Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Excavation and Earthwork

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
RFT Canyon Avenue (DR 15.1) Bank Stabilization Project
Solicitation # 10044924
The Canyon Avenue Bank Stabilization Project, managed by the Toronto and Region Conservation Authority, involves critical bank and channel restoration works at 35 Canyon Avenue, Toronto. The primary scope of work includes the construction of an armourstone retaining wall to replace failed gabion baskets, channel widening and realignment, and the placement of bedding material. Additional deliverables encompass erosion and sediment control measures, asphalt paving of damaged roads and trails, and extensive landscape restoration involving topsoil, coir mats, and the planting of hundreds of trees and shrubs. The project is supported by technical assessments, including a detailed design brief, an arborist report covering 797 surveyed trees, a soil characterization report for approximately 2600 cubic meters of excess soil, and a Stage 2 archaeological assessment which found no cultural resources in the area. This solicitation is a stipulated price contract based on the CCDC 2 2020 form and is exclusively open to bidders prequalified under Category A1 of RFPQ No. 10043326. The contract will be awarded to the lowest compliant bidder, with a response deadline of October 20, 2026. Key contractual requirements include the submission of a CCDC 220 Bid Bond, a Statement of Insurability, and a Consent of Surety form, with the successful contractor required to provide performance and labour and material payment bonds each equal to 50 percent of the contract price. The project is estimated at approximately 1.9 million dollars, with a maximum category value of 3 million dollars. Contractors must adhere to stringent standards, including O.Reg. 213/9 for traffic protection and Toronto Urban Forestry permits for tree protection.
Toronto and Region Conservation Authority

POSTED

about 20 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
IFB #2627-006 - Summerville High School Tennis Courts at Alston Middle School
Solicitation # 2627-006
Dorchester School District Two has issued Invitation for Bid IFB 2627-006 for the construction of six new tennis courts for Summerville High School, to be located on the Alston Middle School campus at 500 Bryan Street, Summerville, South Carolina. The project requires the contractor to provide all labor, materials, equipment, and warranties necessary for completion, including specific technical requirements for structural slabs and sports lighting poles. Bids must be submitted in a sealed package to Ashley Cash by October 27, 2026, at 2:00 PM. The award will be granted to a single, lowest responsible and responsive bidder. The pricing structure consists of a lump sum base bid that must include three specific allowances: 20,000 dollars for AHJ contingency, 30,000 dollars for unsuitable soils, and 10,000 dollars for landscaping. Bidders must provide a bid bond or certified check for at least five percent of the base bid and a performance bond guaranteeing workmanship for 24 months. Because the work occurs on an active school site, contractors must adhere to strict student safety and security policies. Performance is subject to liquidated damages of 200 dollars per day for delays in substantial completion and 100 dollars per day for delays in final completion. Compliance with the Davis Bacon Act, Buy America Act, and ADA-ABA accessibility guidelines is required.
Dorchester School District Two

POSTED

about 20 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract seeks a subcontractor to perform comprehensive excavation and earthwork services for the construction of playground and restroom foundations, involving site excavation, soil removal, backfilling, and grading. All work must include proper compaction of soils and responsible disposal of spoil material to meet engineering and safety standards. The scope is focused on preparing stable, level ground structures to support future facilities, requiring adherence to geotechnical specifications and environmental compliance during all phases of earthmoving operations. This subcontract is issued under NAICS code 237990 and is posted by the Capital Projects agency in Georgia, with a response deadline of May 21, 2026. The procurement does not specify a set-aside category, and while no point of contact or exact location details are provided, performance is expected within Georgia. Interested parties must respond by the deadline through the designated online portal to be considered for award.

General Info

Site excavation and earthwork for playground and restroom foundations, including soil removal and disposal.

Agency

Georgia → Capital ProjectsView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-37.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

(RFP) 26-37, Construction of N. Mt. Carmel Park Playground Site Improvements and New Restroom Building

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Capital Projects
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Capital Projects
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform site excavation, soil removal, backfilling, and grading for playground and restroom foundations. Includes compaction and spoil disposal.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS