This Solicitation opportunity from New Hampshire was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Poverty Lane Isolation Valve Building Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the furnishing and installation of an isolation valve building measuring approximately 9 feet 4 inches by 17 feet 4 inches to manage water flow to the Farnum Hill Water Storage Tank in New Hampshire. This building will be constructed on a reinforced concrete foundation with frost walls and a slab on grade, featuring 2x6 wood stud walls, 2x8 wood rafters, fiberglass insulation, plywood sheathing, red cedar clapboard siding, and a standing seam metal roof. It will include two insulated steel doors and be outfitted with interior and exterior LED lighting, wall heaters, a dehumidifier, ventilation fan, and louvers. The mechanical equipment installed will comprise a butterfly valve, flow meter with transmitter, hypochlorite feeding system, chlorine controller and analyzer, pressure transmitter, telemetry panel, as well as a power and control panel equipped with a PLC controller. Electrical work includes new primary and secondary electrical service installations, conduits, a meter box, and communication systems. Site work will connect the building to the existing water system, including water main and gate valve installations, copper sampling service, driveway and paved apron construction, grading, and landscaping. The procurement is managed by the City of Lebanon's Public Works - Engineering office, with the project solicitation open until early April 2026. The contract is governed by detailed conditions and assurance provisions, including performance, payment, and bid bonds, which guarantee the contractor’s compliance with payment to subcontractors, faithful performance of work, and commitment upon bid acceptance. These bonds and the comprehensive general conditions document outline the legal framework, roles, responsibilities, and administrative requirements necessary for project execution in accordance with city codes and New Hampshire statutes.
General Info
Place of Performance
Set-Aside
Documents
8AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 10 days
- Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 20 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (7)
See All 7 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS