Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Encampment Deterrent at Camino Del Rio South at Eastbound Collector to Fairmount Avenue

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 11 in San Diego is implementing a project to install approximately 70 feet of Type CL-6 chain link fencing along the existing bicycle jughandle at Camino del Rio South, located at the eastbound I-8 collector to Fairmount Avenue. This initiative serves as an exclusionary measure designed to discourage the re-establishment of encampments by persons experiencing homelessness. All project activities will be conducted within the existing Caltrans right-of-way. In addition to the fencing, the scope of work includes various site maintenance and deterrent measures such as the installation of 24-36-inch minus rock, cleaning of brow ditches and culverts, and the removal of tree stumps and excess vegetation. The project has been granted a Categorical Exemption under CEQA and NEPA, as it is classified as the repair and maintenance of existing structures with negligible expansion of use.

General Info

Caltrans will install chain link fencing and perform maintenance to prevent homeless encampments.

Agency

California → Caltrans, District 11 - San Diego

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 11 - San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 11 - San Diego
Office AddressN/A
Contacts
Emery McCafferyEnvironmental Scientist

Full Description

Show more
Caltrans proposes to install approximately 70-feet of chain link fence Type (CL-6) along existing bicycle jughandle at Camino del Rio South at the eastbound I-8 collector to Fairmount Avenue adjacent to I-8. This is an exclusionary measure to discourage the re-establishment of unsheltered individuals. Caltrans proposes to perform encampment deterrent measures to prevent persons experiencing homelessness (PEH)) being established. Project work includes installing 24-36-inch minus rock, brow ditch cleaning, culvert cleaning, vegetation excess growth removal, tree stump removal, and install fencing. All work is within existing Caltrans right-of-way.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is seeking proposals from licensed general contractors to provide on-call maintenance and minor construction services. This master services contract will utilize time-and-materials task orders to address facility needs on short notice, including millwright work, welding, fire sprinkler system maintenance, general construction such as framing and concrete, and the repair of conveyors, hoppers, and heavy equipment. The Authority intends to award multiple contracts based on an evaluation of price, payment terms, organizational experience, performance history, and the quality of the proposed work plan. Additional selection factors include the contractor's proximity to the service area and their capacity to provide emergency staffing and equipment. Proposals must be submitted electronically via PlanetBids by October 29, 2026, at 3:00 pm. Qualified offerors must be registered with the Department of Industrial Relations and comply with California Labor Code prevailing wage requirements. Key contract stipulations include the requirement for performance and payment bonds for any task order exceeding 25,000 dollars and strict adherence to OSHA safety standards. Invoices are submitted monthly to the Accounts Payable Department with a standard 30-day payment term, though expedited payment options are available in exchange for a percentage discount. The Authority retains ownership of all technical documentation and data produced under the agreement.
Inland Empire Utilities Agency

POSTED

42 minutes ago

DEADLINE

in 2 days
View Details
NAICS: 238990
New
International
Scaffolding Works for Bron Afon
Solicitation # BAF26039
Barcud Shared Services, on behalf of Bron Afon Community Housing, is seeking a skilled contractor for solicitation BAF26039 to provide scaffolding services across the Torfaen area, including Monmouthshire and Newport. The scope of work involves the erection, dismantling, and mandatory regulatory safety checks of scaffolding structures commissioned by responsive repairs, voids, and planned works teams. The estimated total contract value is 1,459,166.67 GBP excluding VAT. Award decisions will be based on the Most Advantageous Tender, utilizing a weighting of 40% for quality and 60% for price, following a mandatory pass/fail screening of foundation questions. The contractor must adhere to strict safety standards, including the Work at Height Regulations 2005, NASC TG20:21, and BS EN 12811, with inspections required before first use and every seven days. Personnel must hold recognized certifications such as the CISRS Scaffold Inspection Training Scheme. Key contractual obligations include maintaining public liability insurance of at least 5,000,000 GBP per occurrence, compliance with the Bribery Act 2010, and providing evidence of Construction Industry Scheme status. Performance is monitored through handover certificates countersigned by Bron Afon, and failure to meet obligations may result in liquidated damages of 150.00 GBP per property per day. Additionally, the contractor is required to submit a Community Benefits Statement and demonstrate a commitment to achieving Net Zero by 2050.
Barcud Shared Services

POSTED

about 5 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS