Epoxy-Coated Steel Reinforcement Supplier & Installer

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of FY27-RICHMOND.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sleepy Hollow Road Bridge Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMassachusetts → Group Purchasing
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs reinforcing steel and mechanical splicers for prime contractors on MassDOT/Massport bridge projects. Installs epoxy-coated steel reinforcement and utilizes the Dayton Superior Dowel Bar Splicer System (DB-SAE and DI). Adheres to ASTM B695 Class 50 and AASHTO M 270 Grade 36 standards. Delivers installed reinforcement and mechanical splices.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Concrete Improvements - Elmwood Golf Course Cart Paths Phase 2
Solicitation # 26-067
Solicitation 26-067 (EW2601) is an Invitation for Bid issued by the City of Pueblo Public Works Department for Phase 2 of the concrete improvements at the Elmwood Golf Course. The project scope involves rehabilitating existing cart paths by removing asphalt surfaces and replacing them with new 4-inch concrete. The contract includes a base bid for the removal of 3,550 square feet of asphalt and the construction of 4,346 square feet of concrete, along with two bid alternates for additional removal and construction areas. The successful contractor must complete all work within 60 calendar days from the Notice to Proceed and adhere to a strict timeline, including a pre-construction conference scheduled 7 to 10 days after the notice of award. The contract will be awarded to the responsible bidder providing the lowest and most responsive bid. Bidders must submit a bid bond for 5 percent of the grand total and, upon award, provide performance and payment bonds within ten business days. Key compliance requirements include adherence to the Davis-Bacon Act for labor standards, Section 3 utilization goals for low-income employment, and the Manual of Accident Prevention in Construction for safety. Financial terms include a 10 percent retainage from periodical estimates, with final payment issued within 30 days of final acceptance. Contractors must also maintain valid City of Pueblo licensing and comply with a 3.7 percent city sales and use tax.
Public Works

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details

More opportunities from Massachusetts → Group Purchasing

Same awarding agency

NAICS: 237310
New
SLED
Sleepy Hollow Road Bridge Replacement Project
Solicitation # FY27-RICHMOND
The Sleepy Hollow Road Bridge Replacement Project, solicitation FY27-RICHMOND, involves the complete replacement of an undersized corrugated HDPE culvert with a precast concrete three-sided frame bridge, including precast spread footings and wingwalls. Located in the Town of Richmond, Massachusetts, approximately 0.4 miles east of the ST 41 and Sleepy Hollow Road intersection, the project crosses Cone Brook, a designated Cold-Water Fishery. Consequently, the scope requires strict adherence to the Order of Conditions, the Massachusetts Division of Fish and Wildlife NHESP, and the Army Corps of Engineers General Permit, including the employment of a wildlife specialist for a turtle protection plan. The project aims to prevent road overtopping and erosion by restoring the stream channel to its natural state, while the existing gravel road will remain unpaved. The contract will be awarded to the lowest responsible and eligible bidder based on price and legal compliance. Key administrative requirements include a bid security of 5 percent of the bid price, a performance bond for 50 percent of the contract price, and a labor and materials payment bond. Payments are subject to a 5 percent retainage until substantial completion and must comply with Massachusetts General Laws Chapter 30, Sections 39F and 39G. The contractor must employ a competent superintendent on-site at all times and adhere to prevailing wage rates, ADA standards, and workplace safety regulations. Technical specifications include the use of 5000 PSI high-performance cement concrete and epoxy-coated steel reinforcement, with quality assurance managed through Certificates of Compliance and plant inspections.
Highway, Street, and Bridge Construction

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS