Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Emergency Lindo Channel Erosion Repairs at Manzanita Avenue

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Chico Public Works Department is seeking emergency repairs for two actively eroding sites within the Lindo Channel along Manzanita Avenue near the Howard Drive intersection in Chico, California. Recent high storm flows caused significant erosion that threatens the collapse of the adjacent paved road shoulder and bike and travel lanes of Manzanita Avenue, a critical collector road. The project is classified as an emergency set-aside to maintain public safety and has received environmental clearance via a Notice of Exemption. The scope of work involves Repair Area 1, which is approximately 121 feet long, 30 feet wide, and 13 feet deep, and Repair Area 2, which is approximately 135 feet long, 20 feet wide, and 4 to 10 feet deep. Restoration efforts include installing rock slope protection using graduated cubic yard sized boulders over erosion control fabric, with Repair Area 1 requiring additional backfilling and compaction. Heavy equipment will operate from the top of the bank, while hand work may be used within the channel to key in boulders. To mitigate surface water turbidity, the contractor may need to divert flows or slow the placement of rock. All in-channel work requires the presence of a biological monitor, and traffic closures of one to two lanes will be implemented as necessary. The primary point of contact for this effort is Senior Planner Tracy R. Bettencourt.

General Info

Emergency repairs for Lindo Channel erosion to protect Manzanita Avenue road and lanes.

Agency

California → City of Chico

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Manzanita Avenue, Howard Drive, Chico, CA, 95926

Set-Aside

NONE

Documents

(1)

NOE Lindo Channel Emergency Erosion Repair 1-9-26

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Chico
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Chico
Office AddressN/A
Contacts
Tracy R. BettencourtSenior Planner

Full Description

Show more
The City of Chico proposes to complete emergency repairs on two actively eroding sites within Lindo Channel along Manzanita Avenue near the Howard Drive intersection. High flows from recent storm events resulted in sudden and significant erosion of the channel that is risking the collapse of the adjacent paved road shoulder and bike/travel lanes of Manzanita Avenue, a critical collector in the City’s roadway system. Repair Area 1 is approximately 13 feet deep, 121 feet long, and 30 feet wide, encompassing approximately 0.10 acres. Repair Area 2 is approximately 135 feet long, 20 feet wide, and ranges from 4-10 feet deep, encompassing approximately 0.05 acres. The restoration work includes placement of rock slope protection (RSP) in the form of graduated cubic yard sized boulders placed over erosion control fabric. Repair Area 1 will require backfilling and compaction to restore the roadway shoulder. Work with heavy equipment will be completed from the top of bank. Hand work may occur within the channel to guide and key in base boulders. The majority of work is anticipated to occur outside standing or flowing water. However, if some flow through the work area remains, it may be necessary to divert flows and/or conduct placement of the RSP at a rate slow enough to minimize the potential of surface water turbidity increases. A biological monitor will be present for all in-channel work. Traffic closures of one to two lanes will be implemented as needed.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS