This Solicitation opportunity from Department Of Defense was posted on October 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida

Closed
W912EP26BA019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 8 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated value between $1,000,000 and $5,000,000. The scope of work involves substantial stone manipulation to achieve required interlocking and concrete repairs to the jetty structure. All construction must be water-based using marine methods and Coast Guard-certified equipment, as land-based access to the site is prohibited. Environmental compliance is a critical component, requiring a pre-construction benthic community survey and the relocation of corals by qualified personnel prior to the start of jetty work. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. The procurement is unrestricted under NAICS code 237990, with a small business size standard of $45 million. Bidders must be registered in the System for Award Management and submit their proposals in a narrative PDF format via the PIEE Solicitation Module. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the establishment of a formal partnering session within 35 days of award. Quality control will be managed through a three-phase process, with final acceptance of stone work verified by surveys.

General Info

US Army Corps of Engineers seeks bids for Palm Beach Harbor jetty rehabilitation.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Palm Beach Harbor, FL, FL, 33480

Set-Aside

NONE

Documents

6

W912EP26BA019 - Palm Beach Harbor South Jetty Rehabilitation

PDF, High priority: read this first89 pages · ifb
High

W912EP26BA019 - Palm Beach Harbor South Jetty Rehabilitation Plans

PDF, High priority: read this first12 pages · specifications
High

W912EP26BA019 - Palm Beach Harbor South Jetty Rehabilitation Specifications

PDF, High priority: read this first278 pages · specifications
High

Contract W912EP26BA019 - Pre-Bid Site Visit Attendee List

PDF, Low priorityattendee-list
Low

B_08_K3DG_24188_PBHR_NSJRV_SVSTIN_5ft_Sort.xyz

OCTET-STREAM

C.04.01+Bid+Abstract_26BA019+PBH+Jetty+Repair.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Oct 23, 2026 to Oct 26, 2026.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts1 person available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
The work consists of rehabilitation of the South Jetty at Palm Beach Harbor. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking within the tolerances provided. Mobilization of equipment and the construction necessary to repair the jetty must be water-based and require the use of marine construction methods and equipment. Work on top of the jetty will be permitted. Land-based access to the project site will not be permitted. Rehabilitation also consists of concrete repairs to the South Jetty at Palm Beach Harbor as indicated on the drawings. Prior to work on the jetty, conduct a pre-construction benthic community survey on the jetty structure and any adjacent submerged areas that may be impacted by the Contractors operations. Complete any coral relocations required as a result of the benthic survey prior to jetty work. Field personnel conducting coral survey and transplantation activities must either be qualified relocation contractors by the Florida Fish and Wildlife Conservation Commission or must provide documentation of having successfully conducted relocation of corals in Florida. The project will have an estimated period of performance of 330 calendar days after receipt of the Notice to Proceed (NTP). The stated time is inclusive of 60 calendar days to commence work and will be divided into base work and three options as follows: The Estimated Magnitude of construction is between $1,000,000.00 and $5,000,000.00The Invitation for Bid (IFB) will be issued on or about September 23, 2026 and bids will be due on or about October 23, 2026.THIS ACQUISITION REQUIRES THE USE OF COAST GUARD-CERTIFIED EQUIPMENT, The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction. The Small Business Size Standard for this project is $45.0 million. Solicitation will be issued in electronic format only and will be posted on the SAM.gov website at https://sam.gov/. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the Sam.gov website at https://sam.gov/. If you are not registered, the Government is not responsible with providing you with notification of any amendments to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call +1 (555) 000-0000 or visit the SAM website at https://www.sam.gov/.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 22 days
View Details
NAICS: 237990
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
Other Heavy and Civil Engineering Construction

POSTED

8 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS