Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EN27TIJ401 - South Swanson Road Upgrade and Reactivation

Closed
BCEN27TIJ401Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract EN27TIJ401 for the South Swanson Road Upgrade and Reactivation involves two primary work components: reactivation of 7.1 kilometers of road and a 400-meter detailed road realignment. The reactivation portion includes installing 43 culverts supplied by BCTS according to the reactivation plan, removing and replacing six existing wood boxes with new culverts, and performing ditch and culvert inlet cleaning, with all work compensated as a lump sum. The road realignment section requires precise earthmoving under the direct supervision of a ministry-provided professional geotechnologist, who will enforce a “BUCKET TO BUCKET” method due to the narrow confines of the site and the placement of borrow and spoil areas on either side of the work zone, with payment based on an hourly rate. All specific tasks and technical requirements are detailed in the reactivation plan, road realignment designs, and the TFSA, with Schedule A outlining the full scope of services. All contract-related inquiries must be submitted in writing to the designated email address by 11:00 am on May 20, 2026, and any responses will be published on BC Bid by May 21, 2026. Tender submissions must comply with the tender package terms, and while cash, money order, certified cheque, or bank draft bid deposits are permitted, they disqualify e-bidding. The lowest bid is not guaranteed selection, unverified results will be posted after tender opening, and final award information will be available on BC Bid, with additional guidance accessible through the official BC Timber Sales contracting webpage.

General Info

Reactivate 7.1 km road with 43 culverts; realign 400 m with geotechnologist supervision using bucket-to-bucket method.

Agency

Government of Canada → Skeena

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Skeena
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Skeena
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
This contract requires the following: 7.1km of reactivation- Installation of the 43 BCTS Supplied culverts as per reactivation plan, 6 wood boxes to be removed and replaced with supplied culverts as per plan, and ditch/ culvert inlet cleaning. See reactivation plan for more details. Road reactivation will be paid out as a lump sum.400m of detailed road realignment- see road realignment designs and TFSA for details.Within the road realignment a ministry supplied Professional Geotechnologist will supervise the works and will be directing the operator to work a “BUCKET TO BUCKET” method until directed otherwise. The site is narrow and the borrow and spoil site are located on either side of the realignment section. Road realignment work will be paid out at an hourly rate.See the Schedule A Services for specific works required.Questions & AnswersAll contract related questions must be submitted in writing ONLY to the following email address: Forests.SkeenaTimberSalesOffice@gov.bc.ca. Deadline for receiving questions is 11:00 am on May 20, 2026. If questions are received, a Question & Answer document will be posted to BC Bid by May 21, 2026. Tender submissions must be submitted in accordance with the terms and conditions specified in the tender package. If your bid deposit is in the form of cash, money order, certified cheque or bank draft, you will not be able to e-bid. See allowable submission delivery method(s) above. Also see Conditions of Tender for acceptable bid securities.The lowest priced or any tender will not necessarily be accepted.Unverified bid results will be posted to BC Bid after tender opening and once awarded the contract award results will be available on BC Bid. Please see the following website forimportant BCTS Contracting advisory notices and guidance information:https://www2.gov.bc.ca/gov/content/industry/forestry/bc-timber-sales/contracting Timber Sales Manager Skeena Business Area BC Timber Sales