Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Environmental Drilling and Soil Sampling

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Engineering Bureau of Public Works in California involves performing environmental drilling and soil and groundwater sampling for prime contractors on BAVN environmental projects. The scope of work includes the installation of borings and wells utilizing direct push or hollow-stem drill rigs and sampling tools in accordance with Task 2.3. The contractor is required to strictly adhere to the Project Health and Safety Plan and is responsible for delivering all collected samples along with a Log of Well Installation. The work is performed in Los Angeles under NAICS code 213111.

General Info

Subcontract for environmental drilling and soil/groundwater sampling for BAVN projects in Los Angeles.

Place of Performance

Los Angeles, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 21-024.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

TOS No. 21-024 - West Los Angeles Maintenance Yard Project - Limited Phase II Environmental Site Assessment

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom TOS No. 21-024 - West Los Angeles Maintenance Yard Project - Limited Phase II Environmental Site Assessment
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering Bureau, Public Works
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs environmental drilling and soil/groundwater sampling for prime contractors on Public Works BAVN environmental projects. Installs borings and wells using hollow-stem or direct push drill rigs and sampling tools per Task 2.3. Adheres to the Project Health and Safety Plan (HASP). Delivers collected samples and a Log of Well Installation.

Similar Contracts

Same NAICS industry code

NAICS: 213111
New
SLED
DS-761-270000000007-2 | Wellmaster Newaygo & Mecosta OW Plug Project 22 wells
Solicitation # 270000000007
The State of Michigan, Department of Environment, Great Lakes, and Energy has issued a Request for Quotation (RFQ) for the Wellmaster Newaygo and Mecosta Orphan Well Plugging Project. The scope of work involves the plugging, drilling, re-drilling, and site restoration of two orphan wells, specifically the Troyer 1-7A and Daniels 1-1B, located in Newaygo and Mecosta Counties. The comprehensive process includes site preparation by clearing brush and trees, setting up workover rigs and pumps, cleaning and logging the wellbore, and cementing from the bottom upward to protect the freshwater aquifer. Additionally, the contractor must remove all abandoned infrastructure, including flowlines, electric lines, tanks, and debris, and perform final site restoration through grading, mulching, and seeding. Award selection is based on best value rather than the lowest price, with a minimum technical score of 80 required for consideration. Evaluation factors include the quality of the proposed project timeline, key personnel, owned equipment, and technical experience. Bidders must submit a detailed project timeline categorized by site prep, mobilization/demobilization, plugging, and site restoration, along with a completed pricing matrix (Schedule B). The project requires strict adherence to Davis-Bacon Prevailing Wages for all personnel and subcontractors. Invoicing is subject to pay certification verification, with specific restrictions on the number of site supervisors billable per day and a cost-plus-overhead model for materials not listed in the pricing matrix. There is no specified set-aside status for this solicitation.
Con Hall

POSTED

6 days ago

DEADLINE

in 3 days
View Details

More opportunities from California → Engineering Bureau, Public Works

Same awarding agency

NAICS: 541330
SLED
TOS No. 105 - Baldwin Vista Green Streets Project
Solicitation # 105
Task Order Solicitation No. 105 is for the Baldwin Vista Green Streets Project, managed by the City of Los Angeles Bureau of Engineering and LA Sanitation and Environment. The project focuses on stormwater capture and infiltration within the Baldwin Vista community, specifically along Coliseum Street between Hauser Boulevard and Nicolet Avenue. The scope of work includes engineering services for pre-design, design, bid and award, and construction support to install approximately 23 double drywell units, one single drywell unit, 450 square feet of bioswales with native landscaping, 40 new street trees, and seven educational displays. The project is funded through the Safe Clean Water Program, with total estimated costs ranging from 9.3 million dollars for construction to approximately 10.9 million dollars when including planning, design, operations, maintenance, and three years of post-construction monitoring. The contract utilizes a hybrid compensation structure, with pre-design and design phases paid on a lump-sum basis and bid, award, and construction support services reimbursed at hourly-salary rates. Proposals are evaluated based on project understanding and technical approach (30 percent), team qualifications (20 percent), value and resource allocation (20 percent), knowledge of City standards (20 percent), and project delivery performance (10 percent). Key requirements include adherence to ADA accessibility, California prevailing wage laws, and a Minority Business Enterprise participation goal of 18 percent. Deliverables follow a phased review process with required approvals at 30, 50, 90, and 100 percent design stages. The solicitation closing date is January 5, 2027, with the task order expected to be issued by April 15, 2027.
Engineering Services

POSTED

13 days ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS