Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on February 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Everglades National Park, Flamingo Marina Bulkhead Rehabilitation Monroe County, Florida

Closed
W912EP25Z0015Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 14 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 14 hours ago

DEADLINE

in about 16 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 14 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 19 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Homestead, FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts

Full Description

Show more
This is announcement constitutes a Source Sought Synopsis. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR BIDS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Respondents will not be notified of the results of the evaluation. The Jacksonville District of the U.S. Army Corps of Engineers is seeking interest from prospective bidders for a potential fiscal year (FY) 2025 award of a contract for this large-scale construction project. The National Park Service (NPS) has a requirement to provide cliff stabilization at Flamingo, National Park Service (NPS) Rehabilitate Marina Bulkheads. The purpose of this sources sought is to gauge interest, capabilities, and qualifications of contractors that have construction experience in completing similar projects. The scope of the contract will include but is not limited to bulkheads replacement and cantilevered sheet pile placement. The proposed project will be a Firm Fixed Price (FFP) contract. The Jacksonville District anticipates the issuance of a Request for Proposal (RFP). No reimbursement will be made for any costs associated with providing information in response to this sources sought or any follow-up information requested. DESCRIPTION OF WORK: The project work includes the removal of the existing concrete cap of the bulkhead walls, installation of new steel sheet pile bulkhead walls with cast-in-place concrete cap and precast concrete wall panel cap, site grading, and mechanical/plumbing/electrical equipment replacements and additions, and storm water outfall pipe extensions. The work also includes the removal and replacement of the asphalt/concrete pavement, timber guide and mooring piles, floating docks and aluminum ramps (where indicated on the plans), and modification of the fixed docks. The overall project site components encompass work to done within and around the four marina basins (Whitewater Bay, Florida Bay, Visitor Center Bay, and Maintenance Marina Bay) located at the Flamingo Marina in the Everglades National Park. Shallow draft barges or similar is authorized, with approval by the Government, for use so long as dredging of the basins is not required, at no additional cost to the Government. Specific project components include the following items and incidental related work: The new sheet pile bulkhead wall systems are comprised of a total of approximately 3,900 linear feet. The installation of the sheet pile walls is offset 22 inches from the existing bulkhead walls for Whitewater Bay, Florida Bay, and Maintenance Marina Bay; and offset 22.5 inches from the existing bulkhead walls for Visitor Center Bay. The offset dimension is measured from the exterior face of the existing soldier piles to the centerline of the sheet piles. Flowable fill will be placed between the two wall systems. The precast concrete wall panel cap will overhang the sheet pile walls and tied into cast-in-place concrete cap, resulting in both wall systems being encompassed. The placement of the wall systems must not extend through the canal plug between Whitewater Bay and Florida Bay, and the structural canopy in Maintenance Marina Bay. The floating docks and aluminum ramps affected by the placement of the new wall systems (indicated on the plans) will be removed, stored, and reinstalled in approximately the same location. The affected docks will also include the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. Areas that involve work for the floating and fixed docks are located in Whitewater Bay and Florida Bay. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. The mechanical/plumbing/electrical equipment replacements and additions for Whitewater Bay, Florida Bay, and Maintenance Marina Bay will include the removal and replacement of utility pedestals, boat off-loading sewage pumps, fuel dispensers, electrical (circuit breaker) panels, plumbing and wiring/conduits for the equipment, sewage shore ties, and equipment housekeeping pads. The mechanical/plumbing/electrical equipment replacements and additions will also include the removal of the makeshift water stations on the east side of the Marina Store and the installation of a packaged utility wastewater pumping station (grinder pump) at the south wall of the Maintenance Marina Bay. ORDER OF WORK: The work for each of the bay/basin must be completed in the following order: (1) Whitewater Bay (STA 1+00 to STA 7+29.37) and Florida Bay (STA 7+67.42 to STA 11+37.78), (2) Whitewater Bay (STA 7+29.37 to STA 13+75.80), (3) Florida Bay (STA 1+00 to STA 7+67.42), (4) Visitor Center Bay, and (5) Maintenance Marina Bay. The first stage of work of the project must include all features of work indicated in the plans for Whitewater Bay from Station 1+00 to Station 7+29.37 and Florida Bay from Station 7+67.42 to Station 11+36.49. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, and flowable fill. The placement of the wall systems must not extend through the canal plug between Whitewater Bay and Florida Bay. The work must also include the removal and replacement of the associated asphalt sidewalks and the mechanical/plumbing/electrical work. The floating docks must be removed, stored, and reinstalled in approximately the same location with the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The second stage of work of the project (Option B) must include all features of work indicated in the plans for Whitewater Bay from Station 7+29.37 to Station 13+75.80. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, flowable fill, and extension of the outfall pipe. The work must also include the removal and replacement of the associated asphalt sidewalks and the mechanical/plumbing/electrical work. The floating docks must be removed, stored, and reinstalled in approximately the same location with the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The third stage of work for the project (Option C) must include all features of work indicated in the plans for Florida Bay from Station 1+00 to Station 7+67.42. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, flowable fill, and extension of the outfall pipe. The work must also include the removal and replacement of the associated asphalt sidewalks and the mechanical/plumbing/electrical work. The floating docks must be removed, stored, and reinstalled in approximately the same location with the removal and replacement of the timber guide and mooring piles. The fixed docks will remain in place with only the affected portions to be removed, modified, and reinstalled. The replacement of all the floating docks (indicated on the plans) must be replaced with aluminum floating docks and are identified as Option A of the project. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The fourth stage of work of the project (Option D) must include all features of work indicated in the plans for Visitor Center Bay from Station 1+00 to Station 6+86.31. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, flowable fill, and extension of the outfall pipe. The work must also include the removal and replacement of the concrete sidewalk near the Visitor Center building. This stage of work must be completed and accepted by the Government prior to continuing to the next stage of work. The fifth stage of work of the project (Option E) must include all features of work indicatedin the plans for Maintenance Marina Bay from Station 1+00 to Station 10+63.10. The work must include the removal of the existing concrete caps and installation of the sheet pile wall, precast concrete wall panel cap, cast-in-place concrete cap, and flowable fill. The placement of the wall systems must not extend through the structural canopy in Maintenance Marina Bay. The work must also include the removal and replacement of the associated asphalt sidewalks and the mechanical/plumbing/electrical work. The floating docks must be removed, stored, and reinstalled in approximately the same location. ROUGH ORDER OF MAGNITUDE: $25,000,000 to $50,000,000 PRODUCT SERVICE CODE: Z1PA - MAINTENANCE OF RECREATION FACILITIES (NON-BUILDING) NAICS CODE: The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990 - Other Heavy and Civil Engineering Construction. SMALL BUSINESS SIZE STANDARD: $45,000,000 SUBMISSION REQUIREMENTS: Responses to this Sources Sought shall be limited to 5 pages and shall include the following information: Company/Contractor name, address, point of contact, phone number and e-mail address. Company's interest in bidding on the subject requirement when issued. Company's capability to perform a contract of this magnitude and complexity (include company's capability to execute comparable work performed within the past 10 years). Company should provide at least 3 examples which, at a minimum, include the following: Brief description of the project Customer name Customer satisfaction Timeliness of performance Dollar value of the completed projects Offeror shall identify their Small Business classification and Small Business Size: Small Business Small Disadvantage Business 8(a) Small Business HUBZone SDVOSB WOSB If significant subcontracting or teaming is anticipated in order to deliver technical capability, firms should address the structure of such arrangement include Joint Venture information, if applicable - existing and potential. Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from the bonding company. NOTES: DO NOT SUBMIT A RESPONSE TO THIS SOURCES SOUGHT IF YOU DO NOT INTEND TO BID ON THIS PROJECT. DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA. SUBMISSION INSTRUCTIONS: Interested parties who consider themselves qualified to perform the work associated with the subject requirement, are invited to submit a response to this Sources Sought Notice no later than March 4, 2025, at 2:00 PM, EDT. All responses under this Sources Sought Notice shall be sent to Ireishal Adams at Ireishal.C.Adams@usace.army.mil and I'sis Hill at Isis.S.Hill7@usace.army.mil. Prior Government contract work is not required for submitting a response under this sources sought synopsis. You must be registered in the System for Award Management (SAM), in order to be eligible to receive an award from any Government solicitation. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
Solicitation # W912EP26BA019
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work involves substantial manipulation of new and existing stones to achieve required interlocking and the execution of concrete repairs. All mobilization and construction activities must be water-based using marine construction methods and equipment, as land-based access to the project site is strictly prohibited. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. Critical environmental and safety requirements include a mandatory pre-construction benthic community survey and the relocation of corals by Florida Fish and Wildlife Conservation Commission qualified contractors prior to the start of jetty work. The project adheres to EM 385-1-1 safety standards and requires the use of Coast Guard-certified equipment. Contractual terms include liquidated damages of $2,818 per calendar day of delay and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. This unrestricted procurement falls under NAICS code 237990, and all eligible offerors must be registered in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS