Energy Management Control System (EMCS) Integration

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → FA2543 460 ConsView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Aurora, CO, 80011, USA

Set-Aside

SBA

Documents

This scope was carved out of FA254326Q0027.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Buckley SFB - BDOC Chiller Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2543 460 Cons
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → FA2543 460 Cons
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and configures controls and automation for prime contractors on Air Force projects at Buckley SFB. Installs sensors, controllers, and communication cabling to integrate the chilled water system with the base EMCS per EMCS Standards 21 Jan 26. Background check for base access required. Delivers integrated and functional EMCS control for the new chiller system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the removal of old units and the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures anchored to existing concrete slabs. The installation includes two new NEMA 3R automatic transfer switches and requires comprehensive load bank testing for both units. The project is being issued as a firm-fixed-price task order under an 8(a) MACC IDIQ, with a magnitude estimate between $250,000 and $300,000 and a total period of performance of 270 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price, though proposals will be evaluated on technical understanding, methodology, program implementation, and the ability to coordinate labor and materials given the constraints of working on an island. Contractors must comply with the Buy American Act, Davis-Bacon prevailing wage rates for Puerto Rico, and strict security protocols, including the signing of DHS non-disclosure agreements and potential PIV card issuance for personnel. Key administrative requirements include submitting payment requests via the Invoice Processing Platform with certified payroll, providing a project schedule within 15 days of the notice to proceed, and adhering to standard working hours of 7:30 am to 4:00 pm, Monday through Friday.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40-foot steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the US Virgin Islands to support forensic science technicians. Each unit will be installed on a 3k PSI reinforced concrete slab and equipped with two split-system A/C units, a steel door with a Cypher lock, four security windows, R-11 insulation, vinyl flooring, LED lighting, and a 5-pound ABC fire extinguisher. The contractor is responsible for connecting the units to the nearest electrical circuit using 2-inch PVC or uPVC conduit and must adhere to NFPA 70 and International Building Code standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) MACC IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 364 calendar days from the Notice to Proceed, with a project schedule due within 15 days of that notice. Award is based on the lowest total evaluated price, considering technical approach, safety, and quality control. Key requirements include compliance with the Buy American Act, adherence to prevailing wage rates per determination VI20260001, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training for personnel. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238210
New
SLED
Replace Switchgears at FRCE, Phase 1
Solicitation # N400857545551
Solicitation N400857545551, titled Replace Switchgears at FRCE, Phase 1, is a request for proposals for electrical infrastructure upgrades at Marine Corps Air Station Cherry Point, North Carolina. The project involves the demolition and replacement of seven electrical switchgear stations across Buildings 137 and 138, including the installation of new molded-case breaker switchgear with PM5500 power metering and the replacement of a 15kV switch and transformer in Building 138 with a new 6-way SF6 switch and 480V dry type transformer. The work requires reworking existing conduits and conductors and adhering to strict operational constraints, specifically that each switchboard replacement must be completed within a 72-hour power outage scheduled over a three-day holiday weekend. The estimated cost range for the project is between 1,000,000 and 5,000,000 dollars, with a completion timeline of 720 calendar days after award. The contract will be awarded based on the lowest price. Bidders must comply with the Buy American statute and EM 385-1-1 safety standards, particularly as Building 137 is classified as a hazardous area. Depending on the proposal value, bid, performance, and payment bonds may be required, with bid bonds mandatory for proposals exceeding 150,000 dollars. Key deliverables include a baseline construction schedule with monthly updates and a three-week look-ahead schedule. The project incorporates various FAR and DFARS clauses, including requirements for accelerated payments to small business subcontractors and restrictions on materials from specific regions. Proposals are due by September 10, 2026, and must be submitted via email to the designated Navy contacts.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details

More opportunities from Department Of Defense → FA2543 460 Cons

Same awarding agency

NAICS: 238220
New
Federal
Buckley SFB - BDOC Chiller Replacement
Solicitation # FA254326Q0027
Solicitation FA254326Q0027 is a total small business set-aside for the replacement of the chilled water system and two computer room air handlers at Building 1028 (BDOC) at Buckley SFB, Colorado. The project requires the decommissioning and removal of existing equipment and the installation of a new Trane-series chiller system, adhering to Air Force Civil Engineering standardization guidance and specific technical standards including UFC 3-410-01, UFC 3-501-01, and 2026 EMCS standards. The contractor must provide temporary cooling to maintain server room temperatures during the transition and ensure the new system does not exceed the existing concrete pad load capacity of 12,000 lbs. All work must be completed within 30 calendar days after receipt of order. The government intends to award a fixed-price contract using the Lowest Price Technically Acceptable (LPTA) evaluation method. To be considered responsive, offerors must provide a price quote, a technical description of the work, warranty details, and two past performance citations from the last five years specifically involving the installation of Trane chiller equipment on government installations. A formal site visit is scheduled for September 1, 2026, and quotes are due by 10:00 AM MDT on September 9, 2026, although Amendment 1 notes a placeholder extension to September 15, 2026. Payments will be processed electronically via the Wide Area WorkFlow (WAWF) system.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 238330
Federal
FA2543 Chapel Carpet Replacement
Solicitation # FA2543ChapelCarpetReplacement
Solicitation FA254326Q0035 is a combined synopsis and solicitation for the removal and replacement of carpet and baseboards at Building 316, the Buckley Space Force Base Chapel in Aurora, Colorado. This project is a 100 percent small business set-aside under NAICS code 238330 and will be awarded on a lowest-price-technically-acceptable basis. The scope of work includes the demolition and disposal of existing broadloom carpet, carpet tiles, and cove base in the hallways, foyer, offices, cry room, and Fellowship Hall, as well as the permanent removal of folding wall dividers in the Fellowship Hall. The contractor is responsible for subfloor preparation and the installation of new owner-approved materials, while the sanctuary area and restrooms are specifically excluded from the scope. The project must be completed within 60 calendar days after award, with all work performed during chapel duty hours. The contractor is required to submit a detailed phasing plan and a critical path method schedule to ensure the facility remains operational. Key compliance requirements include adherence to OSHA safety provisions, AFMAN32-7002 Section 3 for hazardous materials, and AFI 10-701 for operations security. Bidders must provide documented evidence of their qualifications and required credentials within their bid package. Quotes are due to the contracting officer and specialist by 12:30 PM MDT on September 8, 2026, though some documents indicate a deadline of September 9, 2026.
Flooring Contractors

POSTED

7 days ago

DEADLINE

in about 7 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS