Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Escalon-Bellota Road Bridge Replacement Project over Littlejohns Creek

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Escalon-Bellota Road Bridge Replacement Project, located at Littlejohns Creek in San Joaquin County, California, involves the replacement of an existing bridge with a wider, two-span, cast-in-place pre-stressed concrete slab bridge. Under the leadership of project proponent Robelyne Patricio of the San Joaquin County Department of Public Works, the scope of work includes clearing vegetation within the project footprint, constructing a temporary detour bridge, and implementing a water diversion system. Upon completion of the new bridge, the temporary structures will be removed and the detour area will be restored to its pre-construction conditions. The project is governed by a Streambed Alteration Agreement (EPIMS Notification Number SJN-66366-R2) executed by the California Department of Fish and Wildlife pursuant to section 1602 of the Fish and Game Code. A Notice of Determination issued on July 27, 2026, confirms that the project will not have a significant environmental effect within the agency's jurisdiction, provided that specific mitigation measures are followed. The project is classified under NAICS code 237310 for highway, street, and bridge construction.

General Info

San Joaquin County to replace Escalon-Bellota Road Bridge with wider concrete structure, ensuring environmental protection and traffic continuity.

Agency

California → San Joaquin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

SJN-66366-R2 Notice of Determination for Escalon-Bellota Road Bridge Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Hailey DonaldsonEnvironmental Scientist
Robelyne PatricioProject Proponent

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number SJN-66366-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Robelyne Patricio of San Joaquin County. The project includes the replacement of the existing Escalon-Bellota Bridge over Littlejohn’s Creek with a wider, two-span, cast-in-place pre-stressed concrete slab bridge. Prior to existing bridge removal, vegetation within the Project footprint will be cleared. A temporary detour bridge will be constructed adjacent to the existing bridge, and a water diversion system will be implemented. Once the new bridge has been constructed, the temporary detour bridge and water diversion system will be removed, and the detour area will be restored to pre-construction conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 18 hours ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS