Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Embarcadero Sewer Pipe Repair

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Embarcadero Sewer Pipe Repair project, managed by the San Diego Unified Port District, involves the repair and replacement of a sewer pipe located at 1492 North Harbor Drive in San Diego, California. The scope of work includes removing existing concrete in a parking lot, excavating up to 30 inches to expose the damaged trench line, and replacing it with a new 12-inch pipe. Following the installation, the contractor will backfill, compact, repave, and restripe the affected parking spaces. The project is scheduled for construction in July or August 2026 and is expected to take approximately 10 working days to complete. To manage the site, the working area will be fenced off, and traffic within the parking lot will be redirected to accommodate the temporary impact on 13 parking spaces. The project is classified under NAICS code 237110 and is determined to be categorically exempt under CEQA Guidelines Section 15301 for existing facilities, as it is expected to have no significant environmental impact. The applicant is responsible for adhering to all federal, state, and local regulations concerning stormwater, hazardous materials, and construction demolition debris.

General Info

Replace 12-inch sewer pipe at North Harbor Drive, restore 13 parking spaces, work in July/August 2026, 10 days, CEQA exempt.

Agency

California → San Diego Unified Port District

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Travis BrozowskiContractor
Luis DuranSenior Planner

Full Description

Show more
The proposed project would involve a repair/replacement of a sewer pipe by the County of San Diego (“Applicant”) in the city of San Diego, California. Work to specifically complete the proposed project would involve removal of existing concrete in an existing parking lot, excavation of up to 30 inches to expose damaged trench line pipe, and removal and replacement with a new 12” pipe. Applicant would then backfill, compact, repave and restripe parking spaces. Construction of the proposed project is anticipated to occur in July or August 2026 and would take approximately 10 working days to complete with ongoing modifications and maintenance, as needed. Applicant will fence off the working area and will temporarily affect 13 parking spaces to reach the sewer pipe. Applicant will redirect traffic within the parking lot around the construction area as needed. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, transportation and traffic are not anticipated to occur. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include site improvements, stormwater facilities, fencing, and the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide bid security, evidence of authority to sign, and M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. The successful contractor is required to furnish performance and payment bonds equal to the contract price and maintain insurance from companies with an A.M. Best rating of A-VII or better. Project administration follows EJCDC standards, with payments processed monthly via applications for payment submitted to the Engineer, and final acceptance contingent upon the Engineer's written recommendation.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project is governed by VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with strict adherence to OSHA and ADA requirements. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, submission of a bid guarantee, and the provision of performance and payment bonds equal to 100 percent of the contract amount. Additionally, the project is subject to Davis-Bacon wage determinations and requires compliance with various federal executive orders regarding non-discrimination and the use of American Iron and Steel.
WG Construction Co., Inc.

POSTED

about 1 hour ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS