Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Oregon was posted on August 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Excavation and Erosion Control

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This subcontract for Excavation and Erosion Control supports prime contractors on City of Beaverton public works projects under the Engineering division of Oregon Public Works. The scope of work includes site preparation, environmental protection, exploratory excavation, and the removal of existing water structures. Additionally, the contractor is responsible for implementing Erosion Control and Pollution Control Plans and performing trench backfilling using Class B materials to ensure all sites and trenches are delivered in compliance with project standards. The opportunity was posted on August 18, 2026, with a response deadline of September 8, 2026. Classified under NAICS code 238910, this contract focuses on delivering excavated sites and compliant erosion control measures to meet the specific requirements of the municipal agency.

General Info

Excavation and erosion control subcontract for City of Beaverton public works projects.

Place of Performance

OR, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-002.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wilson Dr & Ave Waterline Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Public Works - Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site preparation and environmental protection for prime contractors on City of Beaverton public works projects. Executes exploratory excavation, implements Erosion Control and Pollution Control Plans, performs trench backfilling using Class B backfill, and removes existing water structures. Delivers excavated sites, backfilled trenches, and compliant erosion control.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS