Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The EN27TFM021 South Peter FSR Extension - Arrow is a Major Works Contract for forest road construction issued by the BC Timber Sales Branch of the Province of British Columbia. The scope of work involves mobilization and demobilization, site preparation including clearing and debris disposal, and roadway and drainage excavation such as embankments, ballasting, and excavation in solid rock. The project is located in British Columbia, Canada, and requires the contractor to commence work immediately upon execution of the agreement, with completion dates defined in the contract schedules.
Award is based on identifying the lowest compliant bidder, with evaluation factors focusing on the bidder's technical experience, qualifications, and possession of necessary machinery and equipment. Key requirements include mandatory BC Forest Safety Council SAFE certification for all subcontractors and adherence to strict camp standards regarding health, sanitation, and water safety. The contract is administered by the Minister of Forests through the Kootenay Business Area, with payments typically processed between 30 to 60 days after invoice certification. Bidders must provide bid security, and the successful contractor is required to provide performance and labour and material payment bonds, as well as WorkSafe BC coverage.
General Info
BC Timber Sales contract for forest road construction and drainage in British Columbia.
PDF, High priority: read this first18 pages · contract-document
HighAI Summary for BCTS Major Works Road Construction Contract - EN27TFM021: A specimen Major Works Contract for forest road construction issued by the Ministry of Forests (BC Timber Sales) for the Kootenay Business Area. Revised July 2024, the document outlines terms for contract price, security, performance, and legal obligations.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for EN27TFM021 Schedule C - Project Specifications: Technical specifications for the South Peter FSR Extension Arrow project under the Ministry of Forests. The scope includes 2.8km of new forest road construction, re-decking of bridges N5-276 and N5-278, and specific requirements for excavation, culvert installation, and road surfacing. Completion date is set for December 20, 2027, with specific environmental restrictions regarding migratory birds.
PDF
PDF, High priority: read this first13 pages · specifications
HighAI Summary for EN27TFM021 Schedule D - General Specifications: General specifications for a Major Works Contract regarding forest road construction for the South Peter FSR Extension Arrow. The document includes a glossary of terms and detailed technical requirements for mobilization, site preparation, roadway and drainage excavation, culverts, structures, road surfacing, and grass seeding.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for EN27TFM021 Schedule F - Works Completion: This document is Schedule F (Works Completion) for a Major Works Contract regarding Forest Road Construction for the South Peter FSR Extension Arrow. It establishes a project completion date and a final milestone date of December 20, 2027, for the total completion of all contract works.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for EN27TFM021 Schedule L - Camp Standards: Schedule L of contract 10005-40/EN27TFM021, establishing minimum health, safety, and accommodation standards for camps used by contractors for the South Peter FSR Extension – Arrow. It details compliance with the Public Health Act, water supply requirements, inspection rights, and penalties for non-compliance.
PDF
PDF, High priority: read this first5 pages · rfp
HighAI Summary for EN27TFM021 - South Peter FSR Extension Arrow Information to Bidders: Information to Bidders for project EN27TFM021 involving 2.8km of new Forest Service Road (FSR) construction, bridge decking replacement, and timber removal (1680m3) for BC Timber Sales. Includes technical requirements for road design, stumpage rates, migratory bird restrictions, and safety obligations for the Prime Contractor. Completion date is December 20, 2027.
PDF
PDF, High priority: read this first13 pages · itb
HighAI Summary for EN27TFM021 South Peter FSR Extension - Conditions of Tender: Conditions of Tender for Works Contracts regarding the South Peter FSR Extension – Arrow BC Timber Sales Kootenay. This document establishes the legal definitions, submission requirements, and rules for bidders responding to the Invitation to Tender (ITT) via BC Bid.
PDF
PDF, High priority: read this first1 page · rfp
HighAI Summary for EN27TFM021 South Peter FSR Extension Table of Contents: Table of Contents for the South Peter FSR Extension procurement by BC Timber Sales (Kootenay Business Area). The document lists the comprehensive tender package components, including conditions of tender, specimen contract, project and general specifications, safety conditions, and various technical appendices such as road design and bridge drawings.
PDF
PDF, High priority: read this first4 pages · contract-document
HighAI Summary for Prime Contractor Agreement - South Peter FSR Extension Arrow (EN27TFM021): A Prime Contractor Agreement between the Province of British Columbia (Ministry of Forests) and a designated Prime Contractor for the South Peter FSR Extension Arrow project. The document establishes the Prime Contractor's responsibilities regarding a Multiple Employer Workplace, specifically focusing on safety coordination, compliance with the Workers Compensation Act, and Occupational Health & Safety Regulations. The agreement term extends to December 20, 2027.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Schedule H - SAFE Certification: This document is Schedule H (SAFE Certification) for the South Peter FSR Extension – Arrow project. It outlines the safety certification requirements for contractors and subcontractors, specifically requiring certification in the BC Forest Safety Council SAFE Company Program or a recognized equivalent. It includes provisions for exemption requests and the impact of certification status on contract extensions and renewals.
PDF
PDF, Low priority2 pages · contract-document
LowAI Summary for EN27TFM021 Schedule K - Subcontracting Schedule: Dated November 27, 2014, this document is Schedule K (Subcontracting Schedule) for the South Peter FSR Extension – Arrow project. It outlines the general provisions regarding the use of subcontractors, including contractor liability, provincial oversight, WorkSafe BC compliance, insurance requirements, and mandatory inspection procedures to ensure work quality.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for Schedule M – Tax Verification (EN27TFM021): A supporting schedule (Schedule M) for the South Peter FSR Extension – Arrow project, dated December 2022. It outlines the requirement for the Contractor to provide a valid Tax Verification Letter from the BC Ministry of Finance regarding corporate income tax and PST obligations as a condition for entering into or renewing the agreement.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.