Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Engineered Traffic Control and Management

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Engineered Traffic Control and Management supports prime contractors on projects managed by the Public Utilities Department of the City of Riverside. The scope of work focuses on maintaining safe traffic and pedestrian flow through the implementation of engineered Traffic Control Plans approved by the City Engineer. Key operational requirements include managing lane reductions with two 12-foot lanes, installing portable changeable message signs, providing pedestrian detours with a minimum width of 5 feet, and utilizing steel plating to ensure continuous driveway access. The opportunity is categorized under NAICS code 238990 and was posted on October 8, 2026. Interested parties must submit their responses by the deadline of November 17, 2026. This contract ensures that all utility-related construction activities adhere to strict safety and accessibility standards within the City of Riverside.

General Info

Traffic control subcontract for City of Riverside utility projects; responses due November 17, 2026.

Documents

This scope was carved out of 8297.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BID 8297 - Canyon Crest HMPE & CIC Cable Replacement - Area 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Utilities Department of City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provides traffic management for prime contractors on City of Riverside Public Utilities projects. Implements engineered Traffic Control Plans (TCP), manages lane reductions (two 12-foot lanes), and installs portable changeable message signs and pedestrian detours (min 5-foot wide). Uses steel plating for driveway access. Delivers safe traffic and pedestrian flow per City Engineer approval.

Similar Contracts

Same NAICS industry code

More opportunities from California → Public Utilities Department of City of Riverside

Same awarding agency

NAICS: 237110
SLED
PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT
Solicitation # RPU-8299
The Park Avenue Water Transmission Main Replacement project, solicitation RPU-8299, is a public works contract issued by the City of Riverside Public Utilities Department. The scope of work involves the construction of a potable waterline system located within the right-of-way of Park Avenue, Howard Avenue, and 12th, 13th, and 14th Streets. The project requires the installation of approximately 380 linear feet of 54-inch and 80 linear feet of 36-inch mortar lined and coated steel pipe, along with 1,020 linear feet of 8-inch ductile iron pipe and associated appurtenances. Work is restricted to weekdays from 7:30 a.m. to 4:00 p.m., with a total performance period of 240 calendar days following the Notice to Proceed. To be eligible, bidders must hold a valid California A General Contract or C-34 Well Drilling Contractor license and demonstrate experience completing at least three potable water main projects of 24 inches or larger and at least 500 linear feet in diameter within the last five years. The contract will be awarded to the lowest responsive and responsible bidder. Required submission documents include a 10 percent bid bond, a non-collusion declaration, an Iran Contracting Act compliance affidavit, and a detailed construction plan. Once awarded, the contractor must provide performance and payment bonds for 100 percent of the contract price. Payments will be made via electronic transfer within 30 days of receiving a proper request, which must include up-to-date as-built drawings.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS