Enz Quarry Use Permit and Reclamation Plan Amendment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Enz Quarry Use Permit and Reclamation Plan Amendment Project seeks to modify the existing Conditional Use Permit and SMARA Reclamation Plan for a quarry located south of Hollister in San Benito County. Key changes include a significant increase in the maximum annual production rate from 100,000 to 375,000 tons, the construction of a new materials processing pad by lowering the quarry floor, and the formal integration of an existing rock saw operation. The project also allows for the import of aggregate materials to diversify product offerings without increasing truck traffic and removes an obsolete road maintenance fee condition. The amendment further expands and modifies the reclamation plan boundary to encompass existing disturbed areas while ensuring a 50-foot setback from Thompson Creek and the protection of sensitive cultural and tribal resources. Despite these operational expansions, the project maintains the previously approved hours of operation and the final reclaimed land use. The initiative is managed by San Benito County with coordination between the project planners and the owner-operator.

General Info

Amends Enz Quarry permit to increase production, modify processing, and update reclamation plans.

Agency

California → San Benito County

Place of Performance

Limekiln Road and Cienega Road, Hollister, CA, 95023

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Benito County
Contacts3 people available
OfficeN/A
Organization / Agency
California → San Benito County
Office AddressN/A
Contacts
Susie PinedaContract Planner
Robert W EnzOwner/Operator
Bruce SteubingPrincipal Planner

Interested Companies (1)

Benchmark ResourcesFolsom, CA

Full Description

Show more
The Enz Quarry Use Permit and Reclamation Plan Amendment Project would amend the existing Conditional Use Permit and Surface Mining and Reclamation Act (SMARA) Reclamation Plan for the existing Enz Quarry, located approximately I 1 miles south of Hollister in unincorporated San Benito County. The project includes increasing the maximum annual production rate from I 00,000 tons to 375,000 tons; lowering the quarry floor within a portion of the existing mining area to construct a new materials processing pad; incorporating an existing rock saw operation into the approved use permit; expanding and modifying the reclamation plan boundary to include existing disturbed processing, stockpile, and loadout areas, accommodate limited expansion of those areas, maintain a minimum 50-foot setback from Thompson Creek, and avoid sensitive cultural and tribal resources; authorizing the import of aggregate materials to expand product offerings without increasing truck trips; and removing an obsolete project-specific road maintenance fee condition that has been superseded by the County’s mining road maintenance fee ordinance. Mining operations would continue through the approved operational life of the quarry, with no change to the approved hours of operation or final reclaimed land use.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Alligator Creek Weir Structure Repairs
Solicitation # FWC 26/27-33C
The Florida Fish and Wildlife Conservation Commission issued solicitation FWC 26/27-33C for the concrete rehabilitation of a 70-year-old water control weir structure located at the north prong of Alligator Creek in the Babcock Webb WMA. The scope of work includes short-term repairs such as spall and crack repairs, as well as the restoration of a significantly eroding cold joint, all performed according to specifications by GM Hill Engineering and Chapter 255 of the Florida Statutes. While the agency's estimated budget for the project was 45,000 dollars, the contract was awarded to A Thomas Construction Inc. following a competitive bidding process that included a mandatory pre-bid conference on September 29, 2026, and a bid opening on October 13, 2026. The awarded contract is a lump sum agreement with a total value of 29,890 dollars. Key requirements for the contractor include the provision of 100 percent performance and labor and material payment bonds regardless of the contract value, adherence to Build America, Buy America domestic material preferences, and compliance with Davis-Bacon Act prevailing wage standards for federally funded construction. The agency decision to award the contract was posted on October 15, 2026, initiating a 72-hour protest period pursuant to Chapter 120, Florida Statutes. Final acceptance of the project is contingent upon a Certificate of Substantial Completion and a final inspection approved by the owner.
Florida Fish and Wildlife Conservation Commission

POSTED

1 day ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS