Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Emergency Repairs of Eroded Embankment and Damaged Culverts and Headwalls at Bayshore Bikeway Pond 10A

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The proposed project would include the repair and reconstruction of an eroded embankment and damaged culverts and headwall by the San Diego Unified Port District (District) along the Bayshore Bikeway adjacent to Pond 10A in the South San Diego Bay. The proposed project would be implemented as a hazard-abating effort to quickly address the failing infrastructure and increasing concerns towards public safety along the bike path due to the deteriorated state of the embankment adjacent to the damaged culverts where the bike path crosses a tidal channel. The proposed project is also a preventative effort for any further deterioration resulting from the additional anticipated extreme high tides (including King Tides) and storm surges anticipated to occur in the coming months. In October 2026, separation of two (2) of the five (5) culvert joints was observed and reported. Consequently, the District is mobilizing to implement emergency repairs to quickly address the failing infrastructure. Work to complete the proposed project would primarily consist of five (5) components, and would specifically include the following: 1. Culvert slip line. Insertion of HDPE (high-density polyethylene geomembrane) liner (or similar) into the existing 42-inch RCP (reinforced concrete pipe) at the observed joint separation points. The annular space would be sealed and grouted, and the liner would be sized to keep the existing hydraulic opening and muted tidal exchange as close to that which is existing to the greatest extent feasible. 2. Headwall tiebacks. Installation of approximately six (6) corrosion-resistant tiebacks between the culvert openings using stainless steel (or similar corrosion-resistant material) housed in PVC (polyvinyl chloride) sleeves (or similar), anchored to each headwall with a corrosion-resistant anchoring system. Other methods to install the tiebacks which would require no excavation are also being explored. 3. Headwall bracing. Installation of corrosion-resistant bracing or angle irons to secure the southern headwall separated by cracks along its face. 4. Void filling and embankment repair. Filling of voids and fissures behind and around the southern headwall with grout, slurry or engineered fill, and rebuilding and compacting of the embankment. 5. Rock slope protection. Placement of new ¼- to ½-ton rock slope protection (RSP) in the scour area and at the southern end of the headwall on a bedding layer or geotextile. This would prevent further scour and ensure stabilization of the headwall. Any bike path pavement, shoulders, striping, fencing, and signs disturbed during the proposed work would be stabilized following its completion. Prior to construction of the components described above, excavation of the area directly above the culverts would be conducted for investigative purposes to assess the full extent of the two (2) visibly damaged culverts, as well as assess the condition of the remaining three (3) culverts. The project site would be accessed from CA-75 and the staging area would be within the surrounding area adjacent to the west of the bike path to ensure minimal impact to public access. Access to the project site via the bike path and proposed work in tidal areas would be scheduled for during low tides. Construction of the proposed project may require intermittent partial closures of the bike path as necessary for specific work activities. Intermittent closures would last no more than a few hours at a time, and signs, traffic control, and flagger(s) would be present to warn and direct the public throughout the project site and maintain public access and use of the bike path during construction. Construction of the proposed project is anticipated to occur in Fall 2026 and would take approximately 15 days to complete, subject to tidal conditions. Additionally, in August 2026, the District was notified of erosion along the southern edge of the bike path adjacent to Pond 10A due to overtopping and flooding during high tides. Continuous overtopping and the subsequent erosion has created approximately 8- to 12-inch drop-offs from the bike path to the surrounding ground and are beginning to undercut the bike path; these drop-offs were observed along an approximately 300-foot stretch of the southern edge of the bike path and pose a significant safety issue to users of the bike path. To prevent any further erosion and address the increasing concerns towards public safety, the District is proposing an approximately 4-foot-wide tapered shoulder made of asphalt along the stretch of bike path facing extensive erosion as a temporary solution for the upcoming El Niño season. The tapered shoulder would connect the existing height of the bike path to the surrounding ground, and would not extend past the existing fence that borders the bike path and wildlife refuge. This work is anticipated to occur concurrently with the culvert repairs, or shortly after in coming months. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the District would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

More opportunities from California → San Diego Unified Port District

Same awarding agency

NAICS: 237310
SLED
As-Needed Sweetwater Bike Path Hardscape And Maintenance Services
Solicitation # 26-23MA
The San Diego Unified Port District is soliciting responses for RFQ 26-23MA to provide as-needed inspection and routine maintenance for the Sweetwater Bike Path and associated hardscape surfaces. The scope of work covers facilities across San Diego, Coronado, National City, Chula Vista, and Imperial Beach, focusing on asphalt crack sealing, minor surface patching, localized pavement preservation, and the maintenance of concrete and decomposed granite surfaces. This agreement is for a five-year term with a tentative start date of July 1, 2027, and a total contract value not to exceed 1,000,000 dollars. Services are performed only upon the issuance of a written Task Authorization, and the provider must adhere to Caltrans traffic control guidelines and prevailing wage laws. The selection process is based on an evaluation matrix, reference checks, and negotiated pricing, with bonus points available for SBE status, veteran status, the employment of staff with disabilities, and the inclusion of ADA scope enhancements. The successful provider must maintain specific insurance levels, implement a comprehensive self-inspection program with yearly reporting, and ensure all employees and vehicles are clearly branded with the company logo. Emergency response requirements are stringent, requiring a response within one hour for immediate safety concerns and onsite performance within four hours, available 24/7. Submittals are due by December 9, 2026, via the eBid system.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 22 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS