Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Energy Efficiency & Sustainability Reporting

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Kentucky → Finance Facilities/Support SvcView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP-785-2700000030-1.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFP-785-2700000030-1 | RFP-905 ENGR KSU Health Sciences Cntr Cx Auth, Frankfort, KY

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → Finance Facilities/Support Svc
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Finance Facilities/Support Svc
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop energy performance reports, verify compliance with energy codes (e.g., IECC), and support LEED or other sustainability certification documentation.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
Wildlife Resources, Botanical Resources, and Special-Status Amphibians and Aquatic Reptiles – East Bay Municipal Utility District (EBMUD RFP No. F&W-2026-01)
Solicitation # F&W-2026-01
The East Bay Municipal Utility District (EBMUD) is soliciting proposals for technical studies to support the Federal Energy Regulatory Commission (FERC) relicensing of the Lower Mokelumne River Hydroelectric Project. The scope of work involves implementing the Wildlife Resources (TERR-1), Botanical Resources (TERR-2), and Special Status Amphibians and Aquatic Reptiles (FA-4) Study Plans. Key technical requirements include focused wildlife and botanical surveys, bat roost assessments, eDNA sampling, habitat mapping, and the development of GIS databases. The selected consultant will be responsible for producing Technical Study Reports and a Resource Effects Assessment to support the Draft License Application. This is a three-year contract anticipated to start on October 14, 2026, with performance potentially extending through 2029. Compensation is structured on a cost-reimbursement basis, covering direct labor, indirect costs, and approved other direct costs. The project is governed by California law and requires strict adherence to insurance minimums, including 2 million dollar limits for general, professional, pollution, and watercraft liability. EBMUD emphasizes contract equity, providing five additional points to qualified Small Business Enterprises (SBE) and Disabled Veteran Business Enterprises (DVBE) during the evaluation process. Proposals must be submitted electronically in PDF format by the specified deadline, utilizing the provided response packets and cost distribution templates.
GEI Consultants, Inc.

POSTED

about 4 hours ago

DEADLINE

in 2 days
View Details

More opportunities from Kentucky → Finance Facilities/Support Svc

Same awarding agency

NAICS: 541350
New
SLED
RFP-785-2700000030-1 | RFP-905 ENGR KSU Health Sciences Cntr Cx Auth, Frankfort, KY
Solicitation # RFP-785-2700000030-1
The solicitation RFP-785-2700000030-1 seeks a Commissioning Authority to provide comprehensive commissioning services for the 59,000 square foot Health Sciences Center at Kentucky State University in Frankfort, Kentucky. The scope of work includes leading the design-phase reviews, construction-phase testing, and post-occupancy performance verification of mechanical, electrical, plumbing, and building envelope systems in accordance with the DECA Master Specification Section 09113 and the Capital Construction Project Procedures Manual. The Commissioning Authority is responsible for delivering a detailed Commissioning Plan, test procedures, acceptance matrices, operational and maintenance documentation, seasonal testing reports, and a Final Commissioning Report with deficiency logs and a 10-month post-occupancy review. The contract is value-based and non-price-driven, with an estimated award of $264,575 as a lump sum fee, determined through a best-value selection process that prioritizes technical qualifications over cost, in alignment with KRS 45A.810 et seq. Proposals must be submitted electronically via the Vendor Self Service portal by August 13, 2026, as a single PDF not exceeding 65,000 KB, with each attachment properly bookmarked. Required attachments include Firm Experience, Project Team qualifications, MBE Participation Plan, Federal Standard Form 330 Part II, Required Affidavits, Kentucky Permit and Registration Form, and the Official Signature Page. The evaluation is scored on a 100-point scale, with significant weight given to Related Experience, Mechanical Engineer, Electrical Engineer, and Commissioning Agent qualifications, alongside responsiveness and work performed in Kentucky. Contractors must be registered with the Kentucky Secretary of State in good standing, and key personnel must hold valid Kentucky licenses. Special requirements include professional liability and general liability insurance with the Commonwealth named as an additional insured, worker’s compensation coverage, and certification of compliance with state conflict-of-interest laws and ethics statutes. All offerors must submit notarized affidavits if claiming resident bidder status or qualified bidder status under Kentucky law, and failure to provide any required documentation will result in disqualification. The contract becomes effective only upon approval by the Finance and Administration Cabinet and filing with the Legislative Research Commission, and the Owner retains full ownership of all project documents.
Building Inspection Services

POSTED

7 days ago

DEADLINE

in 2 days
View Details