Emergency Lindo Channel Erosion Repairs at Manzanita Avenue

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Chico is undertaking emergency repairs at two severely eroding sites along Lindo Channel near the intersection of Manzanita Avenue and Howard Drive to prevent the imminent collapse of the adjacent roadway shoulder and bike/travel lanes, which are critical components of the city’s transportation infrastructure. Repair Area 1 measures approximately 13 feet deep, 121 feet long, and 30 feet wide, while Repair Area 2 is 135 feet long, 20 feet wide, and ranges from 4 to 10 feet in depth. Work will involve placing graduated cubic yard-sized boulders over erosion control fabric to form rock slope protection, backfilling and compacting the roadway shoulder in Repair Area 1, and manually positioning base boulders within the channel where necessary. Heavy equipment will operate from the top of the bank, with limited handwork conducted in the channel. If flow persists, water diversion or slow placement techniques will be used to minimize sediment disturbance, and a biological monitor will be present during all in-channel activities to ensure environmental compliance. Temporary lane closures on Manzanita Avenue will be implemented as needed to maintain public safety during construction. The project is being executed under emergency exemptions from CEQA Sections 21080(b)(3) and (b)(4), allowing for immediate action without a full environmental review, and has been supported by a No Effect Determination from the California Department of Fish and Wildlife. The City of Chico is the lead agency and responsible party, with no formal contractor identified, suggesting direct city execution. Key contacts include Tracy R. Bettencourt, Senior Planner, and Brendan Ottoboni, Director of Public Works – Engineering. The work site is located in Chico, California, with a zip code of 95926. The project was posted on January 12, 2026, with a filing deadline of January 9, 2026, indicating an urgent, expedited procurement process. While no contract value is specified, a $50 filing fee was paid to the Butte County Clerk’s Office, and all required environmental documentation, including the Notice of Exemption and Project Location Map, were submitted in physical form. No federal contract clauses, invoicing systems, award evaluation factors, or socioeconomic certifications are applicable, and no federal procurement standards such as Davis-Bacon or small business set-asides are triggered due to the local agency nature of the emergency response.

General Info

City of Chico performs emergency rock slope repairs on Lindo Channel to prevent roadway collapse, using boulders and fabric with environmental monitoring.

Agency

California → City of Chico

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Manzanita Avenue, Howard Drive, Chico, CA, 95926

Set-Aside

NONE

Documents

(1)

NOE Lindo Channel Emergency Erosion Repair 1-9-26

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Chico
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Chico
Office AddressN/A
Contacts
Tracy R. BettencourtSenior Planner

Full Description

Show more
The City of Chico proposes to complete emergency repairs on two actively eroding sites within Lindo Channel along Manzanita Avenue near the Howard Drive intersection. High flows from recent storm events resulted in sudden and significant erosion of the channel that is risking the collapse of the adjacent paved road shoulder and bike/travel lanes of Manzanita Avenue, a critical collector in the City’s roadway system. Repair Area 1 is approximately 13 feet deep, 121 feet long, and 30 feet wide, encompassing approximately 0.10 acres. Repair Area 2 is approximately 135 feet long, 20 feet wide, and ranges from 4-10 feet deep, encompassing approximately 0.05 acres. The restoration work includes placement of rock slope protection (RSP) in the form of graduated cubic yard sized boulders placed over erosion control fabric. Repair Area 1 will require backfilling and compaction to restore the roadway shoulder. Work with heavy equipment will be completed from the top of bank. Hand work may occur within the channel to guide and key in base boulders. The majority of work is anticipated to occur outside standing or flowing water. However, if some flow through the work area remains, it may be necessary to divert flows and/or conduct placement of the RSP at a rate slow enough to minimize the potential of surface water turbidity increases. A biological monitor will be present for all in-channel work. Traffic closures of one to two lanes will be implemented as needed.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details