This Solicitation opportunity from Florida was posted on November 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

EPCOT Generators Decommission and Removal

Closed
C006994State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the decommissioning and removal of electrical generators at EPCOT, specifically two 12.5KV generators, their enclosures, and associated infrastructure, including the demolition of 15KV switchgear, removal of power and control conductors, and abandonment of underground tanks and piping. The work must be performed in accordance with construction drawings, specifications, and all applicable local, state, and federal codes, with the contractor required to hold a valid Florida Electrical License. The scope emphasizes completing all necessary tasks to deliver a fully decommissioned and safe electrical system, including any incidental work needed to achieve a "complete job," even if not explicitly detailed in the drawings or specifications. The project is overseen by the Central Florida Tourism Oversight District, with an estimated contract value between 500,000 and 2 million dollars, and performance will occur at the EPCOT Central Energy Plant site. Bidding is open through an electronic process via the PlanetBids Vendor Portal, with a response deadline of December 19, 2025, and a non-mandatory pre-bid meeting scheduled for December 11, 2025. The solicitation specifies mandatory licensing and safety requirements, including the Florida Electrical License and optional traffic control certifications, which, while encouraged, are not prerequisites for bid submission. The contract does not specify a formal evaluation criteria or award basis but implies compliance and price competitiveness as key factors. The work must meet all safety and quality standards, with inspections likely conducted on-site at the EPCOT facility, and the contract emphasizes transparency and adherence to applicable standards. No detailed information on contract type, specific deliverables, or evaluation factors is provided beyond the scope of work and licensing requirements.

General Info

Documents

1
PDF, High priority: read this first2 pages · rfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MOTOR, ALTERNATING CURROpen now, due in 15 days
  • MOTOR, ALTERNATING CURRENTOpen now, due in 30 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCentral Florida Tourism Oversight District
Contacts1 person available
OfficeN/A

Full Description

Show more
Solicitation Announcement Here: PlanetBids Vendor Portal The Scope of Work for the decommissioning and removal of the EPCOT generators as described by the Construction Drawings and Specifications. Specific elements of the Scope of Work are generally summarized below but this Summary of the Work is not intended to be complete descriptions of the Work. Any quantities or measurements, if included in the summaries, are approximate and are not to be used in estimating the Work.It is the intent of the Owner that the Contractor will perform all of the Work of any kind and natureshown on the Drawings and/or described in the Specifications or other Contract Documents, whichis within the Contractor's Scope of Work, unless specifically excluded or indicated as Ownerfurnished and/or installed. Any Work not specifically indicated on the Drawings and/or described inthe Specifications or other Contract Documents, but is required to fulfill the intent of a "complete job"for the Contractor's Scope of Work, will be considered included in the Contract. Work must meet allrequirements of the local, state and federal codes and standards.A. The Scope of Work for the Epcot generator decommissioning includes, but is not limited to:1. Disconnect and Removal of two 12.5KV Generators and associated enclosures, and emptyfuel tanks.2. Demolition of 15KV Generator Switchgear.3. Demolition of all interconnecting power and controls conductors.4. Closeout and abandonment of underground overflow tank and associated piping.Contractor must provide State of Florida Electrical License.If Contractor has the Advanced and Basic Flagger TTC Certifications, please provide. This is not a requirement of the bid though the plans call for Temporary Traffic Control (formally known as Maintenance of Traffic).

More opportunities from Central Florida Tourism Oversight District

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS