Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engineering Technician - Fenton, MO

Closed
DREXEL-618State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Northeast Public Sewer District is soliciting bids for an asphalt paving project in Fenton, Missouri, with a submission deadline of June 8, 2026, at 2:00 p.m. The contractor is responsible for providing all necessary labor, materials, and equipment to complete the work, which is located entirely within the public right of way. The scope includes the removal and disposal of existing granular material and the installation of approximately 40 tons of asphalt for base course work across multiple specific sites and trench lines, including Woodland Trails, Clark Drive, West Drive, and other designated intersections. Additionally, the project requires a 2-inch asphalt overlay using 88 tons of Type BP-1 asphalt on Woodland Trails Drive, extending from the existing manhole at No. 1049 to the new sewer completion at No. 1055. General specifications call for a 4-inch asphaltic concrete base course and a 2-inch wearing surface course unless otherwise noted. All work must be performed in a professional manner and includes full site clean-up upon completion.

General Info

Asphalt paving project in Fenton, Missouri, with bids due by June 8, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Northeast Public Sewer District
Contacts1 person available
OfficeN/A
Office AddressN/A

Interested Companies (8)

Northeast Public Sewer DistrictFenton, MO
Byrne and Jones ConstructionSt. Louis, MO
ConstructConnectCincinnati, OH

See All 8 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Date: May 14, 2026
Bid Due Date: June 8, 2026 2:00 p.m.
PLEASE DIRECT INQUIRIES REGARDING THIS QUOTE TO:
Eric Kohm
contact@example.gov
+1 (555) 000-0000 ext. 227
Asphalt Paving Project (OCC2025-03)
TECHNICAL SPECIFICATIONS
PART 1 - GENERAL
1.00 GENERAL
A. This project will have one site with two types of Asphalt; A 3” base course over the previously installed sewer and a 2” overlay over the entire street and four sites with a 3” base course of previously installed sewer.
B. The base course will consist of 3” of “BB” or “X” installed in the trench line. The Trench measures 225’ x 4’ wide with three crossing that measure 3’ wide by 15’ long on Woodland Trails, 12’ x 12’ area at Clark Drive and Woodland Trails, 8’ x 8’ area in front of No. 1009 Woodland Trails Court, 12’ x 12’ area in front of No. 1002 Woodland Trails Court, 8’ x 8’ area at entrance to Grand Oaks Moblie Home Park, an 8’ x 8’ area at intersection of Americana Way and Waybridge Lane, and trench line on West Drive 140’ x 5’ wide. These areas with need to have the existing granular material removed and disposed prior to the asphalt installation. These areas will require the installation of 40 tons of asphalt. All work shall be completed in a workman like manor. All work for this portion of the project is confined within public right of way.
C. The second portion of this project shall consist of a 2” asphalt overlay over Woodland Trails Drive from the District’s existing Manhole at No.1049 Woodland Trails to the completion of the new sewer at No.1055 Woodland Trails Drive. This area will require the installation of 88 tons of Type BP-1 asphalt. All work shall be completed in a workman like manor. All work for this portion of the project is confined within public right of way.
D. This project includes, but is not limited to, the following items, which are listed for the convenience of the contractor in understanding the intended scope of work.
1. Asphaltic concrete surfacing.
2. Clean up.
E. The Contractor shall furnish all labor, materials, and equipment necessary to complete all paving indicated on the drawings and as specified herein.
F. All paving shall consist of the following designs: 4” thick asphaltic concrete base course and 2” thick asphaltic concrete wearing surface course. Unless indicated differently on the drawings.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS