Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Washington was posted on July 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Environmental and Regulatory Compliance Support

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Environmental Consulting for Pump Station 1 and Soquel Pump Station
Solicitation # RFP No. PW-0302
The City of Santa Cruz Public Works Department has issued solicitation RFP No. PW-0302 for environmental consulting services related to Pump Station 1 and the proposed Soquel Pump Station. This initiative is part of a broader effort to mitigate downtown flooding and maintain FEMA certification. Technical analyses by Balance Hydrologics and Schaaf & Wheeler determined that existing conveyance limitations and the infeasibility of upsizing certain toe-drains necessitate the construction of a new pump station at the southwestern corner of the Soquel Avenue bridge crossing, alongside critical upgrades to the existing Pump Station 1. The scope of work focuses on the inspection, assessment, and rehabilitation planning of steel discharge piping at Pump Station 1, utilizing CCTV inspections and corrosion assessments to ensure long-term structural integrity. Key deliverables include CCTV video reports, corrosion assessment reports, and rehabilitation recommendations such as CIPP lining or cathodic protection. The project must adhere to various technical standards, including NASSCO for pipeline defects and the California Electrical Code, NEMA, and NFPA for electrical systems. While formal contract pricing is not finalized, preliminary engineering estimates for the Soquel Station and Pump Station 1 improvements range from approximately 2.4 million to 4 million dollars. The solicitation was posted on August 25, 2026, with a response deadline of September 26, 2026.
Public Works

POSTED

about 17 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract seeks comprehensive environmental and regulatory compliance support for proposed designs, with a focus on ensuring adherence to NEPA, RCRA, and applicable state environmental regulations. Key areas of emphasis include tower siting, energy consumption patterns, and selection of construction materials, all of which must align with federal and state environmental standards to mitigate ecological impact and ensure sustainable practices. The work involves reviewing and validating design plans to confirm they meet required environmental thresholds and procedural guidelines throughout the planning and development phases. This is a subcontract opportunity issued by the City of Spokane under NAICS code 541620, with a response deadline of August 4, 2026. The solicitation was posted on July 6, 2026, and is open to qualified entities capable of providing expert environmental compliance services. While specific performance location details are not provided, the scope is tied to projects under the jurisdiction of the City of Spokane in Washington, requiring proposers to demonstrate proficiency in navigating local, state, and federal environmental frameworks relevant to infrastructure development.

General Info

Environmental compliance support for Spokane infrastructure projects under NEPA, RCRA, and state regulations, due August 4, 2026.

Agency

Washington → City of SpokaneView Agency

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of RFQu 6533-26.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Radio Network System Review and Design Services

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Spokane
ContactsNo contacts available
OfficeN/A
Organization / Agency
Washington → City of Spokane
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Ensure proposed designs comply with NEPA, RCRA, and state environmental regulations, particularly related to tower siting, energy use, and materials.

More opportunities from Washington → City of Spokane

Same awarding agency

NAICS: 237110
New
SLED
Esmeralda Golf Course Sewer Improvements
Solicitation # PW ITB 6612-26
The City of Spokane Parks and Recreation Department is soliciting bids for the Esmeralda Golf Course Sewer Improvements project, identified as PW ITB 6612-26. The project scope includes a base bid for the procurement and construction of new Force Main Sewer Improvements, featuring a new lift station, 2-inch HDPE force main, 48-inch manhole, and 6-inch sewer main. An additive alternate is also available for gravity sewer improvements within the Rich Avenue right-of-way. The engineer's estimate for the project is $225,000. A mandatory pre-bid meeting is scheduled for August 27, 2026, at 1:00 PM at the Esmeralda Golf Course Clubhouse. All bids must be submitted electronically through the ProcureWare portal by the deadline of September 8, 2026, at 11:00 AM PST. Prospective contractors must meet several stringent qualification and responsibility requirements. A Certified Arborist must be designated as either the General Contractor or a Subcontractor and must appear on the City of Spokane Urban Forestry Approved Arborists list. Bidders must provide a bid bond equal to 5% of the total bid amount and must demonstrate specific work experience, including the completion of at least two municipal sewer public works projects of similar scope within the last five years. The apparent low bidder will undergo a supplemental responsibility review covering safety records, prevailing wage compliance, and past performance evaluations. The contract will be governed by AIA Document A201-2007 General Conditions, modified by supplementary conditions, and requires adherence to all applicable Washington state laws, including contractor registration, industrial insurance, and prevailing wage standards.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 14 days
View Details