Emerson Street Paving Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Emerson Street Paving Rehabilitation Project is a forecast initiative by the City of Clearlake, California, focused on the repair and maintenance of the existing roadway between the intersections of Olympic Drive and Turner Avenue. The primary objective is to restore the structural integrity, safety, and serviceability of the public roadway without expanding its footprint, increasing capacity, or changing its intended use. The project is classified under NAICS code 237310 and is managed by the City of Clearlake, with Mark Roberts, Senior Planner, and Adeline Leyba, Public Works Director, serving as the primary points of contact. The scope of work utilizes Full Depth Reclamation, an in-place pavement recycling method that eliminates the need to import or export materials from the site. This process involves using a pavement reclaimer to reclaim existing asphalt and base materials to a depth of up to 8 inches, which are then mixed to create a stabilized base, compacted, and resurfaced. A Notice of Exemption was issued on July 20, 2026, claiming an exemption under Class 1 - Section 15301(c) for the maintenance of existing facilities.

General Info

Clearlake to rehabilitate Emerson Street using full-depth reclamation with no capacity or width changes.

Agency

California → City of Clearlake

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Olympic Drive, Turner Avenue, Clearlake, CA, 95422

Set-Aside

NONE

Documents

(1)

Emerson Street Paving Rehabilitation Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Clearlake
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Clearlake
Office AddressN/A
Contacts
Mark RobertsSenior Planner
Adeline LeybaPublic Works Director

Full Description

Show more
The proposed project consists of rehabilitating and repaving the existing roadway along Emerson Street between the intersections of Olympic Drive and Turner Avenue. All work will occur within the existing improved roadway. Roadway rehabilitation will be completed using Full Depth Reclamation (FDR), an in-place pavement recycling method. The existing asphalt pavement and underlying base material will be reclaimed to a depth of up to 8 inches using a pavement reclaimer. The reclaimed material will be mixed to create a stabilized base, compacted, and resurfaced. Because FDR reuses the existing pavement and base materials in place, no roadway materials will be imported to or exported from the project site. The project is limited to the repair, rehabilitation, and maintenance of an existing public roadway. The proposed improvements will restore the roadway's structural integrity, safety, and serviceability without increasing roadway capacity, expanding the existing footprint, or changing its intended use.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS