EVSE Project at CAL TRANS District 10 - Stockton Maintenance Facility

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project at the CALTRANS District 10 Stockton Maintenance Facility focuses on preparing the site for future Electric Vehicle Supply Equipment installation by establishing the necessary enabling infrastructure. This includes the installation of buried conduits, fixed bollards, wheel stops, and new electrical wiring to support a future dual port, pedestal-mounted Electric Vehicle Charging Station, though the actual charger units are not part of this contract. Two parking stalls will be designated for electric vehicle use through restriping, stenciling, and clear signage to ensure proper identification and compliance. Electrical power will be sourced from an existing on-site supply, eliminating the need for new utility connections. The work involves pavement saw cutting, trenching, backfilling, and full restoration of the lot surface to its original condition. All activities must adhere to applicable laws and regulations, including proper waste disposal practices, and the project is being managed by Caltrans District 3 out of Marysville/Sacramento with primary point of contact Peter Hendrix, P.E.

General Info

Install conduits, bollards, wiring, and restripe stalls for future EV chargers using existing power, restore pavement.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

Place of Performance

3330 Ad Art Road, Stockton, CA, 92515

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Peter HendrixZEVI Deputy Division Chief

Full Description

Show more
The project consists of installing the Electric Vehicle Supply Equipment (EVSE) infrastructure for fleet use. This initiative is designed to create a fully operational system that will eventually support one dual port, pedestal-mounted Electric Vehicle Charging Station (EVCS). Note that the installation of the EVCS itself is outside this current scope and may be handled by others at a later date. As part of this project, two parking stalls will be specially stenciled and restriped. Clear signage will be installed to indicate that these stalls are reserved for electric vehicle use, ensuring easy identification and proper use The project involves the installation of buried conduits, fixed bollards, wheel stops, and new electrical equipment, including all necessary wiring, to deliver a complete and functional system. Electrical power for the EVSE will be drawn from an existing source already available at the site. All aspects of the work, including waste disposal, will be conducted in strict compliance with all applicable laws, regulations, and ordinances. The work will involve pavement saw cutting, trenching, backfilling, and restoring the affected lot surface to its original condition once the installation is complete.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 19 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety is soliciting bids for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. This turnkey project involves milling all existing asphalt surfaces to a minimum depth of 2.5 inches, repairing soft areas and potholes with base compaction to 98 percent, and installing new asphalt to a minimum finished depth of 2.5 inches. The scope also includes the removal, painting, and resetting of wheel stops, as well as full restriping of the lot, including fire lanes and handicap markings. All work must be performed by qualified craft persons with at least three years of experience and must comply with state and local codes. Electronic responses are due by November 13, 2026, at 5:00 P.M. CT via email or the DPS Online Bid Room. Bids will be evaluated based on responsiveness and past performance, with the award going to the responsible bidder representing the best value. Required submission volumes include contract forms, an information bid section with key personnel resumes, a subcontracting plan for contracts over 100,000 dollars, and a mandatory pricing schedule. Performance and payment bonds are required for contracts exceeding 100,000 dollars and 25,000 dollars, respectively. The contractor must provide a work phasing plan to ensure safe building access, including off-hours work, and adhere to prevailing wage rates per Texas Government Code Chapter 2258.
Department of Public Safety

POSTED

about 22 hours ago

DEADLINE

in 6 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS