Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Removal of Waterside Infrastructure at Driscoll’s Wharf

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The proposed project would include the removal of certain waterside commercial fishing infrastructure by Driscoll Marina, Ltd. (Tenant) at Driscoll’s Wharf in the city of San Diego, California. The proposed project would be implemented as a hazard-abating effort due to the deteriorated state of the electrical systems and horizontal structures (i.e., loose decking on the piers) at Piers 5, 6, 7, and 8 (see Attachment 1) at Driscoll’s Wharf as a result of elevated tide and storm surge conditions, as well as a preventative effort for any further deterioration resulting from the additional anticipated super tides and storm surges anticipated to occur in the coming months. Since 2024, commercial fishing operations have been consolidated onto Pier 5, while Piers 6 and 8 have been removed from active service; Pier 7 has maintained limited service for site security purposes. There are currently 11 commercial fishing vessels and two (2) City of San Diego vessels berthed at Driscoll’s Wharf, which would need to be relocated in order to commence the proposed project. These vessels may be relocated to alternative location(s) where feasible in San Diego Bay. While Piers 5, 6, 7, and 8 would be decommissioned as a result of the proposed project, the fish offloading pier (Pier 4) at Driscoll’s Wharf would remain in place and continue to operate throughout and following completion of the proposed project, as it provides critical infrastructure to commercial fishing operations and the on-site seafood processing businesses. Maintaining access to the fish offloading pier would ensure that, if commercial fishing vessels are temporarily relocated to an alternative location, fishermen may still access Driscoll’s Wharf to store, load, and unload fishing gear and equipment that cannot be readily accommodated at an alternative location, such as Tuna Harbor. In October 2026, Pier 5 experienced significant failures of its electrical system due to extreme high tides. The extreme high tides resulted in saltwater intrusion into below-deck electrical infrastructure, arcing, and repeated breaker failures; the electrical system has since been de-energized and remains locked due to life-safety concerns. Other concerns due to the deteriorated conditions of timber decking and supporting structural components include potential fire, electrical, structural, public safety, and marine debris hazards, which are anticipated to worsen as a result of the upcoming El Niño season if left unattended. Work to specifically complete the proposed project would include the following at Piers 5, 6, 7, and 8: • Removal of electrical pedestals, wiring, conduit, and related equipment associated with the four berthing piers; • Removal of gangways, ladders, timber deck planking, beams, and other horizontal superstructures that create and immediate access, structural, or marine-debris hazard; and • Maintaining of site controls during the proposed project to prevent unauthorized access and to protect adjacent waters. The proposed project will not remove vertical support piles or include any other sediment-disturbing work; the limited scope of the proposed project would address the immediate hazard presented by the failed electrical system and deteriorated decking and superstructure of Piers 5, 6, 7, and 8, and does not include and/or permit the Tenant’s remaining end-of-term obligations. Additionally, the Tenant has initiated conversations with the U.S. Coast Guard on how to ensure the temporarily leftover piles do not create a navigational hazard in America’s Cup Harbor. A potential solution to avoid creating a navigational hazard may be the proposed project adding navigational beacons to the end of each piling to help notify boaters of the navigational hazards. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the Tenant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

More opportunities from California → San Diego Unified Port District

Same awarding agency

NAICS: 237310
SLED
As-Needed Sweetwater Bike Path Hardscape And Maintenance Services
Solicitation # 26-23MA
The San Diego Unified Port District is soliciting responses for RFQ 26-23MA to provide as-needed inspection and routine maintenance for the Sweetwater Bike Path and associated hardscape surfaces. The scope of work covers facilities across San Diego, Coronado, National City, Chula Vista, and Imperial Beach, focusing on asphalt crack sealing, minor surface patching, localized pavement preservation, and the maintenance of concrete and decomposed granite surfaces. This agreement is for a five-year term with a tentative start date of July 1, 2027, and a total contract value not to exceed 1,000,000 dollars. Services are performed only upon the issuance of a written Task Authorization, and the provider must adhere to Caltrans traffic control guidelines and prevailing wage laws. The selection process is based on an evaluation matrix, reference checks, and negotiated pricing, with bonus points available for SBE status, veteran status, the employment of staff with disabilities, and the inclusion of ADA scope enhancements. The successful provider must maintain specific insurance levels, implement a comprehensive self-inspection program with yearly reporting, and ensure all employees and vehicles are clearly branded with the company logo. Emergency response requirements are stringent, requiring a response within one hour for immediate safety concerns and onsite performance within four hours, available 24/7. Submittals are due by December 9, 2026, via the eBid system.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 22 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS