Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Indiana was posted on January 31, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion and Sediment Control Implementation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract titled Erosion and Sediment Control Implementation requires the installation and maintenance of temporary erosion control measures including silt fences and inlet protection systems to ensure compliance with environmental regulations during road or infrastructure repair activities. Work must be performed in accordance with applicable state and local environmental standards to prevent sediment runoff and protect adjacent waterways, with all measures remaining in place for the duration of the repair work and properly removed upon project completion. This subcontract opportunity is posted by Allen County in Indiana with a response deadline of February 7, 2025, and falls under NAICS code 238990 for other heavy and civil engineering construction specialty trades. Interested parties must submit proposals by the deadline to be considered, and all work is expected to occur at unspecified locations within Allen County. The contract does not specify a set-aside status, and all technical and compliance requirements must be met without exceptions to ensure regulatory adherence and environmental protection during construction activities.

General Info

Install and maintain erosion controls per regulations during Allen County infrastructure repairs through February 7, 2025.

Place of Performance

IN, USA

Set-Aside

NONE

Documents

This scope was carved out of 66.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Eagle River Bid Results

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIndiana → Allen County
ContactsNo contacts available
OfficeN/A
Organization / AgencyIndiana → Allen County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install and maintain temporary erosion control measures such as silt fences and inlet protection to comply with environmental regulations during repair work.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS