Elevator Electrical Subcontractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of CR27026.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

DFCM Construction - Standard Low Bid - Utah Valley University- UCCU Event Center Elevator Modernization - Project #27296790

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / AgencyUtah
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs electrical infrastructure for prime contractors on State of Utah DFCM facility projects. Installs lighting, GFCI outlets in pits and machine rooms, and a three-phase mainline copper power feeder with true earthen grounding to elevator controller terminals. Installs protected, lockable open disconnects with auxiliary contacts per local electrical codes and State of Utah High Performance Building Standards. Delivers tested power and lighting systems.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
26-169
Solicitation # SJPC-26-169
The South Jersey Port Corporation is soliciting proposals for the Balzano Lift Truck project in Camden, New Jersey, to install electric vehicle charging infrastructure at the Balzano Marine Terminal. The scope of work includes the installation of one 1MVA transformer, one 1200A main disconnect, a 480V panel, and two 200kW chargers to support two Taylor ZLC-995 top loader trucks. Additionally, the project requires one 112.5kVA transformer, a 208V panel, and five 11.5kW chargers to support five Ford Lightning work trucks. The contractor is responsible for all labor, tools, and materials, including the installation of underground conduits, ground rings, precast transformer pads, and the restoration of blacktop following construction. All work must comply with NEC 2020 Article 110, NFPA 70E, and Build America, Buy America (BABA) requirements. The contract will be awarded to the lowest responsible bidder. Bidders must submit a bid security of 10 percent of the total bid price, capped at 20,000 dollars, along with a consent of surety for performance and payment bonds. Compliance with New Jersey state regulations is mandatory, including Executive Order 151 regarding equal employment opportunity, prevailing wage determinations, and a goal to award 25 percent of the contract to registered Small Business Enterprises. Bidders must also provide a New Jersey Election Law Enforcement Commission contribution disclosure affidavit. Final acceptance of the project requires formal written approval from the South Jersey Port Corporation following performance testing and the submission of redline drawings.
South Jersey Ports

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Utah

Same awarding agency

NAICS: 541512
New
SLED
RFP - Enterprise Work Order Management System
Solicitation # HERR10082026
Herriman City is soliciting proposals for a modern Enterprise Work Order Management System designed to streamline office and field workflows through tight integration with a Geographic Information System (GIS). The system must support bidirectional GIS functionality, comprehensive resource tracking for equipment, labor, and materials, and native mobile applications with full offline capabilities. Key technical requirements include a scheduling engine for preventative maintenance, native or API connections to core systems such as Bluestakes, and the migration of legacy data from a Serviceaid SQL database. Additionally, the solution must provide custom reporting dashboards, a public-facing citizen portal, and specific reporting capabilities for Stormwater Pollution Prevention Plan compliance. Proposals are due by November 30, 2026, and must be submitted electronically to Steven Brown. Submissions must include an executive summary, technical architecture and security details, a functional response, an implementation and data migration plan, and an all-inclusive cost proposal. A review panel will score submissions based on weighted criteria, with GIS integration, work order operations, system flexibility, field operations, reporting, and integration each accounting for 15 percent of the score, while cost and schedule account for the remaining 10 percent. Awardees must comply with the Utah Government Data Privacy Act and provide a signed certification regarding ethical conduct and solicitation practices.
Computer Systems Design Services

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 238290
New
SLED
DFCM Construction - Standard Low Bid - Utah Valley University- UCCU Event Center Elevator Modernization - Project #27296790
Solicitation # CR27026
The State of Utah Division of Facilities Construction and Management is soliciting bids for the turnkey modernization of the UCCU Event Center South Elevator at Utah Valley University in Orem, Utah. With a construction cost estimate of 250,000.00 dollars, the project requires the contractor to provide all engineering, equipment, labor, and permits to install one hydraulic elevator. All work must adhere to Higginson Consulting Services specifications, OSHA regulations for hoistway guarding, the Americans with Disabilities Act, and the State of Utah High Performance Building Standard. Key deliverables include non-proprietary equipment serviceable by a Journeyman Elevator Mechanic, as-built wiring diagrams, and a one-year warranty featuring weekday daytime callback service. This is a standard low bid procurement where the award is based on the lowest responsive and responsible bidder. Bids must be submitted via the U3P website by November 4, 2026, and must include a bid bond and a completed DFCM Subcontractors List Form to be considered responsive. Bidders must also certify they are not restricted foreign entities and are not subject to debarment. The project has a substantial completion deadline of March 12, 2027, with liquidated damages set at 500.00 dollars per day for delays. The contract is governed by DFCM General Conditions, which include specific requirements for cross liability insurance, material storage in original packaging, and performance and payment bonds.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 115310
New
SLED
AS27-116 East Coyote Mastication
Solicitation # AS27-116
The State of Utah Division of Wildlife Resources and the Bureau of Land Management are seeking a single contract award to the lowest cost responsive and responsible vendor for wildfire hazard reduction services in San Juan County, Utah. This project, titled East Coyote Mastication, involves the mechanical removal and shredding of green and dead Pinyon and Juniper trees across approximately 504.4 acres. Key technical requirements include the complete severance of live trees up to 14 inches in diameter at the root collar, maintaining stump heights of no more than 6 inches, and ensuring a maximum fuel bed depth of 6 inches for shredded debris. Contractors must utilize GPS devices with an accuracy of +/-10 meters to identify boundaries and leave islands, and they must feather edges to maintain a natural appearance. Participation is strictly limited to pre-qualified contractors, and performance will be monitored based on quality, timeliness, and contract management to maintain eligibility on the Rangeland Pre-Qualification list. The project performance period is scheduled from November 1, 2026, to December 31, 2026, with no allowance for work outside these dates. Vendors must guarantee pricing through project completion. Administrative requirements include submitting invoices within 30 days of delivery for payment within a 30-day window, maintaining statutory workers compensation insurance, and adhering to strict federal and state non-discrimination and anti-boycott certifications. All work must be coordinated through a Project Manager, who is responsible for authorizing work camps and approving subcontractors in writing.
Support Activities for Forestry

POSTED

1 day ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS