Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity was posted on August 21, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engineering Study for Replacement of Liquid & Gas Flow Meters in the Guidance & Control Liquid Cooler Test Bench

Closed
FA8204-08-R-50338Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 13 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 15 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 15 hours ago

DEADLINE

in about 1 month

General Info

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Kyle G. ChaseContract Negotiator
Jack A. AlbretsenContracting Officer

Full Description

Show more
The Guidance and Control (G&C) liquid cooler test bench is an intermediate and depot level test bench used to test repaired components of the complete G&C liquid cooler and to test and calibrate the G&C liquid cooler test sets used in the field and includes SRU level repair. The test benches at the Wings are used to test the G&C liquid cooler components that are ready to be installed in the launch facility and to calibrate the G&C liquid cooler test sets. The G&C liquid cooler test benches, managed by the ICBM program office, are equipped with two sensors that are no longer in production. The project will address the ICBM G&C liquid cooler test bench Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues to eliminate obsolescenc issue for the two sensors within the test stand. The required flow meters are not procurable or reparable and because of the low number of or lack of spare assets, the government can no longer support the test bench. It is estimated that the present supplies of these sensors will allow the lifetime of the test bench to end in or before 2010. In order to increase the lifetime of the test bench to 2030, suitable replacements for the liquid and gas flow meters must be selected and installed. The government currently requires replacements of the liquid flow meter, the gas flow meter and their display to be identified and demonstrated and tested as form, fit, and function replacements. The contractor shall identify, document, integrate and deliver a prototype with replacement flow meters, displays, and other necessary equipment that will meet the system specifications and also meet the form, fit, and function requirements. The contractor shall install and test the prototype flow meters, displays, and other necessary equipment at F.E. Warren AFB located in Cheyenne, WY.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS