Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ENV26-BCP-OKAN-009 - Myra Bellevue Provincial Park - Stewart Road East Day Use Area Upgrades

Closed
BCENV26-BCP-OKAN-009International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utility installation involving tunneling, boring, jacking, and micro tunneling, as well as site work such as land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including storm water pollution prevention and waste management. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Quotes are due by November 18, 2025, and should be submitted through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 237310
New
SLED
2657ITB - LPGA Boulevard & Jimmy Ann Drive Intersection
Solicitation # 2657ITB
Solicitation 2657ITB is an invitation for bids issued by the City of Daytona Beach Public Works department for the LPGA Boulevard and Jimmy Ann Drive Intersection project. The project requires a contractor to provide all labor, materials, equipment, and supervision necessary to complete the work, including sediment control and storm water management. All work must adhere to current ADA requirements for sidewalks and ramps, OSHA safety standards, and Florida Methods for sampling and testing. The contractor is prohibited from using asbestos-containing materials or lead-based paint without written approval and must comply with Build America, Buy America (BABA) sourcing preferences, specifically regarding US-manufactured steel and iron. Bids must be submitted exclusively through the OpenGov platform by December 15, 2026, at 2:00pm. The contract will be awarded to the lowest responsive and responsible bidder, with the City reserving the right to verify the bidder's financial resources, facilities, and experience. Successful bidders must provide 100% Performance and Payment Bonds for contracts exceeding $100,000. The contractor must also comply with prevailing wage rates, Equal Employment Opportunity (EEO) standards, and Title VI of the Civil Rights Act. Payment applications are reviewed within a 20-day period per the Prompt Payment Act.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
Alberta Road Reconstruction Phase III
Solicitation # RFP 2027-10
The Alberta Road Reconstruction Phase III project, managed by the City of Edinburg, Texas, involves comprehensive roadway and drainage improvements. The scope of work includes the construction of a raised concrete median along Closner Boulevard (Business Highway 281), the installation of concrete riprap, and paving work on Alberta Road between Closner Boulevard and I-69C, which consists of both roadway reconstruction and milling and overlay. The contractor is responsible for providing all labor, materials, equipment, and supervision, including traffic control, sidewalk installation, pavement striping, and SWPPP measures. The project is expected to reach substantial completion within 150 calendar days and must adhere to TxDOT 2024 Standard Specifications and the latest City of Edinburg Standards Manual. Proposals for RFP 2027-10 are due by December 1, 2026, and will be evaluated on a points-based system where price accounts for 50 points, prior experience for 20 points, and team resumes for the remaining score. Required submission documents include a statement of qualifications, an equipment and material list, and various certifications regarding debarment and non-bribery. For contracts exceeding $25,000, a bid guarantee of 5% is required, and the successful contractor must provide EJCDC performance and payment bonds. Payment is processed via applications for payment reviewed by a Resident Project Representative, and the Engineer serves as the sole judge of acceptability for all materials and functional equality.
Engineering

POSTED

about 15 hours ago

DEADLINE

in 20 days
NAICS: 237310
New
SLED
FY2027 Major Roads Resurfacing
Solicitation # 2027-ITB-PW-003-MR
The City of Cape Coral, Florida, is soliciting bids for the FY2027 Major Roads Resurfacing project under solicitation number 2027-ITB-PW-003-MR. The scope of work involves an asphalt concrete resurfacing program for major roads in Lee County, including the placement of Superpave Type SP-12.5 asphalt overlay, the replacement of pavement markings and raised pavement markers, and site restoration such as street sweeping and sod replacement. All work must adhere to the Florida Department of Transportation Standard Specifications for Road and Bridge Construction, the Manual of Uniform Traffic Control Devices, and City Engineering Design Standards. The contractor is responsible for supervising the work and employing an independent testing laboratory, with the City's Project Manager serving as the final judge of quality. As an Invitation to Bid, the contract will be awarded to the lowest responsive and responsible bidder based on price and factors including capacity, schedule, professional standing, and past performance. Key requirements include a one-year warranty on all materials and work, and the submission of closeout documentation within 30 days of final striping. For projects valued at $200,000 or more, a Public Construction Bond or Performance and Payment Bond of 100% of the contract amount is required. Additionally, contractors must comply with the Davis-Bacon Act, Executive Order 11246 regarding equal employment, and specific environmental protections for threatened Burrowing Owls. Bids must be submitted electronically via the OpenGov portal by 2:00 pm on December 15, 2026. Required documentation includes a bid security, corporate resolution, and proof of Florida business registration via sunbiz.org. Payments are issued exclusively via direct deposit (ACH). Performance and payment obligations are contingent upon annual appropriation by the City Council.
Public Works

POSTED

about 17 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Myra-Bellevue Provincial Park, located east of Kelowna, focuses on preserving the North Okanagan Basin and Highlands ecosections across a wide elevational range and offers significant recreational opportunities through features like Little White Mountain, Myra Canyon, historic Kettle Valley Railway, and various trails. The Stewart Road East Day Use Area within the park is a key recreational and emergency access point that supports over 300,000 visitors annually during summer. The contract calls for upgrades to this area, including expansion of the parking lot and improvements to trail access and site amenities to better serve hikers, bikers, horseback riders, tourism operators, and emergency services. The scope of work includes substantial earth excavation, sub-base and base course construction, and provision of hot mix asphalt paving for the parking lot. Additionally, site enhancements involve installing picnic tables, two pit toilet buildings, fencing, wheel stops, traffic signage, and pavement markings. The construction is scheduled to take place over three months beginning in February 2026 with completion before April 2026. Bidders must attend a mandatory site meeting on February 3, 2026, where tender documents will be provided, and submissions are due electronically by 2:00 PM local time on February 17, 2026. This project is managed by BC Parks under the Ministry of Environment and Climate Change Strategy, emphasizing its significance within provincial recreational infrastructure.

General Info

Upgrades to Stewart Road East Day Use Area including parking, trails, amenities; construction Feb-Apr 2026.

Agency

Government of Canada → BC Parks - Provincial Services Branch

Place of Performance

CAN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → BC Parks - Provincial Services Branch
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → BC Parks - Provincial Services Branch
Office AddressN/A

Full Description

Show more
Myra-Bellevue Park was established to provide increased representation of the North Okanagan Basin and North Okanagan Highlands ecosections by capturing the full elevational range from the outskirts of Kelowna eastward to the crest of the mountains. Myra Bellevue Park includes features such as the dramatic escarpment of Little White Mountain, the scenic Myra Canyon, a number or existing trails and the historic Kettle Valley Railway, with its trestles and tunnels, have provincial recreational appeal and provide long term recreational opportunities for the increasing Okanagan Valley population.The Stewart Road East Parking Area are critical infrastructure within the Park, supporting recreational opportunities with visitation upwards of 300,000 people during the summer season. Currently the Stewart Road East Trailhead services the general public, seasonal biking opportunities, hiking, horse back riding, various tourism operators, as well as all emergency response needs within the Park. The scope of work is to expand the parking area, improve the trail access and amenities. The anticipated work schedule is three months beginning Feb 2026 and concluding construction prior to April 2026. Tenders marked:“Tender for Myra-Bellevue Provincial Park – Stewart Road East Day Use Area Upgrades” WILL BE RECEIVED UNTIL 2:00 PM local time, February 17th, 2026, electronically to the Ministry of Environment and Climate Change Strategy, BC Parks Kootenay/Okanagan Region.This tender includes upgrades to the parking lot and site amenities at the Stewart Road East Day Use Area in Myra-Bellevue Provincial Park. In general, the work consists of the following:Parking Lot Upgradeso 1200 m3 common excavation and on-site reuseo 900 m3 common excavation and disposalo 8050 m2 75mm Sub-base – 300mm thicknesso 7420 m2 25mm Base Corse – 100mm thicknesso 6340 m2 Hot Mix asphalt – 50mm thickness (Provisional)Site Amenity Upgradeso Install three (3) Owner supplied picnic tableso Supply and install two (2) pit toilet buildingso 320 lineal metres post and rail fenceo Wheel stops, traffic signage, line and symbol paintingA mandatory site meeting will be held at 10:00 AM Tuesday, February 3rd , 2026 on-site at Stewart Road East Day Use Area. Attendance of this meeting for its entirety is Mandatory for all bidders. Tender documents will be distributed at the site meeting. To ensure document availability, please confirm your attendance at this meeting by email to: Sign up to see this detail

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS