EPP III Cables & Conduits
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Defense Logistics Agency-Aberdeen, for the Army Integrated Logistics Supply Center, is seeking a five-year Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the procurement of cable assemblies, conduit assemblies, a reel cable, and a hybrid relay. These components support the Electric Power Plant (EPP) III, which serves as the primary power source for the PATRIOT Missile Defense System. The requirement includes 14 specific National Stock Numbers (NSNs) with varying best estimated quantities, and the contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) method. There is no set-aside for this procurement. Technical requirements mandate adherence to MIL-STD-2073-1E with Change 4 for packaging and MIL-STD-129R and MIL-STD-130N for marking and Item Unique Identification (IUID). Contractors must maintain a quality system in accordance with ANSI/ISO/ASQ(E) Q9001-2015 and utilize the Wide Area Workflow (WAWF) system for invoicing and payment. Proposals are evaluated based on technical acceptability, delivery schedules, and past performance over the last three years, with production prices evaluated on a weighted basis. The current response deadline is November 23, 2026.
General Info
Place of Performance
Set-Aside
Documents
5Read all 5 documents
Due in 25 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 5 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice description changed.
Response deadline changed from Nov 6, 2026 to Nov 23, 2026. The notice description changed.
Response deadline changed from Nov 23, 2026 to Dec 18, 2026. The notice description changed.
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
This is a Request for Proposal (RFP) for a 5-Year Firm-Fixed Price (FFP), hardware, Indefinite Quantity (IDIQ) contract. This RFP is for the items listed below and total Best Estimated Quantity (BEQ):
Hardware:
NSN: 6150-12-343-3731 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0501, total BEQ: 27
NSN: 6150-12-343-3732 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0504, total BEQ: 12
NSN: 6150-12-343-3733 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0058, total BEQ: 36
NSN: 6150-12-343-3734 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0502, total BEQ: 25
NSN: 6150-12-343-3735 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0503, total BEQ: 21
NSN: 6150-12-343-3736 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0050, total BEQ: 21
NSN: 6150-12-343-3737 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0505, total BEQ: 195
NSN: 6150-12-343-3738 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0148, total BEQ: 150
NSN: 6150-12-343-3739 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0149, total BEQ: 21
NSN: 5975-12-343-4086 Nomenclature: Conduit Assembly, Part Number: 115-02-0016, total BEQ: 13
NSN: 5975-12-343-4089 Nomenclature: Conduit Assembly, Part Number: 115-02-0010, total BEQ: 13
NSN: 8130-12-358-4625 Nomenclature: Reel Cable, Part Number: 480-02-0047, total BEQ: 17
NSN: 5945-01-577-2614 Nomenclature: Relay, Hybrid Part Number: 335-01-0040, total BEQ: 60
NSN: 5975-12-343-4088 Nomenclature: Conduit Assembly Part Number: 115-02-0006, total BEQ:
Please reference attached solicitation along with the attachment, Exhibit A, for all guidance and processes needed for submission.. If you have any questions, please contact Matthew Crouch +1 (•••) •••-••••Sign up to see this detail, or •••••@•••••.•••Sign up to see this detail.
Amendment 0001 was required to make the following changes as follows:
1. Amend the solicitation to correct the closing date. Also, to update the Packaging/packing shall be in accordance with MIL-STD-2073-1E w/ Chg 1 to MIL-STD-2073-1E w/ Chg4. Please reference attached amendment 0001 for both changes.
2. To provide the following Question and Answers as follows:
Q&A: Section L permits identifying NSNs that cannot be bid, but states only one contract will be awarded. Can an otherwise compliant offer covering fewer than all 14 NSNs receive award? For a distributor supplying approved Vincorion CAGE 1VD61 parts, what manufacturer authorization/traceability evidence is required, and which quality-system obligations must be met by the reseller versus the manufacturer? It can be proposed to part or all of the solicitation (unless we state in the solicitation it is all or nothing) We will evaluate upon receipt. As to traceability, it would be the same for counterfeit part traceability and show what manufacturers are using to submit the cable some of those connectors are manufactured in Europe and not by Vincorian solely.
Q&A: Section L discusses mandatory FAT plan, report and sample pricing, but Section B appears to contain production CLINs 1001–5014 and data ELINs A001/B001 under CLIN 9000, without corresponding FAT CLINs. Does FAT apply? If so, please provide quantities, schedule, pricing lines and waiver criteria. Should A001/B001 be separately priced or NSP, and how will their costs enter evaluation? There is no FAT plan for this requirement. For CLINs A001/B001, they should be NSP and then it would be evaluated inside of the price as a total.
Q&A: The TRD references a CECOM G2 Antiterrorism/OPSEC/Security Cybersecurity Review Cover Sheet, which was not located in the two supplied files. Please provide it and confirm any applicable offeror CMMC requirement or assessment level, in addition to the incorporated NIST assessment provision. This is an internal Government documentation completed by our mission partner as reference. This is not part of the RFP.
Amendment 0002 was required to make the following changes as follows:
The purpose of amendment 0002 is to extend the offer acceptance date to November 23, 2026. Reference attached amendment 0002 as guidance.
Amendment 0003 was required to make the following changes as follows:
The purpose of amendment 0003 is to extend the offer acceptance date to December 18, 2026. Reference attached amendment 0003 as guidance.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → DLA Land At Aberdeen
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
