Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The USDA-NRCS is seeking a contractor for the EWP Streambank Stabilization project in McDowell County, West Virginia, under the Emergency Watershed Protection Program. The project involves removing stream materials that compromise capacity and stabilizing areas that adversely impact structures. This is a total small business set-aside opportunity with a firm fixed price structure, and it is identified as a likely recompete of contract 12FPC326P0061, previously held by Smith Brothers Excavating with a value of 248,200 dollars. The selected contractor must provide all necessary supervision, labor, tools, equipment, and materials while adhering to all federal, state, and local safety and construction laws. Key project updates include the removal of Site 3 from the solicitation and a revised quantity of 171.0 cubic yards for gabions. Bids are due by August 11, 2026, at 2:00pm ET, and a site visit is scheduled for July 30, 2026, at 10:30am ET near the Route 52 bridge crossing Spice Creek.

General Info

USDA-NRCS seeks small business for streambank stabilization in McDowell County, West Virginia.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

WV, 24830, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

pre-forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Fpac Bus Cntr-Acq Division
Contacts1 person available
OfficeWASHINGTON, DC, 20250, USA
Office AddressWASHINGTON, DC, 20250, USA

Full Description

Show more
Predicted recompete opportunity based on federal award data.
Current Contract: 12FPC326P0061 Incumbent: SMITH BROTHERS EXCAVATING Contract Value: $248,200 Potential End Date: 2026-11-20T00:00:00.000Z Competition: COMPETED UNDER SAP Pricing: FIRM FIXED PRICE Classification: recompete-likely (Confidence: medium - 65/100)

Amendment: Quantity on Bid Schedule for Line Item 9: Gabions, has been changed to 171.0 CY due to an error in calculation. Updated maps and drawings have been attached.  Please adjust your bids accordingly.


******************************************************************************************


AMENDMENT:  Removal of Site 3 (War Creek) from solicitation.  Updated Construction Specs & Drawings uploaded.


Bids will now be due August 14, 2026 by 2:00pm ET.


****************************************************************************************


Update - Bids are now due 8-11-2026 by 2:00pm ET.


******************************************************************************************


UPDATED SITE VISIT INFORMATION..............


The Site Visit has been changed to Thursday, July 30, 2026 @10:30am ET.


***************************************************************************************************


The USDA-NRCS, under the Emergency Watershed Protection Program, will complete work to remove materials in the stream that are compromising the capacity of the streams and stabilize areas adversely impacting structures.


Additional details provided in attachments.


CONTRACTOR RESPONSIBILITIES:


1. Provide all supervision, labor, tools, equipment, transportation, and material necessary to perform the work.


2. Follow industry standards, all federal and state, and local construction, safety and labor laws.


3. Contractor is responsible for their equipment. The Government is not liable for damages or losses of equipment due to theft or               vandalism.


4. Remove all debris and excess materials from the site and dispose of them properly.


SITE VISIT.


Interested vendors can review the work site by attending the Site Visit on July 21, 2026, at 10:30am ET.


Site Visit Location: Paved parking lot near the Rt. 52 bridge that crosses Spice Creek.


GPS Coordinates:  37.4451661, -81.702033


Review of the work site is not mandatory, but highly recommended.


Site Visit POC: Joe Wickline at contact@example.gov, +1 (555) 000-0000.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS