Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Erosion and Sediment Control Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the installation of erosion and sediment control measures including silt fences, wattles, and other best management practices to manage runoff resulting from temporary surface disturbances. The work is scoped to mitigate soil erosion and prevent sediment from entering waterways during active construction or earth-moving activities, ensuring compliance with environmental protection standards. All installations must be performed in accordance with regulatory guidelines applicable to land disturbance sites. The contract is classified as a subcontract under NAICS code 562910 for remediation and other waste management services, and is issued by Mariposa County in California with a place of performance at zip code 95338. The solicitation was posted on June 26, 2026, and the work is tied to a specific project identified through the CEQA Net system, indicating it relates to a state or locally regulated environmental planning initiative. No set-aside provisions are specified, and all details regarding point of contact or agency organizational structure are omitted, requiring potential bidders to reference the provided UI link for further project specifics.

General Info

Install erosion controls like silt fences and wattles per environmental regulations in Mariposa County, CA.

Agency

California → Mariposa County

NAICS

562910 - Remediation ServicesView NAICS

Place of Performance

CA, 95338

Set-Aside

NONE

Documents

This scope was carved out of PLAN-DIS-2026-00077.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Administrative Use Permit Application No. PLAN-DIS-2026-00077, Mt. Ophir Exploratory Drilling Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mariposa County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Mariposa County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install silt fences, wattles, and other BMPs to control runoff from temporary surface disturbances.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
SLED
Remediation of Sarah Jane Sherman Park Splash Pad and Wading Pool
Solicitation # Re-Bid 26-17
The City of Chicopee, Massachusetts, is soliciting bids for the remediation of the Sarah Jane Sherman Park splash pad and former wading pool to facilitate the construction of a new splash pad. The scope of work includes the environmental clean-up and removal of concrete and soil contaminated with Polychlorinated Biphenyls, as well as the removal of asphalt, drainage structures, and water piping. The project requires adherence to the Release Abatement Measure RAM Plan, the Massachusetts Contingency Plan, the Toxic Substances Control Act, and various state and federal hazardous waste regulations. Final site restoration involves excavating contaminated areas and backfilling with clean soil to proposed subgrade elevations. Bids are due by September 30, 2026, at 11:00 AM, and must be submitted in a sealed envelope to the Chicopee Purchasing Department. The contract will be awarded to the lowest responsive and responsible bidder who demonstrates sufficient experience with three comparable projects from the last five years and possesses the necessary capital to complete the work. Key requirements include a five percent bid bond, a one hundred percent performance bond, and strict compliance with MBE and WBE participation goals, which are a prerequisite for the award. Additionally, the contractor must comply with Davis-Bacon and Massachusetts State Prevailing Wage Rates, OSHA safety standards, and Build America, Buy America Act requirements for federally funded infrastructure.
City of Chicopee

POSTED

about 17 hours ago

DEADLINE

in 13 days
View Details
NAICS: 562910
New
Federal
B330 Mold Remediation
Solicitation # W50S9B26Q0022
Solicitation W50S9B26Q0022 is a request for quotation for professional mold remediation and optional restoration services at Building 330, Joint Base Langley-Eustis, Langley AFB, Virginia. This total small business set-aside project, with an estimated magnitude between $25,000 and $100,000, is divided into two primary components. The base bid consists of mold remediation in a 485 square foot break room and monitoring for an adjacent 580 square foot office, involving negative pressure containment, decontamination, and disposal of contaminated materials. An optional second line item covers the installation of mold-tough drywall, rock wool sound insulation, and specific USG ceiling tiles. The performance period is 45 days from the notice to proceed, and the contractor must provide a minimum one-year warranty for installation work. The procurement process includes a mandatory site visit on September 15, 2026, requiring advance registration and security vetting via JBLE Form 1 for base access. Quotes are due by September 21, 2026, and must include a technical narrative limited to 10 pages, a list of comparable projects from the last three years, and a completed price schedule. Evaluation will be based on the most advantageous offer considering price and other factors. The contract is subject to Construction Wage Rate Requirements and requires the use of the Wide Area WorkFlow system for invoicing. Final acceptance is contingent upon a final report and certification of mold remediation, with the government providing third-party air clearance testing.
W7N5 Uspfo Activity Vaang 192

POSTED

about 18 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS