Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Massachusetts was posted on July 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Erosion and Sediment Control Services

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, installation of new slide gates and modifications to existing sluice gates, and improvements to instrumentation, electrical systems, and motor control center components. Additionally, the project encompasses the installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The project has an estimated total cost between $18.5 million and $19.5 million, with a bid opening date of December 2, 2026. This solicitation is designated as a Small Business set-aside, covering SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services including coating and lining, concrete rehabilitation, welding, electrical and instrumentation, and crane services. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 6 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract calls for the implementation of both temporary and permanent erosion and sediment control measures to protect the environment during and after construction activities at Gliniewicz Way in Abington, Massachusetts, with a zip code of 02351. Included among the required practices are silt fencing, mulching, and ground stabilization techniques to minimize soil displacement and prevent sediment from entering nearby waterways or sensitive areas. The work must be conducted in accordance with applicable environmental standards and is intended to ensure compliance with regulatory requirements throughout the project lifecycle. This is a subcontract opportunity under the NAICS code 238990, listed as part of the ABGTN - Town of Abington’s procurement efforts in Massachusetts. The solicitation was posted on July 21, 2026, and bids are due by August 20, 2026, at 3:00 PM Eastern Time. The contract does not specify a set-aside designation, and while no point of contact is provided, interested parties can access further details through the official Commbuys portal using the given link. All performance must occur at the designated location in Abington, and contractors are expected to deliver reliable, durable control systems that remain effective beyond construction completion.

General Info

Implement erosion and sediment controls at Gliniewicz Way, Abington, MA, per environmental standards by August 20, 2026.

Place of Performance

Gliniewicz Way Abington, MA, 02351, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1472-ABGTN-ABGTN-131558.

The full solicitation package (31 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Stormwater BMP

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • AMC-0166 CRW ASR Public AnnouncementOpen now, due in 32 days
  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 5 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → ABGTN - Town of Abington
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Implementation of temporary and permanent erosion control measures during and after construction, including silt fencing, mulching, and stabilization.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS