

CMMC Level 2 supplier for Air Force electronic rack fabrication by November 12, 2026.

NAICS

235310 - Electrical Contractors

Place of Performance

0, NM, USA

Set-Aside

NONE

Documents

This scope was carved out of FA9101269ANSEL.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RWP - Advanced Navigation Simulation Environment Laboratory (ANSEL)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and assembles physical housing and integration for prime contractors on Air Force (AEDC) projects. Procures and assembles modular 19-inch test equipment racks with casters and integrates instruments, simulators, and computers per electrical schematics. Requires cable management systems and power distribution units. CMMC Level 2 required. Delivers fully assembled and wired 19-inch rack system.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 541330
New
Federal
RWP - Advanced Navigation Simulation Environment Laboratory (ANSEL)
Solicitation # FA9101269ANSEL
The Advanced Navigation Simulation Environment Laboratory (ANSEL) project is a solicitation for the design, procurement, and delivery of a state-of-the-art simulation system to modernize Position, Navigation, and Timing (PNT) and Navigation Warfare (NAVWAR) capabilities at the Holloman AFB PNT Simulation Laboratory. Issued under 10 U.S.C. Section 4022 Other Transaction Authority (OTA), the effort focuses on establishing a rigorous verification and validation (V&V) and cyber direct-inject test capability. The system must support extreme dynamic conditions, including 6-DoF trajectory models with speeds up to Mach 20, 50g acceleration, and 200 g/s jerk, while providing phase-coherent, multi-channel RF simulation for mGNSS, alternative RF (XONA/STL), and jamming or spoofing environments. The acquisition is structured around eight milestones, with Base Milestones 1, 2, and 4 requiring Firm-Fixed Pricing and the remaining milestones utilizing Rough Order of Magnitude (ROM) estimates. Key deliverables include a fully integrated Operational Utility Prototype housed in 19-inch racks, comprehensive design documentation, and all technical data delivered with Unlimited Data Rights. Evaluation is a three-step process focusing on compliance, technical capability—specifically in RF phase calibration and signal integrity—and cost realism. Applicants must provide CMMC Level 2 self-certification and adhere to strict Controlled Unclassified Information (CUI) management protocols. Submissions are due by November 12, 2026, via SAM.gov.
Engineering Services

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details
NAICS: 561210
New
Federal
Facility Support Services III - Draft RFP Questions and Answers
Solicitation # FA9101FSSIII_QAs
The Facility Support Services III (FSS III) acquisition, managed by the Air Force Test Center's Arnold Engineering Development Complex, is a total small business set-aside intended to provide comprehensive facility support. The scope of work includes security services and the Fire Emergency Services (FES) program, requiring the staffing and operation of fire trucks in compliance with NDAA Section 388. Performance is centered at Arnold AFB in Tennessee, with additional support requirements at AEDC White Oak, Maryland, and EDC Moffett Field. The contract includes a cost-reimbursement no-fee line item for supplemental work such as emergency responses to unforeseen events and unscheduled surge support. Key requirements for award include CMMC Level Z self-certification and compliance with DFARS 252.204-7012 regarding the implementation of NIST SP 800-171. Security is a critical component, with secret clearances required for security services personnel and environmental program management, as well as the ability to operate C2 systems including SIPRNET. Evaluation for award will be based on the Total Evaluated Price and the quality of the Mission-Essential Contractor Services Plan. Proposals must adhere to strict formatting guidelines, including a 12-point Times New Roman font for past performance submissions and the use of a specific cost model in Attachment L-7.
Facilities Support Services

POSTED

3 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS