Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from New Hampshire was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion and Sediment Control

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
Federal
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
This contract, titled ACT-1427-00 Construction Cycle 10, involves providing Davis Bacon construction services for the Federal Aviation Administration's Pavement Research and Development Section at the William J. Hughes Technical Center in Atlantic City, New Jersey. The scope of work includes the controlled demolition of existing pervious runway test pavement, minor design adjustments, and the construction of new concrete test slabs and pavement structures. The project requires the provision of aggregate subbase and the updating of the asphalt base course to a stabilized drainable base course for a concrete pavement area measuring approximately 310 ft by 52.5 ft with a thickness of 15.5 inches. The subcontractor is responsible for procuring materials, removing construction waste, and providing professional engineering and testing laboratory services, including California Bearing Ratio and Plate Load tests. Work is generally scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This solicitation is a Small Business set-aside, including certifications for Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses.
Parsons Corporation

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 237130
New
SLED
Ffa Last Mile Project Phase 2
Solicitation # IT-FIBER25
The City of Indio, California, is soliciting bids for the FFA Last Mile Project Phase 2, identified as solicitation IT-FIBER25. This public works project involves the installation of 1-inch and 2-inch HDPE roll conduit, vaults, and underground fiber cable with slack, as well as splicing. The scope of work includes directional boring, micro-trenching, machine cut open trenching, and the removal and replacement of asphalt and concrete. All work must be performed in accordance with the 2024 edition of the Standard Specifications for Public Works Construction, applicable permits, and regulations. Bidders must possess a valid California Class A General Engineering Contractor or C-7 Low Voltage Systems Contractor license, a current City business license, and registration with the DIR. Evaluation is based on the bidder's financial standing, general competency, and specific experience in fiber optic outside-plant construction, including the availability of certified fiber splicing technicians and OTDR and power-meter testing capabilities. Bids are due by 11:00 AM on December 10, 2026, and must include a bid security of at least 10% of the total bid. The contract requires performance and payment bonds equal to the contract price, as well as a warranty or maintenance bond valid for one year from acceptance. A 5% retention will be withheld from progress payments. Liquidated damages are set at $1,000 per calendar day for any work remaining incomplete beyond the project deadline. As a public work project, the contractor and all subcontractors must pay wages in accordance with Labor Code Section 1770 et seq.
City of Indio, California

POSTED

3 days ago

DEADLINE

in 11 days
NAICS: 237130
New
SLED
On-Call Fiber-Optic Network (FON) Enhancements and Repairs
Solicitation # SE-26-02
The Port of Long Beach is seeking a qualified contractor for solicitation SE-26-02 to provide on-call design, procurement, construction, and installation services for its Fiber-Optic Network (FON). The scope of work involves performing enhancements and repairs, providing materials such as fiber-optic cable, microduct, conduit, vaults, and hubs, and integrating these components into the existing network. The contractor is required to use microduct and air-blown fiber as the standard installation methodology, conduct quality assurance testing, and provide training to Port staff on operation and maintenance. All work is performed on a turnkey basis under the direction of the Port’s Security Division Project Management Team and is managed through the issuance of specific task orders. This is an on-call contract with a rate sheet covering a three-year period, utilizing both prevailing and non-prevailing wage rates. Proposals are evaluated on a 100-point scale focusing on team organization, technical approach, and a 10% combined SBE/VSBE participation goal. The selection process involves a written evaluation and potential interviews, with the Port not bound to accept the lowest bid. Key requirements include the provision of performance and payment bonds, adherence to ANSI/ICEE/NEMA/UL standards, and a maximum 15% markup on third-party materials. Proposals must be submitted via the PlanetBids portal by December 16, 2026. There is no specific set-aside status for this solicitation.
City of Long Beach, acting by and through its Board of Harbor Commissioners

POSTED

3 days ago

DEADLINE

in 17 days
NAICS: 237130
New
SLED
Ffa Last Mile Project Phase 2
Solicitation # IT-FIBER25
The FFA Last Mile Project Phase 2 (IT-FIBER25) is a public works construction project for the City of Indio, California, focused on the installation of a fiber optic network. The scope of work includes the installation of 1” and 2” HDPE roll conduit, vaults, directional boring, micro-trenching, and machine cut open trenching, as well as the installation of underground fiber cable with slack and splicing. The project also requires asphalt and concrete removals and replacements, with final site restoration and cleanup. The contract is awarded to the lowest responsive bidder based on the sum of the Base Bid and Schedule A. To be considered responsive, bidders must hold a valid Class A General Engineering Contractor license and demonstrate at least three consecutive years of experience in fiber optic outside-plant construction using permanent employees. Performance is divided into two phases: material procurement must be completed within 20 calendar days of the first Notice to Proceed, and construction must be completed within 180 working days of the second Notice to Proceed. The project is subject to the Build America, Buy America Act and requires compliance with prevailing wage rates under Labor Code Section 1770. Contractors must provide faithful performance and payment bonds equal to the contract price and maintain required insurance, including Workers’ Compensation. Invoicing is managed through a Leidos Project Coordinator who reconciles monthly preliminary invoices using Daily Production Reports. Payment is contingent upon the City Council appropriating sufficient funds for the fiscal year.
City of Indio

POSTED

3 days ago

DEADLINE

in 11 days
NAICS: 237130
New
SLED
Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)
Solicitation # 27-0075-RFQ-DB
Pinellas County is soliciting a design-build partner for the design and construction of a centralized power distribution center at the County Solid Waste Disposal Complex in St. Petersburg, Florida. The project aims to modernize and consolidate electrical infrastructure by replacing existing Duke Energy services with a centralized microgrid. This system will integrate a Waste-to-Energy facility, a floating photovoltaic array with an estimated 5 MW capacity, and various site utility services. Key infrastructure requirements include a new switchgear building elevated at least two feet above the 500-year floodplain and advanced distribution infrastructure compliant with the Florida Building Code, NEC, and NESC. The project is structured in two phases: Phase 1 focuses on design and permitting with a duration of 274 to 365 days, and Phase 2 covers construction with a duration of 390 to 480 days. Phase 2 will be executed as a Guaranteed Maximum Price (GMP) contract. Proposers must demonstrate recent experience with similar projects and provide performance and payment bonds for 100% of the agreement amount. Evaluation is based on a 200-point scale, considering firm experience, Pinellas County Small Business Enterprise status, and the ability to meet schedule and budget requirements. There is no set-aside status for this solicitation.
SOLID WASTE

POSTED

4 days ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This subcontract for Erosion and Sediment Control involves the installation and maintenance of critical erosion control measures, including silt fences, wattles, and inlet protection. Managed by the New Hampshire Public Works Engineering agency, the project falls under NAICS code 237130. The solicitation was posted on March 18, 2026, with a response deadline of April 8, 2026. There is no specific set-aside status designated for this contract.

General Info

Agency

New Hampshire → Public Works - Engineering

Place of Performance

NH, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025-RFx-039.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Poverty Lane Isolation Valve Building Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • ANE-1256-02 BNACTS - UIS COMM BDF RCAG Tower InstallationOpen now, due in 11 days
  • ANE-1251-01 BNACTS-UIS COMM- LNK RTR Tower InstallationOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Hampshire → Public Works - Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
New Hampshire → Public Works - Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation and maintenance of erosion control measures such as silt fences, wattles, and inlet protection.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS