Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wisconsin was posted on January 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engineering Services - 43Rd Street Ditch Final Design

Closed
W42003D01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
CITY OF ALAMO FY27 CDBG SEWERAGE
Solicitation # PE-66394-NONST-2027-000000011
The City of Alamo is soliciting statements of qualifications and proposals from engineering firms licensed in the State of Georgia to provide professional services for the improvement of the city's sewerage system. The scope of work involves providing preliminary design services for a potential FY27 Community Development Block Grant (CDBG) project, with the requirement that a draft Preliminary Engineering Report be submitted by January 15, 2027. If funding is secured, the selected firm will also be responsible for the subsequent design and construction management services. Proposals are due by November 30, 2026, and must include the firm's history, CDBG/EIP/RDF experience, key personnel qualifications, current workload, proposed scope of service, references, and associated fees or percentages. Evaluation of respondents is based on a point system assessing the firm's ability to provide necessary disciplines, experience with similar projects, quality of references, and price competitiveness. Additionally, firms must confirm they possess Errors and Omissions insurance and can meet the PER deadline. All contracts are subject to the provisions of the Georgia Department of Community Affairs and must comply with various federal and state laws regarding HUD Assisted Projects, including the Build America, Buy America Act, the Americans with Disabilities Act, and the Civil Rights Act of 1964. The primary point of contact for this solicitation is Bethany Newby.
City of Alamo

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Milwaukee Metropolitan Sewerage District is seeking professional engineering services for the final design of the 43rd Street Ditch project in Wisconsin, aimed at mitigating flood risks and addressing infrastructure failures along the ditch. Building upon preliminary engineering work documented in the January 2024 report, the project involves refining designs and preparing detailed construction plans for flood storage basins, diversion structures, open channels, and culvert improvements. The initiative targets reducing flooding for 13 structures within the floodplain and alleviating roadway flooding at key intersections, specifically W. Lincoln Avenue and S. 43rd Street, while also providing downstream flood storage to protect over 300 residential and commercial structures in the KK River floodplain. Public and stakeholder engagement is a vital component, with the District leading outreach efforts and the selected consultant expected to contribute materials and participate actively. The solicitation, titled "Engineering Services - 43Rd Street Ditch Final Design," was posted on January 24, 2024, with a response deadline of February 29, 2024. It falls under NAICS code 541330, indicating professional engineering services, and is managed by the Milwaukee Metropolitan Sewerage District in Wisconsin. The primary contact for this project is Millie Neidhardt, reachable via email at [email hidden] or by phone at [phone hidden]. Interested firms can find additional details and submit responses through the project portal linked on the district’s BonfireHub page.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Milwaukee Metropolitan Sewerage District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The purpose of the 43rd Street Ditch project is to reduce the risk of flooding for 13 structures within the floodplain along the 43rd Street Ditch, reduce roadway flooding from 43rd Street Ditch at the intersection of two major arterial roads: W. Lincoln Avenue and S. 43rd Street, and address failing assets (corrugated metal pipe culverts and concrete channel lining). In conjunction with Project W40009 – Jackson Park, this project will also provide flood storage to reduce flood risk downstream on the KK River where over 300 residential and commercial structures are located in the 1% annual probability floodplain. The District completed preliminary engineering for the recommended improvements at 43rd Street Ditch, and this work is detailed in the 43rd Street Ditch Preliminary Engineering Report (PER) – (HNTB, January 2024). The District is requesting professional services of a Consultant to perform final design for the 43rd Street Ditch Design project (W42003). The work includes refining the designs and producing construction plans and specifications for the flood storage basin, inline weir/diversion structure, open channels and culvert improvements as identified in the RFP. The project will include stakeholder and public feedback throughout the project. The District will lead the stakeholder and public outreach for this project, and the Consultant shall participate and provide materials to assist with the outreach.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS