Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on November 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Elk River Hatchery New Rearing Ponds

Closed
S-63500-00011754State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers and manholes, a generator, odor control equipment, stormwater facilities, and site fencing. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. The agreement is governed by EJCDC standard forms, requiring performance and payment bonds and proof of insurance. Performance begins upon a Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments due 30 days after presentation to the owner. Final acceptance is contingent upon a joint inspection by the Owner, Contractor, and Engineer, the completion of a punch list, and the Engineer's written recommendation for final payment.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of the bid for reimbursement. Quotes are due by November 17, 2026, at 2:00 PM PT, with the general bid date following on November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 pipelines for the Butterfield Dual Force Main. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with smaller units and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Key electrical deliverables include new SCE electrical services and the installation of a standby generator. Filanc is seeking quotes across a wide range of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids and proposals are due by October 29, 2025, at 2:00 PM. Primary contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 1 hour ago

DEADLINE

in about 4 hours

Documents

4

Addendum #1 - ITB S-63500-00011754 Elk River Hatchery New Rearing Ponds

PDF, High priority: read this firstamendment
High

ITB S-63500-00011754 Elk River Hatchery New Rearing Ponds

PDF, High priority: read this firstitb
High

ITB S-63500-00010567 Elk River Hatchery Pre-Bid Attendee List

PDF, Low priorityprebid-attendance
Low

ITB S-63500-00011754 Elk River Hatchery New Rearing Ponds Pre-Bid Attendee List

PDF, Low priorityprebid-attendance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Dec 12, 2024 to Nov 26, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon Department of Fish and Wildlife
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
See Attachments for Address Details

Full Description

Show more
The purpose of this ITB is to establish a contract for the Elk River Hatchery New Rearing Ponds to include the construction of two new concrete rearing ponds, and pump station with electrical and mechanical equipment. Bid Alternates of two additional concrete ponds and area paving included in ITB.

More opportunities from Oregon Department of Fish and Wildlife

Same awarding agency

NAICS: 113310
New
SLED
Large Wood Harvest Staging - Anthony Creek Uplift
Solicitation # S-63500-00018165
The Oregon Department of Fish and Wildlife is soliciting bids for the harvest and staging of woody materials to support the Anthony Creek uplift project within the Elkhorn Wildlife Area. The project aims to restore approximately 1.5 miles of the Anthony Creek floodplain by creating engineered habitat features. The selected contractor will be responsible for harvesting and staging 70 trees for racking material and 36 unanchored trees, as well as 1,850 cubic yards of conifer slash material. These materials must be sorted and staged across six designated areas within the project site. All services must be completed by June 30, 2027. The contract will be awarded to the lowest responsible bidder, with specific preferences applied for Oregon Small Business Enterprises and services performed entirely within Oregon. Bidders must submit their proposals via OregonBuys.gov by November 16, 2026, including required documentation such as the Bid Cover Sheet, Reference Check Form, and COBID Certification. Because the project is funded by the United States Fish and Wildlife Services, it is subject to federal terms and conditions, including the Davis-Bacon Act for contracts exceeding 2,000 dollars and the Contract Work Hours and Safety Standards Act for contracts over 100,000 dollars. The contractor is also required to comply with the Oregon False Claims Act and state tax laws.
Logging

POSTED

7 days ago

DEADLINE

in 19 days
View Details
NAICS: 115310
SLED
Whaleback and Huckleberry Meadow Enhancement 2026-27 Slash/Pile Project
Solicitation # S-63500-00018003
The Oregon Department of Fish and Wildlife is soliciting bids for the Whaleback and Huckleberry Meadow Enhancement 2026-27 Slash/Pile Project. The selected contractor will provide all labor, equipment, and tools to perform pre-commercial thinning, brush cutting, and treatment of slash for up to 124 acres within Whaleback Unit 2 on Rogue River-Siskiyou National Forest lands. The primary objective is to increase early seral stage vegetation and promote biodiversity, specifically targeting huckleberry patches and aspen stands. All work must be performed using hand tools, such as chainsaws and loppers, and must be completed by June 30, 2027, with all final invoices submitted by July 31, 2027. The contract will be awarded to the lowest responsible bidder who meets the minimum qualification of having been in business for at least three years. Payment is based on the number of completed acres, with no upfront funding provided. Contractors must adhere to strict environmental and seasonal restrictions, including the prohibition of 4x4 vehicles in riparian habitats and a work stoppage during the General West Cascade Any Legal Weapon Elk Season from November 4 to November 13, 2026. Compliance with Oregon Revised Statutes, Industrial Fire Precaution Levels, and federal labor standards, including the Davis-Bacon Act for applicable construction contracts, is required. Bids are due by November 2, 2026, and must include the required cover sheet, reference check form, submittal form, and COBID certification.
Support Activities for Forestry

POSTED

15 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS