Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Exchange of up to 75,000 Acre-Feet of Santa Clara Valley Water District’s Central Valley Project Water Supplies with State Water Project Water Supplies

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Agreement SWP #26024 establishes a water supply exchange between the California Department of Water Resources (DWR) and the Santa Clara Valley Water District. Under this agreement, DWR will deliver up to 75,000 acre-feet of State Water Project (SWP) water from the Banks Pumping Plant to the district's turnouts in Reach 9 of the South Bay Aqueduct. In return, the U.S. Department of the Interior's Bureau of Reclamation will make an equivalent amount of Central Valley Project (CVP) water available to DWR at O'Neill Forebay, which DWR will then distribute to SWP service areas located south of that location. The exchange is authorized under the 2026-2027 Consolidated Place of Use Order, with State Water Resources Control Board approval effective from July 22, 2026, through July 21, 2027. The project is located in Santa Clara County and is classified as a forecast under NAICS code 221310. It has been granted environmental exemptions under CEQA Class 1 and California Water Code Section 1729, as the activity utilizes existing facilities and does not establish a new permanent water supply or support new development. The agreement was signed on August 31, 2026.

General Info

Water supply exchange of 75,000 acre-feet between SCVWD and California DWR (2026-2027).

Agency

California Water Resources, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts3 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
Patrick LuzuriagaSection Manager
Cindy KaoImported Water Unit Manager
Rain L. EmersonActing Area Manager

Full Description

Show more
[PROJECT TITLE CONTINUED]: (SWP #26024) Agreement SWP #26024 provides for an exchange of up to 75,000 acre-feet of Santa Clara Valley Water District’s (Santa Clara’s) Central Valley Project (CVP) water supplies with State Water Project (SWP) water supplies. The California Department of Water Resources (DWR) will deliver up to 75,000 acre-feet of SWP water supplies from Banks Pumping Plant to Santa Clara’s turnout(s) in Reach 9 of the South Bay Aqueduct. In exchange, the U.S. Department of the Interior’s Bureau of Reclamation (Reclamation) will make an equal amount of Santa Clara’s CVP water available to DWR at O’Neill Forebay. DWR will deliver the CVP water to SWP service areas south of O’Neill Forebay. This exchange is covered under the 2026-2027 Consolidated Place of Use Order, approved by the State Water Resources Control Board (SWRCB) on July 22, 2026. The SWRCB’s approval is effective July 22, 2026, through July 21, 2027.

Similar Contracts

Same NAICS industry code

NAICS: 221310
New
Federal
Utilities Privatization of the Water System at U.S. Army Garrison-Hawaii (USAG-HI), Island of Oahu
Solicitation # SP060026R0813
DLA Energy, in coordination with the United States Army, is soliciting proposals for the privatization of the water distribution utility system at U.S. Army Garrison-Hawaii, Island of Oahu. This unrestricted competitive action involves the transfer of ownership, operation, maintenance, and repair responsibilities to a private entity for a maximum term of 50 years. The selected contractor will be responsible for all labor, materials, equipment, and capital investments necessary to ensure continuous and reliable service, including environmental compliance and major system renovations. The process includes a contractor-proposed transition period, after which the system will be conveyed via a Bill of Sale, with real property interests provided as easements or rights of access. Award will be based on a best value determination, where non-price factors—specifically technical capability, past performance, and risk—are significantly more important than price. Technical evaluation focuses on service interruption and contingency planning, operations and maintenance, and system deficiency corrections. Offerors must submit a comprehensive proposal consisting of four volumes, including a technical proposal and a socioeconomic plan demonstrating a commitment to small business subcontracting. Due to the sensitive nature of the requirement, several solicitation documents are secured, requiring vendors to obtain special access through SAM.gov and the Joint Certification Program. Proposals are due by January 7, 2027.
DLA Energy

POSTED

about 10 hours ago

DEADLINE

in 2 months
View Details
NAICS: 221310
New
Federal
Water system Maintenance
Solicitation # 36C26027Q0105
The Department of Veterans Affairs, through Network Contracting Office 20, is conducting market research via a Sources Sought Notice for water system maintenance at the Jonathan M. Wainwright VA Medical Center in Walla Walla, Washington. The anticipated contract structure consists of a base year and four one-year option periods, covering services from 2027 through 2031. The scope of work includes annual base and expanded inspections, tank inspection and cleaning, and cathodic protection inspections, alongside a time-and-material maintenance rider for both urgent and non-urgent repairs. Technical compliance is required across several standards, including NACE/AMPP SP0388 for cathodic protection, EPA 40 CFR Part 141 for water quality, and AWWA Manual M42 for water tower mixing. This opportunity is designated as a total Small Business Set Aside under NAICS code 221310. Qualified personnel must hold current Washington State licenses as required by RCW 18.104 and WAC 173-160. Safety compliance is critical, with strict adherence to 29 CFR 1910.146 for confined space entry and OSHA 29 CFR 1910 Subpart T for any diving operations. Administrative requirements include the submission of written condition assessments after inspections and detailed invoicing supported by separate material receipts. Interested parties must be registered in the System for Award Management and, if claiming SDVOSB or VOSB status, must be registered with the SBA VetCert Registry.
260-NETWORK Contract Office 20 (36C260)

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 221310
New
SLED
Turnkey Exchange Of Spent Granular Activated Carbon (Gac)
Solicitation # P-130000899
The City of San Buenaventura is soliciting proposals for a turnkey exchange of spent Granular Activated Carbon (GAC) in Ventura, California. The contract requires the supplier to provide 40,000 pounds of new 100% Virgin Coconut-Based 12x40 mesh size carbon per change-out, ensuring all materials meet AWWA B604 and ANSI/NSF 61 standards for drinking water. Services must occur at least once and no more than twice per year, with the initial service required within 10 business days of contract execution. The contractor is responsible for the offsite transport of spent GAC using a proper nonhazardous manifest and must maintain OSHA compliant Confined Space Entry Training Certification. Award decisions will be based on the best fit and value, evaluated through contractor capability (40%), reference evaluation (25%), cost of service (25%), and the quality and completeness of the proposal (10%). Proposals must be submitted by November 24, 2026, via both a sealed hard copy and a PDF electronic copy to the Purchasing Supervisor. Payment is processed within 30 days of receipt of an invoice, provided it is accompanied by a post job report including product specification and SDS sheets. The agreement is governed by the City's General Services Agreement, and while bid and performance bonds are not required, contractors must provide a Taxpayer Identification Number and adhere to specific insurance requirements.
City of San Buenaventura

POSTED

4 days ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS