This Solicitation opportunity from New Hampshire was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Poverty Lane Isolation Valve Building Project

Closed
2025-RFx-039State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the furnishing and installation of an isolation valve building measuring approximately 9 feet 4 inches by 17 feet 4 inches to manage water flow to the Farnum Hill Water Storage Tank in New Hampshire. This building will be constructed on a reinforced concrete foundation with frost walls and a slab on grade, featuring 2x6 wood stud walls, 2x8 wood rafters, fiberglass insulation, plywood sheathing, red cedar clapboard siding, and a standing seam metal roof. It will include two insulated steel doors and be outfitted with interior and exterior LED lighting, wall heaters, a dehumidifier, ventilation fan, and louvers. The mechanical equipment installed will comprise a butterfly valve, flow meter with transmitter, hypochlorite feeding system, chlorine controller and analyzer, pressure transmitter, telemetry panel, as well as a power and control panel equipped with a PLC controller. Electrical work includes new primary and secondary electrical service installations, conduits, a meter box, and communication systems. Site work will connect the building to the existing water system, including water main and gate valve installations, copper sampling service, driveway and paved apron construction, grading, and landscaping. The procurement is managed by the City of Lebanon's Public Works - Engineering office, with the project solicitation open until early April 2026. The contract is governed by detailed conditions and assurance provisions, including performance, payment, and bid bonds, which guarantee the contractor’s compliance with payment to subcontractors, faithful performance of work, and commitment upon bid acceptance. These bonds and the comprehensive general conditions document outline the legal framework, roles, responsibilities, and administrative requirements necessary for project execution in accordance with city codes and New Hampshire statutes.

General Info

Furnish and install isolation valve building with mechanical, electrical, site work for water system.

Documents

8
PDF, High priority: read this first2 pages · bid-bond
High
PDF, High priority: read this first31 pages · general-conditions
High
PDF, High priority: read this firstbidding-plans
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this first3 pages · payment-bond
High
PDF, Low priority3 pages · performance-bond
Low
PDF, Low priority2 pages · contract-document
Low

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 10 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Hampshire → Public Works - Engineering
Contacts1 person available
OfficeLebanon, NH, 03766, USA

Interested Companies (7)

Green Mountain Electric SupplyJamestown, New York
James Lamontagne LandscapeNorwich, VT
Kelley BrothersSyracuse, New York

See All 7 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The project consists of furnishing and installing a 9'-4" x 17'-4" isolation valve building to control the flow of water to the Farnum Hill Water Storage Tank. The isolation valve building will be mounted on a cast-in-place reinforced concrete foundation consisting of frost walls and a slab on grade. Equipment will include a butterfly valve, a flow meter and transmitter, hypochlorite feeding system, chlorine controller, chlorine analyzer, pressure transmitter, telemetry panel, and a power and control panel with a PLC controller. The building will be 2" x 6" wood stud construction, 2" x 8" wood rafters, fiberglass batt insulation, plywood sheathing, red cedar clapboard siding, standing seam metal roof, pine fascia and soffits, and two 36" insulated steel doors with hardware. The isolation valve building will be supplied with two wall mounted heaters, a dehumidifier, ventilation fan and louver, and interior and exterior LED lights. Additional work includes a primary electric service and transformer, secondary underground electrical service, conduit, and meter box, and communication service and conduit. Site work including interconnections to the existing system, water main, gate valves, copper sampling service, driveway, paved apron, grading, and landscaping.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS