This Government Contract opportunity from Department Of Defense was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Exploration Drilling & Rig Operation Support

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
SPR892_879: Phase 3 Drilling Wickiup
Solicitation # S-73000-00018072
Solicitation S-73000-00018072 is an invitation for bids from the Oregon Department of Transportation for Phase 3 drilling at Wickiup, located at US Route 97 Milepost 165.7. This joint research project with OSU and PSU involves a geotechnical investigation of diatomaceous soils to support foundation and settlement analyses. The scope of work requires the contractor to provide all labor, equipment, and materials for mud rotary drilling, standard penetration tests, and Shelby tube sampling. Key technical requirements include the use of drilling machines with hydraulic feed heads and automatic-trip hammers, while rope and cathead methods are strictly prohibited. All work must be performed at least 50 feet from railroad tracks and adhere to strict safety standards, including the use of ANSI Class 3 reflective vests and daily documented tailgate meetings. The contract will be awarded to the lowest responsive and responsible bidder possessing at least three years of experience. The drill crew must include an experienced helper and at least one journey-level operator licensed by the Oregon Water Resource Department as a Monitoring Well Constructor. Performance is scheduled for a window between November 18, 2026, and March 15, 2027, with a final completion date of November 17, 2027. Bidders must comply with federal Buy America and FHWA Form 1273 regulations, as well as state non-discrimination laws. Payment is processed via ACH within 30 days of invoice receipt, subject to a potential 5 percent retainage. Submissions must be made electronically through OregonBuys and include a bid cover sheet and three professional references.
Research

POSTED

about 19 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

This subcontract for Exploration Drilling and Rig Operation Support involves performing exploration drilling for prime contractors on USACE Mobile District projects throughout the Continental United States. The selected provider will be responsible for operating drilling rigs to conduct geotechnical sampling, mobilizing necessary equipment to various sites, and utilizing specialized drilling tooling. All personnel must adhere to the Performance Work Statement qualifications to ensure the successful delivery of completed boreholes, soil samples, and drilling logs. Managed by the Department of Defense under the W074 Endist Mobile agency, the contract falls under NAICS code 238910. The opportunity was posted on August 26, 2026, with a response deadline of September 10, 2026. Performance is centered around the 36702 zip code area, supporting critical geotechnical infrastructure needs for the USACE.

General Info

Subcontract for USACE Mobile District exploration drilling and geotechnical sampling across the US.

NAICS

238910 - Site Preparation Contractors

Place of Performance

AL, 36702

Set-Aside

NONE

Documents

This scope was carved out of W9127827RA005.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Geotechnical Drilling and Warehouse Services

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Mobile
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs exploration drilling for prime contractors on USACE Mobile District projects across the Continental U.S. Operates drilling rigs to perform geotechnical sampling and mobilizes drilling equipment to various sites. Requires exploration drill rigs and associated drilling tooling. Personnel must meet PWS qualifications. Delivers completed boreholes, soil samples, and drilling logs.

More opportunities from Department Of Defense → W074 Endist Mobile

Same awarding agency

NAICS: 237990
New
Federal
Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
Solicitation # W9127826BA003
Solicitation W9127826BA003 is a Firm-Fixed Price sealed bid for the maintenance dredging of the Pensacola Harbor Entrance Channel in Florida, issued by the U.S. Army Engineer District, Mobile. The project requires the removal of sand from Station 202+00 to 301+00 to a depth of 39 feet, with the dredged material to be placed along Perdido Key Beach. The contractor must provide all necessary plant, labor, and equipment, including hydraulic cutterhead pipeline, trailing suction hopper, or mechanical dredges with scows, and support vessels. The estimated project cost ranges from 25 million to 100 million dollars, with a performance period of 151 calendar days and a final completion deadline of April 1, 2027. The contract includes a base bid for mobilization and dredging, along with six optional bid items for channel wideners and advance maintenance. Award evaluation is based on the total price for the basic requirement plus all options, with a 10% price evaluation preference granted to certified HUBZone small business concerns. Bids must be submitted via the Procurement Integrated Enterprise Environment (PIEE) module by October 13, 2026. Key requirements include compliance with the Davis-Bacon Act, USACE Dredging Quality Management specifications, and FDEP environmental permits. Acceptance of work is based on before and after dredging surveys within a defined acceptance prism, with allowable overdepth paid up to 2 feet.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
Federal
Space Port of the Future Infrastructure (SPOTFi) Campus (AM01)
Solicitation # W9127826SC075
The Space Port of the Future Infrastructure (SPOTFi) Campus project is a Department of Defense initiative managed by the USACE to construct six facilities at Cape Canaveral Space Force Station, Florida. The scope includes one security forces station, two admin facilities, two storage warehouses, and one vehicle maintenance facility, with a total program affordability cap of 409 million dollars. The project utilizes a Progressive Design-Build (PDB) delivery model executed through an Other Transaction Agreement (OTA) authorized under 10 U.S.C. 2808a, meaning it is not subject to the Federal Acquisition Regulation, although specific FAR clauses for biobased product certification and construction inspection are referenced for compliance. The procurement process is qualifications-based and conducted in two steps, beginning with the submission of a white paper and followed by pitch presentations. Evaluation focuses on relevant experience with campus-style and secure facilities, expertise in progressive design-build, and the ability to manage design under ICD/ICS 705 security requirements. The project is divided into two phases, with Phase 1 covering design and pre-construction services and Phase 2 involving final design and construction under a negotiated firm fixed-price agreement. All facilities must be completed by April 2030. Contractual requirements include strict adherence to the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1), Davis-Bacon Act prevailing wage standards, and the Buy American Act. The agreement mandates the use of performance and payment bonds, as well as the safeguarding of Controlled Unclassified Information. Design-builders are required to actively identify and negotiate goals for small business subcontractors during Phase 1. Payments are milestone-based and processed through the Resident Management System or Construction Management Platform within 14 calendar days of acceptance.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
Federal
Coastwide Beach and Dune Ecosystem Restoration
Solicitation # W9127826RA011
The Coastwide Beach and Dune Ecosystem Restoration project, solicitation W9127826RA011, is a Firm-Fixed-Price contract issued by the U.S. Army Engineer District, Mobile. This 8(a) sole source procurement focuses on ecosystem restoration in Hancock County, Mississippi, specifically targeting the population of dune footprints with vegetation and the installation of sand fencing to promote natural dune building and sand accumulation. The scope of work includes the removal of invasive species, the collection and planting of 169,670 planting units, and the restoration of temporary support facilities. The estimated contract value ranges between 1,000,000 and 5,000,000 dollars. Performance is subject to strict quality and safety standards, including mandatory compliance with USACE EM 385-1-1 and the provision of a dedicated Site Safety and Health Officer. Final acceptance is based on an 80 percent survival rate of installed plant types and 80 percent area occupancy across four designated planting zones. The contractor must provide specialized personnel, including a Professional Land Surveyor as Party Chief and qualified turtle and bird monitors. Administrative requirements include the use of the Resident Management System for invoicing and a minimum self-performance requirement of 15 percent for the prime contractor. Proposals must be submitted via PIEE by October 30, 2026.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS