Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Washington was posted on April 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Excavation, Demolition & Site Grading

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 18 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the demolition of existing stormwater infrastructure, excavation for the placement of new vaults, and comprehensive site grading to accommodate upcoming installations and roadway improvements. All work is to be performed in alignment with municipal standards and construction specifications to ensure safe, functional, and durable outcomes that integrate seamlessly with planned infrastructure upgrades. The project requires skilled labor, proper equipment, and adherence to environmental and safety protocols during excavation and demolition phases. This subcontract is issued by the City of Bremerton in Washington and carries a NAICS code of 238910, classifying it under other heavy and civil engineering construction services. The solicitation was posted on April 15, 2025, with responses due by May 13, 2025. Bidders must meet all technical and compliance requirements outlined in the bid documents available via the city’s official procurement portal. Work is expected to occur at a designated location within Bremerton, though exact site details are not specified in the provided data. Contractors must be prepared to manage logistical challenges related to urban construction and coordinate with other ongoing municipal projects in the area.

General Info

Demolish stormwater infrastructure, excavate vaults, grade site per Bremerton municipal specs for roadway upgrades.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of 879.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Kitsap Lake Stormwater Treatment Retrofit

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Bremerton
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Demolition of existing stormwater infrastructure, excavation for vault placement, and site grading to support new installations and roadway work.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS