Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on June 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engineering Consultant Services for the Town of Cabot

Closed
61262State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Town of Cabot is seeking qualified engineering consultants to conduct a flood study focused on two tributaries of the Winooski River that caused significant flooding and erosion in July 2023. The project involves hydraulic modeling, analysis of flood mitigation alternatives, and development of concept designs for the most promising solutions. The scope includes data collection through field surveys, hydrologic and hydraulic modeling, and community engagement with the Flood Resiliency Task Force and local residents. The deliverables encompass detailed reports, alternative evaluations, and conceptual designs for infrastructure improvements, particularly targeting a clog-prone culvert and possibly a bridge in the village. The project budget is capped at $66,000, with a completion deadline of November 1, 2024. Proposals must include a technical and cost component, demonstrating relevant experience, project approach, team qualifications, and a clear schedule. The selection process emphasizes firm expertise, understanding of local conditions, innovative outreach strategies, and cost efficiency. The contract will be a not-to-exceed, reimbursable agreement, with payments made upon submission of monthly progress reports. Interested firms are required to submit their proposals electronically by June 21, 2024, with the opportunity for interviews if deemed necessary. The Town reserves the right to reject any proposals or cancel the process to serve the best interests of the community.

General Info

Agency

Vermont → Town of Cabot

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Town of Cabot
Contacts1 person available
OfficeN/A
Organization / Agency
Vermont → Town of Cabot
Office AddressN/A

Full Description

Show more
REQUEST FOR PROPOSALS CONSULTANT SERVICES CABOT FLOOD STUDY: HYDRAULIC MODELING, ALTERNATIVES ANALYSIS AND CONCEPT DESIGN TOWN OF CABOT, VERMONT Date of Issue: June 5, 2024 Proposal Deadline: June 21, 2024 BACKGROUND The Town of Cabot is seeking engineering consulting services to assist the town in identifying and selecting alternative measures that can be implemented to minimize the risk of future village flooding impacts from two tributaries to the Winooski River, one on the north end of the village (at junction of US Route 215 and South Walden Rd) and one in the center of the village (near Cabot Garage and Harry’s Hardware). See map for location. These tributaries course for several miles on steep slopes, and on July 10-11, 2023, they both overflowed their banks, causing erosion and flood damage to commercial and residential properties. Woody debris accumulation and high flows contributed to the flooding. The goal of this study is to conduct hydraulic modeling of these tributaries, develop alternative solutions to mitigate future flooding on each tributary, and develop a concept design for the preferred alternatives on each tributary. SCOPE OF WORK AND DELIVERABLES In general, the scope of this project will involve a close working relationship and good communication with The Cabot Flood Resiliency Task Force and the public. Deliverables are underlined. 1.0 Project Initiation and Data Collection 1.1 Participate in a project team meeting to review existing conditions, previous flood and erosion damage and project goals. During this meeting project roles will be discussed, and schedule and plans for project outreach will be determined. Past flood data will be provided by the Task Force to assist with model validation. Participate in a public meeting of the Task Force to inform community members of flood mitigation and resiliency efforts. 1.2 Conduct a stream channel walk of both tributaries to understand the upstream channels and watersheds. This will include an evaluation of upstream debris and identification of possible floodplain restoration and debris filter locations. These data are intended for use in evaluating the modeling and development of alternatives. Collect supplemental data to support hydrologic and hydraulic modeling. This includes measuring stream channel longitudinal profile and performing approximate field survey of up to 5 key wet channel cross sections to improve detail in the model. The survey will be completed by a licensed surveyor to collect high-precision survey data of the structures, adjacent stream channel, and nearby village infrastructure. 1.3 Prepare a GIS project map with collected field data from the stream walks and survey data around the culvert and bridge. 2.0 Hydrology Calculations and Hydraulic Modeling 2.1 Build hydrologic models of both tributaries’ watersheds to estimate flood flows at each structure. Validate flow estimates of flood events with reported flood levels and damages. 2.2 Conduct hydraulic modeling of the existing conditions for each tributary. The model will extend from approximately the downstream confluence with the Winooski River to 200-feet upstream of each structure. 2-dimensional modeling will be used to allow for a detailed analysis of flow patterns through the village. The model will use survey data, approximate GPS data, and LiDAR data. 2.3 Perform model validation/calibration of both flows and flood elevations based on past flooding in the area to ensure the model generally represents existing flood patterns. It is assumed that the project team will provide past flooding information in terms of date, approximate magnitude of flood, and extent of flooding. The level of detail of the model validation will rely on the availability of past flood information. A table of estimated model accuracy will be made. 3.0 Alternatives Analysis and Reporting 3.1 Develop a list of alternatives and evaluate each with the hydraulic model. Potential alternatives include structure replacement, moving buildings, floodplain restoration, and large wood filters. 3.2 A project team meeting will then be held to discuss the modeled alternatives and choose a preferred alternative to move forward to concept design. 3.3 Draft a report detailing data collected during the stream walk, summarizing hydrologic and hydraulic modeling, and discussing alternatives analysis. 4.0 Concept Design The top two preferred alternatives will be advanced to concept design. At this point we anticipate moving design forward for structures in the village that appear to be issues for flood mitigation. 4.1 Develop a concept design for the culvert on the southern tributary that is prone to clogging. The concept design will include a title sheet, existing and proposed conditions plans, longitudinal channel profile, and at least two stream cross-sections. 4.2 Develop a concept design for the bridge on the northern tributary if deemed appropriate. PROJECT BUDGET A sum not to exceed $66,000 has been budgeted for this project. PROPOSAL FORMAT Responses to this RFP should consist of the following: A. A technical proposal consisting of: 1. A cover letter expressing the firm’s interest in working on this project and the strengths your team brings to the project, including identification of the principal individuals that will provide the requested services. Include each person’s area of responsibility as well as one-page resumes. Also include the same for any sub-consultants. 2. A description of the general approach to be taken toward completion of the project, an explanation of any variances to the proposed scope of work as outlined in the RFP, and any insights into the project gained as a result of developing the proposal. 3. A summary of estimated labor hours by task that clearly identifies the project team members and the number of hours performed by each team member by task. 4. A proposed schedule that indicates project milestones and overall time for completion. 5. Demonstration of success on similar projects, including a brief project description and a contact name and address for reference. Please provide a minimum of two references. B. A cost proposal consisting of hours devoted to each task and estimated cost for each task. CONTRACTING A. Form of Contract The agreement between the Town of Cabot and the Consultant shall take the form of a Not to Exceed, reimbursable contract. The Consultant shall provide services necessary to ensure the successful completion of the project as set forth in the Request for Proposals and the final Scope of Work. Changes, modifications or amendments in the terms and conditions of this Agreement shall be written and signed by the duly authorized representative of the Consultant and the Town of Cabot. Should it become necessary for the Consultant to procure additional sub-consultant services beyond those reflected in the Consultant’s proposal, this selection will be subject to approval by the Cabot Conservation Committee and the Town. B. Payment The Town will reimburse the Consultant in a timely manner following the submittal of monthly invoices and a brief progress report. CONTRACT PERIOD All work and deliverables on the project must be completed by November 1, 2024. CONTRACTOR SELECTION Proposals will be evaluated on the following criteria: 1. Qualifications of the firm and the personnel to be assigned to this project and prior experience. (20 points) 2. Demonstration of overall project understanding and insights into local conditions and potential issues. Clarity of the proposal, presentation quality/creativity, and thoroughness in addressing the scope of work. (40 points) 3. Creativity and effectiveness proposed public outreach process. (25 points) 4. Project cost and distribution of effort. (15 points) Optional Interviews: Interviews with respondents to the RFP will be conducted if, in the opinion of the project selection committee, such interviews will aid in the selection of the firm most suited to complete the project. Interviews may be conducted in person, by telephone, or by using other available technologies. SUBMISSION REQUIREMENTS/RFP SCHEDULE Proposals must be submitted electronically no later than 4:30 pm on June 21 to the following: Gary Gulka: contact@example.gov Questions about the RFP should be directed to Gary Gulka, Cabot Flood Resiliency Task Force at: Telephone: +1 (555) 000-0000 E-mail: contact@example.gov The Town of Cabot reserves the right to reject any or all proposals received, to negotiate with any qualified source, or to cancel in part or in its entirety this RFP as in the best interests of the Town of Cabot. This solicitation in no way obligates the Town of Cabot to award a contract.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS