Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Engineering Services – Design and Integration Support

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract engages a subcontractor to provide engineering support for the integration of a new pump into existing fuel infrastructure, focusing on ensuring seamless compatibility with current systems. This includes conducting detailed system compatibility analyses, developing and updating P&IDs, and preparing all required compliance documentation to meet operational and regulatory standards. The work is critical to maintaining the integrity, safety, and efficiency of fuel distribution networks under the oversight of the Defense Logistics Agency. The services are classified under NAICS code 541614 and are issued as a subcontract within the Department of Defense framework. The contract was posted on July 17, 2026, and is administered through the DLA’s procurement system with the referenced contract number SPE60322FA2V4. Although specific location details are not provided, the performance is expected to support defense fuel systems, requiring adherence to military-grade engineering protocols and documentation standards. The technical scope demands precision and deep familiarity with industrial fuel systems and regulatory compliance frameworks.

General Info

Subcontractor to provide engineering support for pump integration into defense fuel systems with compliance documentation.

Agency

Department Of Defense → Defense Logistics AgencyView Agency

NAICS

541614 - Process, Physical Distribution, and Logistics Consulting ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of SPE60322FA2V4.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

OPTIMIZATION OF FUEL FACILITIES - COCO

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Defense Logistics Agency
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → Defense Logistics Agency
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Engineering support for integrating the new pump into existing fuel infrastructure, including system compatibility analysis, P&IDs, and compliance documentation.

Similar Contracts

Same NAICS industry code

NAICS: 541614
New
SLED
Fleet Management Consulting Services
Solicitation # RFP-14DPW-1831
The City of Indianapolis and Marion County, through the Department of Public Works, is soliciting proposals for specialized Fleet Management Consulting Services under RFP-14DPW-1831. The objective is to optimize a fleet of approximately 5,200 vehicles to reduce costs and improve service delivery. The anticipated contract duration is one year, with the possibility of mutual renewal for a term not exceeding the original length. The project is structured into three phases: Phase I focuses on data triage and fleet inventory validation; Phase II involves developing a strategic plan, including a ten-year replacement forecast and a cost-of-service model; and Phase III covers the creation of governance policies and standard operating procedures. Proposals are due by 12:00 pm on October 2, 2026, and must be submitted via the procurement portal. Vendors are required to provide a cost proposal featuring a total fixed price for each deliverable along with hourly rates for labor categories. Evaluation will be based on the most advantageous proposal to the City, with a specific 10 percent weight assigned to MBE, WBE, VBE, or DOBE participation plans. Mandatory submission documents include a transmittal letter, a nepotism compliance form, and proof of financial solvency. The selected contractor must adhere to strict confidentiality requirements, non-discrimination standards, and E-Verify provisions, while maintaining all necessary state and federal licenses.
Department of Public Works

POSTED

1 day ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Defense → Defense Logistics Agency

Same awarding agency

NAICS: 335910
New
DIBBS
BATTERY, STORAGE
Solicitation # SPE7L7-26-Q-2418
Solicitation SPE7L7-26-Q-2418 is a firm-fixed-price request for quotations issued by the Defense Logistics Agency Land and Maritime for the procurement of sealed lead acid storage batteries, identified by NSN 6140-01-624-9682. The requirement consists of two line items totaling eight units, with two units for item 0001 and six units for item 0002. Approved sources include EnerSys Delaware Inc. (part numbers ODS-AGM6M or PC2250) and Stored Energy Products, Inc. (part number PC2250). These items are designated as critical application items and are restricted source items requiring engineering source approval by the government design control activity. The batteries are classified as Type I (Code H) with a non-extendable shelf life of 12 months. Delivery is required within 60 days after receipt of the order, with shipping terms set as FOB Destination. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and DLA packaging requirements RP001, while hazardous materials must be handled according to IP025 and FAR 52.223-3. Quality assurance will be managed through destination inspection and acceptance using sampling methods such as MIL-STD-1916 or ASQ H1331. Award will be based on cost alone for quotes that conform to the solicitation requirements. Quotations must be submitted by September 21, 2026, and payment will be processed electronically via the Wide Area WorkFlow system.
Battery Manufacturing

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS