Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on March 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engineering Design For Springbrook Prairie Sanitary Sewer Rehabilitation

Closed
RFPQ-22-067-0.K.00-WU-0-2024/CSState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 928110
Federal
AFLCMC Armament Directorate Rapid Response (ADRR) Commercial Solutions Opening (CSO) for Innovative Execution
Solicitation # FA8682-24-C-S001
The Air Force Life Cycle Management Center Armament Directorate at Eglin Air Force Base, Florida, is utilizing the Armament Directorate Rapid Response Commercial Solutions Opening for Innovative Execution as an umbrella competitive solicitation to acquire innovative commercial products, technologies, and services. This vehicle, governed by 10 U.S.C. 3458 and DFARS Subpart 212.70, is designed to rapidly develop novel weapons capabilities through the use of digital engineering, agile software, and open system architectures. The CSO does not commit the government to any specific contract or funding but establishes a framework where specific requirements are posted as Spirals. These Spirals may result in awards via FAR Part 12 contracts or Other Transaction agreements under 10 U.S.C. 4022. The current closing date for the CSO has been extended to June 4, 2027. Technical areas of interest include digital engineering and modeling, software infrastructure such as DevSecOps pipelines, and hardware design and testing. Past and current Spirals have addressed programs such as the ERAM program, Lugged Affordable Cruise Missile, Counter-Air Missile Program, and the Family of Affordable Mass Missiles Beyond Adversary Reach. Proposals are evaluated based on technical merit, importance to agency programs, and funds availability, with price assessed to ensure it is fair and reasonable. Award eligibility requires registration in the System for Award Management and the Wide Area Workflow system for milestone-based invoicing. The government maintains strict security requirements, including the protection of Controlled Unclassified Information and prohibitions on specific foreign software and hardware.
Air Force Life Cycle Management Center

POSTED

about 2 months ago

DEADLINE

in over 2 years

AI Contract Overview

Show more

The contract involves a two-phase project focused on the rehabilitation of a 42-inch sanitary sewer interceptor within the Springbrook Prairie Forest Preserve. Phase 1 entails the removal and replacement of a drop structure, while Phase 2 involves the cured-in-place pipe rehabilitation of approximately 1.4 miles of the sewer line, including excavations at 19 manhole locations. The scope of work for the selected consultant includes preparing detailed construction documents for each phase and securing necessary permits from multiple agencies such as the US Army Corps of Engineers, IEPA, IDNR, and DuPage County. The permitting process is expected to take between six and nine months, with Phase 1 scheduled to commence in the fall of 2024 and Phase 2 in the fall of 2025. This project is solicited by the City of Naperville, Illinois, under solicitation number RFPQ-22-067-0.K.00-WU-0-2024/CS, with a response deadline of March 6, 2024. It falls under the NAICS code 928110, indicating a government service related to environmental or natural resource management. The contract emphasizes thorough planning, permitting, and phased implementation to ensure the successful rehabilitation of the sewer infrastructure within the designated preserve area.

General Info

Agency

Illinois → City of Naperville

Place of Performance

IL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → City of Naperville
ContactsNo contacts available
OfficeN/A
Organization / Agency
Illinois → City of Naperville
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The project is separated into two phases. Phase 1 consists of a drop structure removal and replacement and Phase 2 consists of the cured-in-place-pipe rehabilitation of approximate 1.4 miles of 42-inch sanitary sewer interceptor with excavations at 19 manhole locations. All work is located in the Springbrook Prairie Forest Preserve. The scope of the consultant’s work includes preparation of construction documents necessary to construct each phase and obtaining permits from the various permitting agencies (US Army Corps of Engineers, IEPA, IDNR, DuPage County, etc). The permitting effort is anticipated to take six to nine months, with Phase 1 starting in the fall of 2024 and Phase 2 starting in the fall of 2025.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS