Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Envision O Street Urban Greening Project - 1400, 1500 and 1600 Blocks

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Envision O Street Urban Greening Project, managed by the Capitol Area Development Authority, aims to create a nature-based cool corridor in downtown Sacramento. The project focuses on the 1400, 1500, and 1600 blocks of O Street, as well as four half-block faces on 15th Street, Neighbors Alley, and 17th Street. Key deliverables include converting heat-absorbing turf, concrete hardscape, and compacted decomposed granite into climate-adapted landscapes, planting 12 new street trees, installing permeable concrete to manage stormwater and support tree roots, and modernizing irrigation systems for native plantings. The project is funded through a Proposition 4 Urban Greening Grant of approximately 579,634 dollars, supported by the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024. Administratively, the project is categorically exempt from the California Environmental Quality Act under Class 1 and Class 4 exemptions. The Capitol Area Development Authority has committed to operating and maintaining the project for at least 20 to 25 years following completion. Executive Director Danielle Foster serves as the authorized representative, with Marc de la Vergne acting as the lead agency contact.

General Info

Envision O Street project creates cool corridor with trees, permeable concrete, and drought-tolerant landscaping in downtown Sacramento.

Place of Performance

O street between 14th and 17th St plus 4 half-blocks on 15th and 17th from O St to Neighbors Aly, Sacramento, CA, 95814

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Capitol Area Development Authority
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Marc de la VergneDirector of Sustainability, Placemaking and Special Projects

Full Description

Show more
Through the Envision O Street Urban Greening Project, we will transform three contiguous blocks of public right-of-way in downtown Sacramento (the 1400, 1500, and 1600 blocks of O Street) into a continuous nature-based cool corridor. Four half-block faces on 15th Street, Neighbors Alley, and 17th Street will also be included because they are contiguous with O Street. We will convert heat-absorbing conventional turf, concrete hardscape, and compacted decomposed granite to climate-adapted landscape, add 12 new street trees, replace a section of asphalt with permeable concrete to capture stormwater and fee adjacent tree roots, and modernize irrigation to perform efficiently with native and climate-adapted plantings.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 18 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 19 hours ago

DEADLINE

in 11 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS