The City of Lancaster, Ohio, is soliciting bids for the Ewing Run Sewer Repair at McClain Blvd, a project focused on realigning and stabilizing the channel of Ewing Run, relining an existing sanitary sewer, and reconstructing a sanitary manhole to grade southeast of East Allen Street and McClain Boulevard. The engineer's estimate for the construction cost is $252,527.00. The project is scheduled for substantial completion by May 31, 2027, with final completion due by June 30, 2027. There is no set-aside status specified for this solicitation.
The contract is a general contract governed by Modified Standard General Conditions of Construction (EJCDC C-700) and requires the contractor to provide performance and payment bonds equal to the contract price. Bidders will be evaluated based on a lowest and best criteria, considering factors such as cost, budget alignment, and compliance with specifications and quality standards. Key requirements include adherence to Ohio Revised Code Chapter 4115 for prevailing wages, compliance with the Americans With Disabilities Act (ADA) for all sidewalks and ramps, and a Build America, Buy America certification. Payment is processed via an Application for Payment submitted to the Engineer, with partial labor payments capped at 96 percent of the invoiced amount.
General Info
Lancaster, Ohio seeks bids for Ewing Run sewer repair and channel stabilization.
HighAI Summary for City of Lancaster - Ewing Run Sewer Repair at McClain Blvd Project Notice: Notice to Bidders for the Ewing Run Sewer Repair at McClain Blvd Project in Lancaster, Ohio. The project involves realignment and stabilization of Ewing Run, relining a storm sewer, and reconstructing a sanitary manhole. Bids are due by 11:00 a.m. on December 18, 2026, via Bid Express. The engineer's estimated cost is $252,527.00, with a substantial completion date of May 31, 2027.
PDF
PDF, High priority: read this first15 pages · itb
HighAI Summary for City of Lancaster, Ohio - Instructions to Bidders: Instructions to Bidders for the Ewing Run Sewer Repair project for the City of Lancaster, Ohio. The document outlines bidder requirements, including the bidder's pledge, site examination protocols, bid preparation, method of award, and compliance with prevailing wages and local laws.
PDF
PDF, High priority: read this first7 pages · rfb
HighAI Summary for City of Lancaster, Ohio - Lawrence Street Pump Station Bid Form: A formal bid submission form for the Lawrence Street Pump Station project in Lancaster, Ohio. The document outlines the requirements for contractor submission, including bid pricing, alternates, signing instructions, and mandatory bidder certifications regarding site inspection and adherence to contract documents.
PDF
PDF, High priority: read this first13 pages · past-performance
HighAI Summary for Contractor's Qualification Statement (CQS) - City of Lancaster: A Contractor's Qualification Statement (CQS) form for the City of Lancaster, Ohio. The document requires contractors to provide detailed information regarding their organizational structure, licensing, financing, claims history, and a record of past performance and experience on projects of comparable size and complexity.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for EJCDC C-700 Modified Standard General Conditions of the Construction Contract: This document contains the Modified Standard General Conditions of the Construction Contract (EJCDC C-700, 2018 edition). It establishes the legal and administrative framework for a construction project, covering definitions, contractor and owner responsibilities, bonds, insurance, change orders, claims, and tests/inspections.
PDF
PDF, High priority: read this first11 pages · specifications
HighAI Summary for Ewing Run Sewer Repair at McClain Blvd - Sheet Set: Construction drawings and technical specifications for the Ewing Run Sewer Repair project for the City of Lancaster, Ohio. The document includes schematic plans, typical cross sections for riffles and pools, root wad and shrub planting details, and comprehensive general notes regarding OSHA safety, drainage requirements, and ODOT construction standards.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ewing Run Sewer Repair at McClain Blvd - Wage Decision: This document contains the General Wage Decision and prevailing wage requirements for the Ewing Run Sewer Repair at McClain Blvd project. It outlines Ohio's prevailing wage laws, thresholds for public improvements, penalties for violations, and detailed contractor responsibilities regarding payroll records, apprentice ratios, and certified payroll submission requirements.
PDF
PDF, High priority: read this first90 pages · specifications
HighAI Summary for Modified Standard General Conditions of the Construction Contract (EJCDC C700): A modified version of the EJCDC C700 Standard General Conditions of the Construction Contract (Copyright 2018). This document establishes the legal and operational framework for a construction project, covering definitions, performance bonds, insurance, site conditions, and contractor responsibilities.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Threshold Levels 2026: Issued by the Ohio Department of Commerce, this document establishes the prevailing wage threshold levels effective January 1, 2026. It defines the monetary thresholds for 'new' construction and 'reconstruction/alteration' for both general building construction and road/bridge construction to determine when prevailing wage rates must be applied to public improvements.
PDF
PDF, High priority: read this first8 pages · contract-document
HighAI Summary for Owner-Contractor Agreement - Ewing Run Sewer Repair at McClain Blvd: An Owner-Contractor Agreement between the City of Lancaster, Ohio, and a contractor for the Ewing Run Sewer Repair at McClain Blvd project. The document defines the contract documents, including EJCDC C-700 General Conditions, federal funding requirements (EPA and Uniform Guidance), and the role of the Design Professional (Verdantas LLC).
PDF
PDF, High priority: read this first29 pages · specifications
HighAI Summary for Special Project Conditions - Ewing Run Channel Realignment: Special Project Conditions dated March 10, 2026, for the realignment and stabilization of the Ewing Run channel, sanitary sewer relining, and manhole reconstruction. Includes critical project schedules with a substantial completion date of May 31, 2027, and detailed requirements for contractor cooperation with utilities and liability for utility protection.
PDF
PDF, Low prioritycertification
LowAI Summary for City of Lancaster Auditor Certificate - Ewing Run Sewer Repair: A financial certification document from the City of Lancaster, Ohio, verifying that funds have been appropriated and are available in the Wastewater Utility Reserve for the Ewing Run Sewer Repair at McClain Blvd project.
PDF
PDF, Low priority6 pages · bond-form
LowAI Summary for City of Lancaster, Ohio - Bid Guaranty and Contract Bond Forms: Standardized legal forms for the City of Lancaster, Ohio, providing templates for a combined Bid Guaranty and Contract Bond (Form BGCB1/BGCB2) and a standalone Contract Bond (Form CB1) in accordance with O.R.C. § 153.57 and § 153.571.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Contractor's Personal Property Tax Affidavit: A legal affidavit form used by contractors to declare their status regarding delinquent personal property taxes in Ohio counties, pursuant to O.R.C. § 5719.042.
PDF
PDF, Low priority1 page · other
LowAI Summary for Non-Collusion Affidavit: A legal affidavit for the State of Ohio requiring a contractor to swear that their bid is genuine, not collusive, and not made in the interest of any undisclosed party.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Non-Discrimination and Equal Employment Opportunity Affidavit: A legal affidavit required as part of a bid submission, certifying that the bidder does not discriminate against employees or applicants based on race, creed, color, sex, age, religion, handicap, familial status, or national origin, in accordance with Section 153.54 of the Ohio Revised Code.
PDF
PDF, Low prioritysupporting-document
LowAI Summary for Pre-Bid Substitution Form: A Pre-Bid Substitution Form (PSF) used by bidders to request the use of alternative brands or materials instead of the standards specified in the contract documents. It provides a template for listing the specification section, the specified brand, and the proposed substitution.
The project consists of realigning and stabilizing the channel of Ewing Run, the relining of an existing sewer and reconstruction of an sanitary manhole to grade south east of Allen Street and McClain Boulevard Engineer's Estimate is $252,527.00